| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$14,143.26 |
$33,000.00 |
$235,000.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,300 | CY |
$10.00 |
$6.25 |
$7.31 |
$7.10 |
$7.25 |
$8.25 |
| 3 | 202(B) 0105 |
MUCK EXCAVATION | 32,500 | CY |
$11.00 |
$9.50 |
$7.64 |
$6.35 |
$6.80 |
$11.50 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,000 | CY |
$9.50 |
$8.50 |
$7.98 |
$8.85 |
$8.85 |
$10.50 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$13,050.00 |
$2,500.00 |
$10,634.03 |
$25,000.00 |
$25,000.00 |
$3,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 918 | LF |
$2.50 |
$1.25 |
$6.63 |
$2.00 |
$5.50 |
$7.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 448 | LF |
$9.00 |
$7.00 |
$33.23 |
$8.00 |
$25.00 |
$25.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 12,030 | SY |
$2.50 |
$7.30 |
$9.24 |
$4.00 |
$7.00 |
$7.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.4 | AC |
$900.00 |
$5,500.00 |
$6,579.81 |
$6,000.00 |
$4,950.00 |
$5,000.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 846 | CY |
$50.00 |
$32.00 |
$26.03 |
$64.00 |
$50.00 |
$35.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 4,600 | SY |
$1.61 |
$2.50 |
$1.60 |
$0.7000 |
$1.50 |
$3.00 |
| 12 | 407(B) 0250 |
TACK COAT | 900 | GAL |
$4.00 |
$2.00 |
$2.41 |
$1.81 |
$3.50 |
$3.50 |
| 13 | 408 5774 |
PRIME COAT | 900 | GAL |
$5.00 |
$3.00 |
$5.41 |
$4.07 |
$5.00 |
$5.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 462 | TON |
$95.00 |
$77.00 |
$95.30 |
$87.96 |
$80.00 |
$72.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 693 | TON |
$106.00 |
$80.00 |
$92.16 |
$85.06 |
$80.00 |
$79.80 |
| 16 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$20.00 |
$20.00 |
$23.93 |
$18.00 |
$18.00 |
$18.00 |
| 17 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,264.99 |
$2,000.00 |
$2,459.12 |
$1,850.00 |
$1,850.00 |
$1,850.00 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,392.03 |
$1,500.00 |
$1,728.03 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
| 19 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,480 | LF |
$5.80 |
$7.50 |
$10.57 |
$4.85 |
$5.00 |
$4.85 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$12.66 |
$25.20 |
$14.62 |
$15.00 |
$15.00 |
$50.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 88 | CY |
$150.00 |
$150.15 |
$128.94 |
$130.00 |
$140.00 |
$150.00 |
| 22 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,570 | LF |
$250.00 |
$230.00 |
$253.67 |
$288.00 |
$270.00 |
$490.00 |
| 23 | 504(A) 1304 |
APPROACH SLAB | 57.8 | SY |
$195.31 |
$186.90 |
$374.09 |
$175.00 |
$235.00 |
$350.00 |
| 24 | 504(B) 1305 |
SAW-CUT GROOVING | 1,336.3 | SY |
$5.00 |
$5.00 |
$4.98 |
$4.05 |
$4.05 |
$4.05 |
| 25 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.3 | LF |
$250.00 |
$252.00 |
$404.09 |
$250.00 |
$310.00 |
$400.00 |
| 26 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 1,116.4 | LF |
$75.00 |
$75.00 |
$95.04 |
$80.00 |
$75.00 |
$160.00 |
| 27 | 506(A) 1322 |
STRUCTURAL STEEL | 2,120 | LB |
$4.00 |
$2.10 |
$6.91 |
$2.10 |
$2.50 |
$8.00 |
| 28 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,000.00 |
$735.00 |
$1,173.73 |
$1,000.00 |
$1,000.00 |
$800.00 |
| 29 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$1,000.00 |
$840.00 |
$1,173.73 |
$1,000.00 |
$1,000.00 |
$800.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 404.9 | CY |
$625.00 |
$410.00 |
$526.52 |
$700.00 |
$750.00 |
$800.00 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 169.8 | CY |
$600.00 |
$455.00 |
$459.46 |
$700.00 |
$750.00 |
$800.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 122,660 | LB |
$1.00 |
$0.8400 |
$1.01 |
$1.00 |
$1.25 |
$1.00 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 98 | LF |
$35.00 |
$47.25 |
$43.84 |
$36.00 |
$42.00 |
$30.00 |
| 34 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 287 | LF |
$40.00 |
$47.25 |
$42.72 |
$45.00 |
$52.00 |
$35.00 |
| 35 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 98 | LF |
$10.00 |
$31.50 |
$21.27 |
$15.50 |
$10.00 |
$15.00 |
| 36 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 287 | LF |
$15.00 |
$31.50 |
$21.27 |
$19.30 |
$10.00 |
$17.50 |
| 37 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 38 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 146 | LF |
$750.00 |
$1,050.00 |
$851.11 |
$900.00 |
$850.00 |
$2,000.00 |
| 39 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$3,200.00 |
$2,100.00 |
$2,459.12 |
$1,850.00 |
$1,500.00 |
$5,000.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,992 | TON |
$50.00 |
$37.70 |
$28.84 |
$38.00 |
$34.00 |
$40.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 591 | TON |
$40.00 |
$26.70 |
$18.21 |
$28.00 |
$29.00 |
$30.00 |
| 42 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$23.00 |
$6.00 |
$18.05 |
$24.00 |
$30.00 |
$6.50 |
| 43 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 54 | LF |
$20.00 |
$6.00 |
$18.05 |
$19.00 |
$30.00 |
$6.50 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,500.00 |
$30,000.00 |
$9,304.78 |
$20,000.00 |
$45,000.00 |
$35,000.00 |
| 45 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,824 | LF |
$0.7500 |
$0.7000 |
$0.8000 |
$0.6000 |
$0.6000 |
$0.6000 |
| 46 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,500.00 |
$4,984.70 |
$3,750.00 |
$3,750.00 |
$3,750.00 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,000.00 |
$14,000.00 |
$15,602.45 |
$15,000.00 |
$10,520.00 |
$8,500.00 |
| 48 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$1,242.86 |
$2,500.00 |
$1,000.00 |
$5,100.00 |
| 49 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$130,380.00 |
$80,000.00 |
$126,146.18 |
$125,000.00 |
$150,000.00 |
$332,000.00 |