BRIDGE AND APPROACHES SH -84: OVER NORTH CANADIAN RIVER , 0.9 MILES SOUTH OF THE SH-124 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.355 MILE

Let date
Thursday, April 19, 2018
Contract
180174
J/P numbers
28927(04)
District
Division 3
County
Okfuskee
Highway
Limits
BRIDGE AND APPROACHES SH -84: OVER NORTH CANADIAN RIVER , 0.9 MILES SOUTH OF THE SH-124 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.355 MILE
Project number
STP-254C(041)PM

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,175,969
1 H & H BRIDGE COMPANY Low bidder $3,450,554 -17.4%
2 K & R BUILDERS, INC. $4,036,813 -3.3% +17.0%
3 BRIDGECO CONTRACTORS, INC. $3,962,041 -5.1% +14.8%
4 C3 Construction, Inc. $4,120,847 -1.3% +19.4%
5 MANHATTAN ROAD & BRIDGE COMPANY, LLC $4,166,836 -0.2% +20.8%
6 OVERLAND CORPORATION $4,121,882 -1.3% +19.5%
7 Frontier Bridge, Inc. $4,309,058 +3.2% +24.9%

Bid tab: unit prices 77 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 H & H BRIDGE CO…#2 K & R BUILDERS,…#3 BRIDGECO CONTRA…#4 C3 Construction…#5 MANHATTAN ROAD …#6 OVERLAND CORPOR…#7 Frontier Bridge…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $24,350.00 $25,000.00 $17,500.00 $10,644.03 $35,000.00 $116,000.00 $16,165.00
2202(A) 0183 UNCLASSIFIED EXCAVATION31,203CY $6.00 $6.15 $6.12 $4.95 $6.26 $5.00 $6.05 $6.29
3202(D) 0184 UNCLASSIFIED BORROW3,092CY $12.00 $9.05 $9.25 $8.55 $8.77 $1.00 $0.2600 $0.2700
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $6,250.00 $10,500.00 $8,000.00 $8,327.38 $6,360.00 $7,400.00 $7,685.00
5221(C) 2801 TEMPORARY SILT FENCE3,500LF $2.00 $2.99 $1.70 $3.14 $3.74 $3.00 $2.98 $3.17
6221(F) 0100 TEMPORARY SILT DIKE56LF $6.00 $15.00 $12.00 $40.95 $48.84 $9.00 $42.00 $41.34
7221(G) 0153 TEMPORARY ROCK FILTER DAM TYPE 424CY $100.00 $50.00 $100.00 $48.00 $75.13 $105.00 $165.00 $159.00
8230(A) 2806 SOLID SLAB SODDING11,253SY $2.00 $2.95 $3.30 $3.09 $3.16 $2.96 $3.05 $3.13
9233(A) 2817 VEGETATIVE MULCHING2.3AC $800.00 $1,000.00 $8,000.00 $8,200.00 $8,449.75 $2,500.00 $8,200.00 $8,374.00
10241 2832 MOWING9AC $100.00 $50.00 $150.00 $275.00 $267.40 $250.00 $275.00 $265.00
11303(A) 2100 AGGREGATE BASE TYPE A1,468CY $50.00 $52.00 $60.00 $54.60 $30.68 $50.00 $53.90 $55.99
12307(K) 4300 STABILIZED SUBGRADE6,702SY $8.00 $5.45 $6.00 $5.72 $7.20 $5.25 $6.05 $6.27
13325 5271 SEPARATOR FABRIC6,702SY $2.00 $1.30 $1.50 $1.37 $2.88 $1.10 $1.20 $1.24
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E934TON $45.00 $26.25 $31.00 $30.25 $31.06 $28.00 $27.05 $28.11
15407(B) 0250 TACK COAT1,679GAL $3.50 $3.00 $4.00 $3.80 $3.21 $3.10 $0.0100 $3.87
16408 5774 PRIME COAT1,774GAL $6.00 $5.00 $5.50 $5.20 $3.21 $5.00 $0.0100 $5.30
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,001TON $80.00 $70.00 $88.00 $83.20 $82.36 $70.00 $85.75 $84.80
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)654TON $100.00 $94.00 $110.00 $104.00 $85.57 $95.00 $100.00 $106.00
19619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $20,000.00 $5,500.00 $6,125.00 $6,500.00 $8,765.67 $11,130.00 $15,000.00 $7,314.00
20619(B) 4725 REMOVAL OF FENCE2,045LF $1.00 $1.00 $1.00 $2.00 $2.50 $2.00 $2.00 $2.12
21619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,845SY $5.00 $4.00 $6.75 $6.40 $3.76 $4.00 $2.75 $5.30
22619(B) 4780 REMOVAL OF GUARDRAIL560LF $4.00 $2.00 $4.00 $3.00 $3.76 $4.00 $3.00 $3.18
23623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE450LF $20.00 $18.50 $22.00 $19.43 $25.04 $19.00 $20.00 $21.20
24623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $1,475.00 $2,860.00 $2,500.00 $3,255.82 $2,350.00 $2,600.00 $2,756.00
25623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $2,300.00 $1,980.00 $1,875.00 $2,254.03 $2,400.00 $1,800.00 $1,908.00
26624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)380LF $4.50 $4.65 $6.05 $6.00 $6.89 $8.60 $5.50 $5.83
27624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)582LF $7.50 $5.55 $6.35 $7.50 $7.20 $9.25 $5.75 $6.10
28624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)865LF $10.00 $6.25 $7.70 $8.00 $8.77 $10.00 $7.00 $7.42
29629(A) 4958 MAILBOX INSTALLATION-SINGLE1EA $100.00 $65.00 $212.00 $300.00 $250.45 $205.00 $200.00 $212.00
30629(C) 4960 MAILBOX1EA $30.00 $55.00 $150.00 $62.50 $125.23 $55.00 $50.00 $53.00
31629(D) 4961 REMOVAL OF MAILBOX INSTALLATION1EA $15.00 $50.00 $150.00 $50.00 $125.23 $30.00 $25.00 $26.50
32501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $25.00 $100.00 $9.75 $14.00 $15.65 $40.00 $13.00 $21.20
33501(G) 6309 CLSM BACKFILL206CY $180.00 $200.00 $138.50 $160.00 $151.52 $125.00 $160.00 $182.23
34503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)2,793LF $245.00 $250.00 $227.00 $216.06 $238.19 $219.00 $230.50 $237.71
35504(A) 1304 APPROACH SLAB281.2SY $200.00 $100.00 $202.00 $179.13 $229.16 $155.00 $180.00 $232.95
36504(B) 1305 SAW-CUT GROOVING3,384.8SY $5.00 $3.60 $4.00 $3.99 $4.51 $3.80 $3.80 $4.03
37504(C) 6250 SEALED EXPANSION JOINT129.6LF $275.00 $10.00 $212.50 $275.26 $219.14 $170.00 $160.00 $193.08
38504(D) 6245 CONCRETE RAIL (TR4)1,523.4LF $75.00 $50.00 $87.00 $72.00 $89.74 $48.00 $80.00 $80.08
39506(A) 1322 STRUCTURAL STEEL3,150LB $3.00 $1.00 $2.40 $2.82 $3.44 $2.00 $1.50 $2.36
40507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY24EA $2,000.00 $1,000.00 $1,250.00 $1,250.00 $1,240.91 $1,500.00 $1,200.00 $1,393.90
41507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY32EA $2,000.00 $1,000.00 $1,250.00 $1,200.00 $1,240.91 $1,500.00 $1,200.00 $1,393.90
42509(A) 1326 CLASS AA CONCRETE811.4CY $550.00 $250.00 $562.00 $520.00 $555.87 $525.00 $575.00 $556.08
43509(B) 1328 CLASS A CONCRETE363CY $525.00 $400.00 $607.00 $535.00 $503.40 $865.00 $575.00 $566.68
44509(D) 1331 CLASS C CONCRETE15CY $325.00 $200.00 $575.00 $350.00 $317.44 $600.00 $350.00 $468.71
45511(A) 1332 REINFORCING STEEL2,120LB $1.00 $1.00 $1.10 $1.52 $1.03 $1.30 $1.00 $1.59
46511(B) 6010 EPOXY COATED REINFORCING STEEL236,810LB $1.00 $1.15 $1.04 $1.07 $1.11 $1.10 $1.00 $1.03
47514(A) 6010 PILES, FURNISHED (HP 10X42)224LF $35.00 $22.50 $28.00 $30.14 $28.39 $40.00 $29.00 $36.88
48514(A) 6011 PILES, FURNISHED (HP 12X53)736LF $45.00 $28.53 $32.20 $34.96 $35.64 $45.00 $45.00 $42.43
49514(B) 6292 PILES, DRIVEN (HP 10X42)224LF $20.00 $3.00 $12.00 $14.00 $15.03 $9.00 $10.00 $15.90
50514(B) 6294 PILES, DRIVEN (HP 12X53)736LF $20.00 $3.00 $13.80 $12.00 $15.03 $10.00 $14.00 $15.90
51514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
52515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)3,045SY $4.50 $3.50 $3.85 $3.15 $4.38 $3.10 $3.00 $3.18
53516(A) 6096 DRILLED SHAFTS 60" DIAMETER562LF $800.00 $752.00 $742.00 $871.73 $656.17 $975.00 $900.00 $869.45
54516(C) 6200 CROSSHOLE SONIC LOGGING3EA $2,000.00 $1,550.00 $2,600.00 $2,575.00 $3,819.33 $3,000.00 $2,000.00 $2,915.00
55523(A) 6550 SEALER CRACK PREPARATION122.4LF $5.00 $5.00 $5.50 $5.40 $6.26 $5.05 $5.00 $5.30
56523(B) 6560 SEALER RESIN1.5GAL $200.00 $200.00 $220.00 $275.00 $250.45 $205.00 $200.00 $212.00
57601(B) 1353 TYPE I-A PLAIN RIPRAP10,010TON $35.00 $31.00 $38.00 $39.50 $44.77 $37.00 $1.00 $39.54
58601(C) 1355 TYPE I-A FILTER BLANKET2,385TON $30.00 $26.50 $29.00 $31.50 $32.87 $29.00 $1.00 $29.28
59613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $65.00 $28.00 $30.00 $9.39 $18.00 $37.75 $31.37
60613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.83LF $20.00 $75.00 $28.00 $30.00 $9.39 $18.00 $29.00 $28.19
61619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $150,000.00 $100,000.00 $92,500.00 $123,000.00 $137,746.24 $220,000.00 $525,000.00 $270,300.00
62805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS9EA $60.00 $50.00 $55.00 $65.00 $250.45 $52.00 $50.00 $52.50
63850(A) 8110 SHEET ALUMINUM SIGNS76SF $20.00 $15.00 $15.40 $14.70 $17.53 $14.50 $14.00 $14.70
64851(C) 8327 2 1/4" SQUARE TUBE POST118LF $15.00 $12.00 $13.20 $12.60 $15.03 $12.50 $12.00 $12.60
65853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)10EA $15.00 $15.00 $16.50 $18.00 $18.78 $21.00 $15.00 $15.75
66855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)7,243LF $0.6000 $0.5500 $0.7700 $0.7400 $0.8800 $0.7200 $0.7000 $0.7400
67880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF12,600SD $0.4000 $0.2500 $0.1100 $0.1200 $0.1300 $0.1000 $0.1000 $0.1100
68880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF840SD $1.00 $1.85 $7.70 $7.28 $8.77 $10.00 $7.00 $7.35
69880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,260SD $1.50 $1.85 $0.2800 $0.2700 $0.3100 $5.50 $0.2500 $0.2600
70880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)3,780SD $2.00 $0.3500 $0.2800 $0.2700 $0.3100 $0.2500 $0.2500 $0.2600
71880(C) 8848 WING BARRICADES1,680SD $1.00 $0.0500 $0.2800 $0.2700 $0.3100 $0.2500 $0.2500 $0.2600
72880(E) 8860 WARNING LIGHTS(TYPE A)8,400SD $0.5000 $0.1000 $0.1100 $0.1200 $0.1300 $0.1000 $0.1000 $0.1100
73882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,792SD $20.00 $15.00 $7.70 $7.35 $8.77 $7.25 $7.00 $7.35
74642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $19,500.00 $16,000.00 $15,500.00 $21,037.61 $15,000.00 $15,000.00 $14,973.00
75220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $1,000.00 $20,000.00 $3,500.00 $18,783.58 $1,853.50 $2,500.00 $5,300.00
76640(A) 1398 FIELD OFFICE1EA $10,000.00 $5,000.00 $12,500.00 $8,500.00 $9,391.79 $7,100.00 $10,000.00 $15,900.00
77641 1399 MOBILIZATION1LSUM $210,000.00 $150,000.00 $190,000.00 $187,000.00 $227,281.30 $230,500.00 $225,000.00 $225,433.89