| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,500.00 |
$22,000.00 |
$18,000.00 |
$14,522.00 |
$22,000.00 |
$15,000.00 |
$17,675.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,580 | CY |
$9.00 |
$5.00 |
$10.95 |
$13.20 |
$10.00 |
$9.85 |
$8.80 |
$20.00 |
$15.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,444 | CY |
$10.00 |
$10.00 |
$11.00 |
$9.00 |
$14.50 |
$13.74 |
$13.20 |
$25.00 |
$29.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.50 |
$2.22 |
$2.35 |
$3.00 |
$4.00 |
$2.12 |
$2.20 |
$2.50 |
$2.10 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$10.00 |
$9.75 |
$8.50 |
$15.00 |
$8.50 |
$14.84 |
$15.40 |
$15.00 |
$9.35 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 20 | CY |
$120.00 |
$125.00 |
$188.00 |
$51.00 |
$150.00 |
$106.00 |
$124.45 |
$85.00 |
$210.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 10,230 | SY |
$2.50 |
$2.35 |
$2.40 |
$2.25 |
$2.45 |
$2.06 |
$2.15 |
$2.40 |
$2.10 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.24 | AC |
$500.00 |
$1,000.00 |
$150.00 |
$300.00 |
$675.00 |
$265.00 |
$275.00 |
$300.00 |
$1,023.00 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,947 | SY |
$6.00 |
$7.00 |
$8.90 |
$13.00 |
$8.95 |
$11.98 |
$11.00 |
$11.00 |
$13.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$28.00 |
$29.00 |
$30.00 |
$29.00 |
$30.00 |
$28.62 |
$29.70 |
$35.00 |
$39.60 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 581 | TON |
$75.00 |
$114.00 |
$109.60 |
$115.00 |
$104.00 |
$105.59 |
$109.57 |
$120.00 |
$102.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 349 | TON |
$85.00 |
$115.00 |
$107.30 |
$104.00 |
$102.00 |
$103.38 |
$107.28 |
$120.00 |
$99.70 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$400.00 |
$300.00 |
$300.00 |
$350.00 |
$583.00 |
$394.20 |
$500.00 |
$523.00 |
| 14 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 256 | TON |
$45.00 |
$46.00 |
$47.00 |
$43.00 |
$55.00 |
$68.90 |
$47.45 |
$55.00 |
$57.80 |
| 15 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 32 | LF |
$50.00 |
$30.00 |
$60.00 |
$31.75 |
$55.00 |
$75.26 |
$52.10 |
$70.00 |
$88.90 |
| 16 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$515.00 |
$800.00 |
$1,015.00 |
$663.00 |
$500.00 |
$1,048.34 |
$516.51 |
$1,000.00 |
$823.00 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$3,500.00 |
$3,000.00 |
$10,000.00 |
$2,120.00 |
$11,000.00 |
$5,000.00 |
$8,160.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$22.00 |
$22.00 |
$25.00 |
$22.00 |
$19.00 |
$21.20 |
$22.00 |
$25.00 |
$19.90 |
| 19 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,800.00 |
$1,650.00 |
$1,650.00 |
$1,700.00 |
$1,400.00 |
$1,590.00 |
$1,650.00 |
$1,700.00 |
$1,469.00 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,650.00 |
$1,650.00 |
$1,700.00 |
$1,780.00 |
$1,590.00 |
$1,650.00 |
$1,700.00 |
$1,868.00 |
| 21 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,089 | LF |
$6.00 |
$5.50 |
$5.50 |
$6.00 |
$8.00 |
$5.30 |
$8.14 |
$6.00 |
$7.75 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$25.00 |
$10.00 |
$11.50 |
$12.00 |
$25.00 |
$37.10 |
$27.50 |
$20.00 |
$18.80 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$175.00 |
$150.00 |
$186.00 |
$201.00 |
$235.00 |
$269.29 |
$206.13 |
$180.00 |
$194.00 |
| 24 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$250.00 |
$200.00 |
$215.50 |
$217.39 |
$240.00 |
$218.60 |
$259.24 |
$220.00 |
$210.50 |
| 25 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$235.00 |
$190.00 |
$240.00 |
$264.50 |
$220.00 |
$207.20 |
$278.15 |
$200.00 |
$276.50 |
| 26 | 504(B) 1305 |
SAW-CUT GROOVING | 297.8 | SY |
$5.00 |
$12.00 |
$12.00 |
$13.00 |
$4.90 |
$12.72 |
$12.10 |
$15.00 |
$11.50 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 226.6 | LF |
$75.00 |
$80.00 |
$81.00 |
$82.00 |
$90.00 |
$85.52 |
$132.42 |
$140.00 |
$100.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$2.85 |
$3.00 |
$3.00 |
$4.00 |
$3.00 |
$3.27 |
$2.80 |
$3.00 |
$14.10 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,150.00 |
$550.00 |
$445.00 |
$660.00 |
$500.00 |
$811.77 |
$1,382.64 |
$1,200.00 |
$598.50 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 85.5 | CY |
$600.00 |
$600.00 |
$687.50 |
$625.00 |
$725.00 |
$897.26 |
$606.36 |
$600.00 |
$709.50 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$650.00 |
$600.00 |
$699.00 |
$700.00 |
$725.00 |
$897.26 |
$619.97 |
$600.00 |
$886.50 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 21,470 | LB |
$1.00 |
$0.9500 |
$1.00 |
$1.07 |
$1.10 |
$1.57 |
$1.23 |
$1.50 |
$1.40 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 912 | LF |
$35.00 |
$25.00 |
$25.20 |
$21.50 |
$45.00 |
$24.28 |
$34.40 |
$30.00 |
$26.70 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 912 | LF |
$20.00 |
$15.00 |
$10.80 |
$14.00 |
$10.00 |
$15.90 |
$16.50 |
$35.00 |
$18.20 |
| 35 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 573 | TON |
$45.00 |
$46.00 |
$45.85 |
$42.10 |
$55.00 |
$50.69 |
$52.95 |
$55.00 |
$50.40 |
| 37 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 167 | TON |
$38.00 |
$36.00 |
$34.00 |
$41.00 |
$45.00 |
$38.58 |
$35.75 |
$45.00 |
$42.20 |
| 38 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$28.00 |
$50.00 |
$40.00 |
$31.80 |
$25.66 |
$25.00 |
$56.30 |
| 39 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$30.00 |
$28.00 |
$45.00 |
$40.00 |
$31.80 |
$14.17 |
$25.00 |
$21.40 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$10,925.00 |
$18,000.00 |
$16,000.00 |
$17,960.64 |
$27,500.00 |
$25,000.00 |
$45,520.00 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$4,000.00 |
$3,900.00 |
$2,300.00 |
$3,180.00 |
$3,300.00 |
$5,000.00 |
$2,414.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$3,300.00 |
$6,500.00 |
$7,600.00 |
$6,850.00 |
$4,770.00 |
$7,150.00 |
$10,000.00 |
$10,035.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$3,000.00 |
$2,000.00 |
$3,000.00 |
$1,275.00 |
$2,650.00 |
$2,750.00 |
$2,500.00 |
$2,886.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,190.00 |
$32,500.00 |
$56,500.00 |
$41,000.00 |
$62,000.00 |
$56,805.36 |
$62,061.16 |
$60,000.00 |
$64,456.58 |