| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 57,890 | CY |
$10.00 |
$4.50 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 29,062 | CY |
$8.50 |
$6.00 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6.00 |
$12,000.00 |
$10,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,210 | LF |
$3.00 |
$2.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 70 | LF |
$8.50 |
$7.50 |
$25.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 11,702 | SY |
$2.50 |
$7.50 |
$7.00 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 4.31 | AC |
$500.00 |
$9,950.00 |
$9,950.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.31 | AC |
$250.00 |
$9,950.00 |
$9,950.00 |
| 10 | 241 2832 |
MOWING | 31.56 | AC |
$150.00 |
$75.00 |
$100.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,399 | CY |
$55.00 |
$40.00 |
$50.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 8,784 | SY |
$4.70 |
$7.50 |
$10.00 |
| 13 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 12,480 | SY |
$4.50 |
$3.75 |
$4.00 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 3,276 | SY |
$1.50 |
$1.75 |
$2.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,626 | TON |
$22.00 |
$23.00 |
$15.00 |
| 16 | 407(B) 0250 |
TACK COAT | 2,387 | GAL |
$2.00 |
$3.50 |
$2.00 |
| 17 | 408 5774 |
PRIME COAT | 5,710 | GAL |
$2.50 |
$5.25 |
$2.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,349 | TON |
$64.00 |
$73.00 |
$70.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,689 | TON |
$67.00 |
$95.00 |
$80.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 4,889 | SY |
$3.00 |
$6.00 |
$5.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 17 | CY |
$32.00 |
$14.00 |
$60.00 |
| 22 | 501(G) 6309 |
CLSM BACKFILL | 94 | CY |
$180.00 |
$120.00 |
$125.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 9 | CY |
$600.00 |
$300.00 |
$1,000.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 1,560 | LB |
$0.9000 |
$1.25 |
$2.00 |
| 25 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$60,000.00 |
$90,000.00 |
$125,000.00 |
| 26 | 613(A) 4518 |
73" X 45" R.C.PIPE ARCH CLASS A-IV | 189 | LF |
$360.00 |
$380.00 |
$450.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 60 | LF |
$18.00 |
$28.00 |
$60.00 |
| 28 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 87 | LF |
$70.00 |
$85.00 |
$80.00 |
| 29 | 613(B) 4533 |
64" X 43" CORR. GALV. STEEL PIPE ARCH | 82 | LF |
$149.50 |
$115.00 |
$100.00 |
| 30 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 139 | LF |
$15.00 |
$15.00 |
$5.00 |
| 31 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 47 | LF |
$75.00 |
$14.00 |
$5.00 |
| 32 | 613(L) 4559 |
73" X 45" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$4,560.00 |
$6,700.00 |
$6,500.00 |
| 33 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$850.00 |
$500.00 |
$1,500.00 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$12,414.00 |
| 35 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,974 | SY |
$2.20 |
$2.00 |
$10.00 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 980 | LF |
$6.00 |
$2.75 |
$5.00 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 519 | LF |
$3.50 |
$8.00 |
$5.00 |
| 38 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,138 | LF |
$5.15 |
$7.25 |
$7.00 |
| 39 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$55,000.00 |
$50,000.00 |
$445,500.00 |
| 40 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 11,800 | LF |
$0.2000 |
$0.3500 |
$0.5000 |
| 41 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$6.00 |
$6.25 |
$5.50 |
| 42 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 838 | LF |
$25.00 |
$15.00 |
$15.00 |
| 43 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,016 | SD |
$0.3000 |
$0.2500 |
$0.1000 |
| 44 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 864 | SD |
$0.6000 |
$0.2500 |
$0.1000 |
| 45 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,880 | SD |
$1.00 |
$0.2500 |
$0.1000 |
| 46 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.7500 |
$0.1000 |
$1.00 |
| 47 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$1.40 |
$0.0700 |
$0.1000 |
| 48 | 880(D) 8854 |
VERTICAL PANELS | 11,520 | SD |
$0.2000 |
$0.0700 |
$0.1000 |
| 49 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,456 | SD |
$0.4000 |
$0.5500 |
$0.0500 |
| 50 | 880(F) 8878 |
DRUMS | 3,456 | SD |
$0.6000 |
$3.00 |
$0.1000 |
| 51 | 880(G) 8890 |
CHANNELIZER CONES | 1,152 | SD |
$0.3500 |
$3.00 |
$0.1000 |
| 52 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$24.00 |
$5.50 |
$15.00 |
| 53 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$62.80 |
$75.00 |
$150.00 |
| 54 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 11,019 | LF |
$0.4500 |
$1.25 |
$0.5000 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$14,500.00 |
$27,271.90 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$7,500.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$55,000.00 |
$165,000.00 |