| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$14,500.00 |
$7,500.00 |
$15,000.00 |
$14,820.00 |
$25,000.00 |
$5,500.00 |
$5,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,335 | CY |
$7.00 |
$16.50 |
$12.00 |
$13.50 |
$25.30 |
$12.20 |
$19.69 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 685 | CY |
$8.00 |
$16.75 |
$15.00 |
$16.75 |
$14.10 |
$23.00 |
$11.00 |
$12.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.00 |
$2.50 |
$3.65 |
$1.89 |
$5.25 |
$2.15 |
$3.73 |
$5.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$10.00 |
$17.00 |
$22.80 |
$7.14 |
$21.00 |
$12.00 |
$23.25 |
$7.50 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 20 | CY |
$120.00 |
$150.00 |
$225.00 |
$62.00 |
$315.00 |
$85.00 |
$165.00 |
$75.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 7,216 | SY |
$2.00 |
$5.27 |
$4.39 |
$1.85 |
$6.30 |
$2.50 |
$4.83 |
$5.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.12 | AC |
$500.00 |
$2,000.00 |
$2,875.00 |
$550.00 |
$2,099.00 |
$650.00 |
$3,162.50 |
$1,200.00 |
| 9 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 392 | CY |
$40.00 |
$68.28 |
$60.00 |
$65.00 |
$59.70 |
$56.10 |
$62.59 |
$100.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,352 | SY |
$5.00 |
$8.52 |
$7.50 |
$9.00 |
$7.45 |
$9.45 |
$7.81 |
$11.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 2,880 | SY |
$1.50 |
$1.50 |
$1.30 |
$2.00 |
$1.30 |
$1.25 |
$1.38 |
$2.20 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 381 | TON |
$30.00 |
$29.00 |
$37.00 |
$36.60 |
$45.20 |
$23.40 |
$33.90 |
$39.00 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 441 | TON |
$65.00 |
$85.38 |
$76.00 |
$122.30 |
$74.70 |
$88.35 |
$78.27 |
$120.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 252 | TON |
$75.00 |
$126.00 |
$112.00 |
$154.00 |
$110.00 |
$123.25 |
$115.50 |
$160.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 140 | CY |
$270.00 |
$238.00 |
$390.00 |
$275.00 |
$189.00 |
$171.20 |
$202.48 |
$500.00 |
| 16 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 389 | TON |
$40.00 |
$46.00 |
$44.00 |
$41.50 |
$48.30 |
$46.95 |
$49.47 |
$75.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 34 | LF |
$32.25 |
$32.00 |
$56.00 |
$36.44 |
$57.60 |
$44.95 |
$37.52 |
$45.00 |
| 18 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 64 | LF |
$34.00 |
$38.00 |
$45.00 |
$44.00 |
$40.80 |
$35.30 |
$42.29 |
$50.00 |
| 19 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$260.00 |
$225.00 |
$350.00 |
$524.00 |
$140.00 |
$301.06 |
$1,000.00 |
| 20 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$950.00 |
$315.00 |
$350.00 |
$375.00 |
$368.00 |
$190.00 |
$347.60 |
$950.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$5,000.00 |
$5,500.00 |
$4,500.00 |
$4,937.00 |
$13,850.00 |
$3,850.00 |
$5,000.00 |
| 22 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 852 | LF |
$6.00 |
$8.80 |
$7.15 |
$8.35 |
$7.50 |
$5.30 |
$7.87 |
$16.00 |
| 23 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 888 | LF |
$6.00 |
$9.90 |
$8.35 |
$9.15 |
$8.35 |
$5.30 |
$8.74 |
$10.00 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$32.00 |
$15.00 |
$25.00 |
$16.00 |
$27.70 |
$29.40 |
$38.50 |
$20.00 |
| 25 | 501(F) 6352 |
GRANULAR BACKFILL | 102 | CY |
$60.00 |
$74.00 |
$85.00 |
$78.24 |
$80.20 |
$75.80 |
$55.43 |
$80.00 |
| 26 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$230.00 |
$261.00 |
$260.00 |
$263.85 |
$242.50 |
$268.45 |
$297.19 |
$235.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 230 | SY |
$4.25 |
$11.00 |
$9.10 |
$12.10 |
$9.55 |
$9.90 |
$11.11 |
$20.00 |
| 28 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 261.3 | LF |
$80.00 |
$84.00 |
$95.00 |
$81.00 |
$122.00 |
$128.85 |
$93.28 |
$125.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 330 | LB |
$2.00 |
$3.00 |
$3.00 |
$4.15 |
$10.90 |
$1.42 |
$2.47 |
$13.00 |
| 30 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$1,280.00 |
$1,400.00 |
$1,157.92 |
$1,728.00 |
$1,175.00 |
$1,617.39 |
$750.00 |
| 31 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$1,280.00 |
$1,400.00 |
$1,157.92 |
$1,728.00 |
$1,175.00 |
$1,617.39 |
$750.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 74.2 | CY |
$550.00 |
$685.00 |
$700.00 |
$720.00 |
$811.00 |
$1,189.30 |
$945.44 |
$700.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$626.00 |
$700.00 |
$700.00 |
$735.00 |
$923.00 |
$1,085.25 |
$945.44 |
$500.00 |
| 34 | 509(D) 1331 |
CLASS C CONCRETE | 259 | CY |
$650.00 |
$238.00 |
$275.00 |
$315.00 |
$192.50 |
$234.25 |
$169.48 |
$400.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 30,790 | LB |
$1.00 |
$1.00 |
$1.10 |
$1.12 |
$1.60 |
$1.14 |
$1.63 |
$2.50 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 284 | LF |
$31.00 |
$33.60 |
$40.00 |
$30.85 |
$34.10 |
$37.00 |
$27.99 |
$45.00 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 925 | LF |
$35.00 |
$35.00 |
$48.00 |
$33.35 |
$39.00 |
$42.80 |
$33.85 |
$20.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 284 | LF |
$15.00 |
$14.40 |
$10.00 |
$16.00 |
$20.30 |
$17.45 |
$22.00 |
$45.00 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 925 | LF |
$20.00 |
$15.00 |
$10.00 |
$14.00 |
$16.90 |
$16.05 |
$22.00 |
$20.00 |
| 40 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 41 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,870 | TON |
$40.00 |
$42.00 |
$45.00 |
$41.50 |
$44.00 |
$40.25 |
$49.47 |
$55.00 |
| 42 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 410 | TON |
$36.00 |
$31.50 |
$37.00 |
$37.50 |
$35.60 |
$32.40 |
$39.44 |
$45.00 |
| 43 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$28.00 |
$42.25 |
$35.00 |
$35.00 |
$50.40 |
$39.00 |
$22.93 |
$40.00 |
| 44 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 38 | LF |
$26.50 |
$36.00 |
$35.00 |
$30.00 |
$51.50 |
$45.45 |
$22.93 |
$50.00 |
| 45 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$28,250.00 |
$10,000.00 |
$32,500.00 |
$15,640.00 |
$75,000.00 |
$41,250.00 |
$10,000.00 |
| 46 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 20 | LF |
$19.00 |
$72.00 |
$60.00 |
$67.20 |
$63.00 |
$54.50 |
$66.00 |
$60.00 |
| 47 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,850.00 |
$1,935.00 |
$1,615.00 |
$2,250.00 |
$1,695.00 |
$1,990.00 |
$1,776.50 |
$1,850.00 |
| 48 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 3 | EA |
$1,500.00 |
$1,730.00 |
$1,450.00 |
$2,250.00 |
$1,522.00 |
$1,990.00 |
$1,595.00 |
$1,650.00 |
| 49 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,525.00 |
$4,265.00 |
$2,650.00 |
$3,050.00 |
$9,938.50 |
$5,000.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$5,500.00 |
$9,500.00 |
$10,390.00 |
$15,000.00 |
$14,311.00 |
$10,000.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,900.00 |
$500.00 |
$3,500.00 |
$3,516.00 |
$3,000.00 |
$2,200.00 |
$2,500.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$65,618.72 |
$70,000.00 |
$70,000.00 |
$57,500.00 |
$95,602.87 |
$80,000.00 |
$115,837.21 |
$50,000.00 |