| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$24,000.00 |
$40,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,370 | CY |
$13.00 |
$15.00 |
$21.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$18,000.00 |
$48,565.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 21,900 | LF |
$1.50 |
$1.00 |
$1.35 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 70 | EA |
$500.00 |
$150.00 |
$60.00 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 600 | LF |
$5.00 |
$12.00 |
$2.15 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 24,324 | SY |
$2.00 |
$3.95 |
$3.70 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 895 | CY |
$50.00 |
$47.00 |
$69.00 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 14,257 | SY |
$2.00 |
$1.50 |
$0.1000 |
| 10 | 504(F) 6006 |
HANDRAILING | 161 | LF |
$70.00 |
$225.00 |
$125.00 |
| 11 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 34 | LF |
$15.00 |
$25.00 |
$17.00 |
| 12 | 609(B) 0384 |
COMBINED CURB & GUTTER (8" BARRIER) | 2,346 | LF |
$25.00 |
$23.00 |
$35.00 |
| 13 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 12,355 | SY |
$50.00 |
$55.00 |
$50.00 |
| 14 | 610(A) 0650 |
4" DECORATIVE CONCRETE SIDEWALK | 365 | SY |
$70.00 |
$105.00 |
$110.00 |
| 15 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 3,149 | SY |
$55.00 |
$62.00 |
$65.00 |
| 16 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 903 | SF |
$25.00 |
$25.00 |
$16.00 |
| 17 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 6 | EA |
$800.00 |
$1,000.00 |
$1,100.00 |
| 18 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 3 | EA |
$300.00 |
$400.00 |
$100.00 |
| 19 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 2 | EA |
$425.00 |
$400.00 |
$510.00 |
| 20 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 3,387 | LF |
$7.50 |
$7.00 |
$8.00 |
| 21 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 808 | SY |
$15.00 |
$12.00 |
$14.00 |
| 22 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 2,596 | SY |
$12.00 |
$12.00 |
$16.00 |
| 23 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 579 | SY |
$10.00 |
$12.00 |
$16.00 |
| 24 | 632 0300 |
(PL) SITESCAPING | 1 | LSUM |
$15,000.00 |
$2,000.00 |
$15,000.00 |
| 25 | 805(B) 8728 |
(PL)RESET OF PULL BOX | 4 | EA |
$600.00 |
$600.00 |
$1,350.00 |
| 26 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 44 | EA |
$300.00 |
$85.00 |
$105.00 |
| 27 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 1,906 | LF |
$7.00 |
$5.90 |
$6.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$5,700.00 |
$15,000.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$11,400.00 |
$25,000.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$500.00 |
$10,000.00 |
| 31 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$102,000.00 |
$100,000.00 |