| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$67,000.00 |
$37,536.77 |
$55,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 30,004 | CY |
$6.00 |
$5.20 |
$4.97 |
$5.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,796 | CY |
$8.00 |
$7.65 |
$7.37 |
$7.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$89,000.00 |
$58,578.44 |
$75,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 20,806 | LF |
$1.80 |
$1.25 |
$1.19 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,186 | LF |
$8.00 |
$6.10 |
$5.88 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 168,529 | SY |
$2.00 |
$1.24 |
$1.18 |
$1.25 |
| 8 | 230(F) 2812 |
WATERING | 6,741.16 | KGAL |
$6.00 |
$1.65 |
$1.58 |
$4.50 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 34.82 | AC |
$522.00 |
$484.00 |
$466.00 |
$440.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 34.82 | AC |
$650.00 |
$657.00 |
$685.00 |
$220.00 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 16.85 | TON |
$800.00 |
$670.00 |
$645.00 |
$660.00 |
| 12 | 234(A) 4409 |
FERTILIZING (18-46-0) | 2.61 | TON |
$1,250.00 |
$1,245.00 |
$1,000.00 |
$825.00 |
| 13 | 241 2832 |
MOWING | 34.82 | AC |
$120.00 |
$81.00 |
$78.00 |
$110.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 42,930 | SY |
$5.25 |
$6.89 |
$7.30 |
$8.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 340.8 | TON |
$60.00 |
$52.00 |
$46.00 |
$65.00 |
| 16 | 407(B) 0250 |
TACK COAT | 14,512.3 | GAL |
$3.25 |
$3.64 |
$2.50 |
$2.50 |
| 17 | 408 5774 |
PRIME COAT | 19,026.3 | GAL |
$4.25 |
$3.78 |
$4.00 |
$4.00 |
| 18 | 409(A) 4245 |
SELF ADHESIVE STRESS RELIEF FABRIC INTERLAYER | 12,666.7 | SY |
$16.00 |
$10.60 |
$10.00 |
$7.40 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 8,611.23 | TON |
$90.00 |
$85.00 |
$90.00 |
$91.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 27,588.18 | TON |
$80.00 |
$75.00 |
$84.50 |
$83.00 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,849.93 | TON |
$96.00 |
$97.00 |
$104.00 |
$99.00 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,136.38 | TON |
$92.00 |
$81.50 |
$98.00 |
$90.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 51,466.7 | SY |
$3.00 |
$2.70 |
$2.00 |
$1.50 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 92.91 | CY |
$20.00 |
$9.35 |
$20.00 |
$20.00 |
| 25 | 501(G) 6315 |
CLSM BACKFILL | 1 | CY |
$1,000.00 |
$266.00 |
$750.00 |
$350.00 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 237.32 | CY |
$460.00 |
$991.00 |
$600.22 |
$450.00 |
| 27 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 13.29 | CY |
$560.00 |
$1,007.50 |
$724.34 |
$450.00 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$522.00 |
$252.00 |
$400.00 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 38,673 | LB |
$1.00 |
$0.8500 |
$1.10 |
$1.00 |
| 30 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 252 | LF |
$40.00 |
$60.00 |
$57.62 |
$60.00 |
| 31 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 1,359 | LF |
$35.00 |
$51.50 |
$49.57 |
$52.00 |
| 32 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 8 | EA |
$1,500.00 |
$2,190.00 |
$1,252.00 |
$1,650.00 |
| 33 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 32 | EA |
$1,500.00 |
$2,635.00 |
$1,348.00 |
$2,250.00 |
| 34 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$3,631.00 |
$1,845.00 |
$3,300.00 |
| 35 | 619(B) 0291 |
REMOVAL OF HEADWALL | 18 | EA |
$1,200.00 |
$716.00 |
$750.00 |
$500.00 |
| 36 | 619(B) 4725 |
REMOVAL OF FENCE | 13,984 | LF |
$1.75 |
$1.60 |
$1.20 |
$1.00 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,554 | SY |
$4.00 |
$7.90 |
$4.00 |
$6.00 |
| 38 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 241 | SY |
$8.50 |
$4.00 |
$3.85 |
$4.00 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 38,000 | LF |
$3.50 |
$3.30 |
$3.50 |
$2.50 |
| 40 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 13,619 | LF |
$5.00 |
$5.00 |
$4.85 |
$4.25 |
| 41 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 341 | LF |
$7.00 |
$5.20 |
$5.00 |
$4.35 |
| 42 | 624(E) 4291 |
FENCE-STYLE CLF (5'HIGH, CLASS B) | 419 | LF |
$30.00 |
$14.50 |
$14.00 |
$22.50 |
| 43 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$90.00 |
$83.00 |
$80.00 |
$80.00 |
| 44 | 629(C) 4960 |
MAILBOX | 5 | EA |
$40.00 |
$14.50 |
$28.00 |
$28.00 |
| 45 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$25.00 |
$18.70 |
$18.00 |
$18.00 |
| 46 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$12.00 |
$7.25 |
$10.00 |
$20.00 |
| 47 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 92 | CY |
$25.00 |
$7.25 |
$20.00 |
$20.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 199.4 | CY |
$450.00 |
$535.00 |
$421.00 |
$420.00 |
| 49 | 511(A) 1332 |
REINFORCING STEEL | 29,980 | LB |
$1.00 |
$0.8500 |
$0.8900 |
$1.00 |
| 50 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$10,550.00 |
$7,500.00 |
$5,000.00 |
| 51 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 660 | CY |
$12.00 |
$7.25 |
$10.00 |
$15.00 |
| 52 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 264 | CY |
$25.00 |
$7.25 |
$20.00 |
$15.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 404 | CY |
$450.00 |
$545.00 |
$421.00 |
$420.00 |
| 54 | 511(A) 1332 |
REINFORCING STEEL | 61,790 | LB |
$1.00 |
$0.8500 |
$0.8900 |
$1.00 |
| 55 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$11,000.00 |
$10,000.00 |
$10,000.00 |
| 56 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 800 | CY |
$12.00 |
$7.25 |
$10.00 |
$15.00 |
| 57 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 213 | CY |
$25.00 |
$7.25 |
$20.00 |
$15.00 |
| 58 | 509(A) 1326 |
CLASS AA CONCRETE | 541.1 | CY |
$425.00 |
$537.00 |
$421.00 |
$420.00 |
| 59 | 511(A) 1332 |
REINFORCING STEEL | 81,850 | LB |
$1.00 |
$0.8500 |
$0.8900 |
$1.00 |
| 60 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$11,000.00 |
$10,000.00 |
$10,000.00 |
| 61 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 20 | DAY |
$490.00 |
$490.00 |
$490.00 |
$490.00 |
| 62 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 38,000 | LF |
$0.1500 |
$0.1000 |
$0.0900 |
$0.1500 |
| 63 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,320.00 |
$625.00 |
$600.00 |
$600.00 |
| 64 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 282.56 | SF |
$25.00 |
$18.70 |
$18.00 |
$18.00 |
| 65 | 851(C) 8324 |
2" SQUARE TUBE POST | 133 | LF |
$8.00 |
$8.30 |
$8.00 |
$8.00 |
| 66 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 441 | LF |
$9.00 |
$9.35 |
$9.00 |
$9.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 78,632 | LF |
$0.4000 |
$0.4200 |
$0.3000 |
$0.3000 |
| 68 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 122,080 | LF |
$0.2300 |
$0.1000 |
$0.0900 |
$0.0900 |
| 69 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 7,932 | EA |
$0.7500 |
$0.5000 |
$0.4800 |
$0.4800 |
| 70 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.2500 |
$0.7500 |
$0.6800 |
$0.6800 |
| 71 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,140 | SD |
$14.00 |
$7.25 |
$7.00 |
$7.00 |
| 72 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 275 | SD |
$14.00 |
$3.10 |
$3.00 |
$3.00 |
| 73 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 280 | LF |
$21.00 |
$28.00 |
$27.00 |
$27.00 |
| 74 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 280 | LF |
$3.00 |
$2.60 |
$2.50 |
$2.50 |
| 75 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,600 | SD |
$0.2500 |
$1.55 |
$1.50 |
$1.50 |
| 76 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,400 | SD |
$0.8000 |
$1.70 |
$1.60 |
$1.60 |
| 77 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,700 | SD |
$1.42 |
$1.70 |
$1.65 |
$1.65 |
| 78 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,700 | SD |
$0.5000 |
$0.1000 |
$0.0500 |
$0.0500 |
| 79 | 880(C) 8848 |
WING BARRICADES | 1,100 | SD |
$0.8500 |
$0.1000 |
$0.1000 |
$0.1000 |
| 80 | 880(D) 8854 |
VERTICAL PANELS | 19,250 | SD |
$0.2000 |
$0.0500 |
$0.0300 |
$0.0300 |
| 81 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 22,000 | SD |
$0.1500 |
$0.0500 |
$0.0200 |
$0.0200 |
| 82 | 880(F) 8878 |
DRUMS | 38,500 | SD |
$0.3500 |
$0.0500 |
$0.0200 |
$0.0200 |
| 83 | 880(G) 8890 |
CHANNELIZER CONES | 38,500 | SD |
$0.2600 |
$0.3000 |
$0.2800 |
$0.2800 |
| 84 | 880(I) 8902 |
FLAGGER | 190 | SD |
$200.00 |
$110.00 |
$200.00 |
$450.00 |
| 85 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$5,500.00 |
$6,500.00 |
$5,000.00 |
$60,000.00 |
| 86 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$14.00 |
$29.00 |
$28.00 |
$28.00 |
| 87 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$105,000.00 |
$82,700.00 |
$97,500.00 |
| 88 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$30,000.00 |
$30,000.00 |
$17,000.00 |
$40,000.00 |
| 89 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$650,000.00 |
$475,000.00 |
$596,000.00 |
$604,000.00 |
| 90 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$51,500.00 |
$22,617.65 |
$35,000.00 |
| 91 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 36,776 | CY |
$6.00 |
$4.40 |
$4.22 |
$4.50 |
| 92 | 202(D) 0184 |
UNCLASSIFIED BORROW | 99,869 | CY |
$8.00 |
$9.35 |
$9.02 |
$9.25 |
| 93 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$160,000.00 |
$127,009.95 |
$150,000.00 |
| 94 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,702 | LF |
$1.80 |
$1.25 |
$1.18 |
$2.50 |
| 95 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,106 | LF |
$8.00 |
$6.10 |
$5.88 |
$7.00 |
| 96 | 221(K) 0600 |
TEMPORARY FIBER LOG | 11,840 | LF |
$3.00 |
$4.30 |
$4.12 |
$2.50 |
| 97 | 230(A) 2806 |
SOLID SLAB SODDING | 101,350 | SY |
$1.70 |
$1.24 |
$1.18 |
$1.25 |
| 98 | 230(F) 2812 |
WATERING | 4,054 | KGAL |
$6.00 |
$1.65 |
$1.58 |
$4.40 |
| 99 | 232(B) 2814 |
SEEDING METHOD B | 23.62 | AC |
$522.00 |
$485.00 |
$466.00 |
$440.00 |
| 100 | 233(A) 2817 |
VEGETATIVE MULCHING | 23.62 | AC |
$650.00 |
$657.00 |
$685.00 |
$220.00 |
| 101 | 234(A) 2824 |
FERTILIZING (10-20-10) | 10.14 | TON |
$800.00 |
$670.00 |
$645.00 |
$660.00 |
| 102 | 234(A) 4409 |
FERTILIZING (18-46-0) | 1.57 | TON |
$1,250.00 |
$1,245.00 |
$1,000.00 |
$825.00 |
| 103 | 241 2832 |
MOWING | 20.96 | AC |
$120.00 |
$81.00 |
$78.00 |
$110.00 |
| 104 | 307(K) 4300 |
STABILIZED SUBGRADE | 32,944.2 | SY |
$5.25 |
$6.89 |
$7.30 |
$8.00 |
| 105 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 81 | TON |
$60.00 |
$52.00 |
$46.00 |
$65.00 |
| 106 | 407(B) 0250 |
TACK COAT | 7,283.34 | GAL |
$3.25 |
$3.65 |
$2.50 |
$2.50 |
| 107 | 408 5774 |
PRIME COAT | 12,663.16 | GAL |
$4.25 |
$3.78 |
$4.00 |
$4.00 |
| 108 | 409(A) 4245 |
SELF ADHESIVE STRESS RELIEF FABRIC INTERLAYER | 2,980.3 | SY |
$16.00 |
$10.60 |
$10.00 |
$7.40 |
| 109 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 4,442.19 | TON |
$90.00 |
$85.00 |
$90.00 |
$91.00 |
| 110 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,687.72 | TON |
$80.00 |
$75.00 |
$84.50 |
$84.00 |
| 111 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,180.5 | TON |
$96.00 |
$97.00 |
$104.00 |
$99.00 |
| 112 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,300.17 | TON |
$92.00 |
$81.50 |
$98.00 |
$98.00 |
| 113 | 412 5267 |
COLD MILLING PAVEMENT | 12,213.4 | SY |
$3.00 |
$3.80 |
$2.00 |
$1.50 |
| 114 | 501(G) 6315 |
CLSM BACKFILL | 1 | CY |
$1,000.00 |
$1,040.00 |
$750.00 |
$350.00 |
| 115 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$522.00 |
$250.00 |
$450.00 |
| 116 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 104 | LF |
$65.00 |
$74.50 |
$71.71 |
$75.00 |
| 117 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 104 | LF |
$120.00 |
$142.00 |
$136.73 |
$145.00 |
| 118 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 134 | LF |
$28.00 |
$37.50 |
$36.16 |
$40.00 |
| 119 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 84 | LF |
$45.00 |
$73.00 |
$70.36 |
$75.00 |
| 120 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$40.00 |
$47.00 |
$45.25 |
$50.00 |
| 121 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,725.00 |
$1,100.00 |
$1,250.00 |
| 122 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$1,785.00 |
$1,275.00 |
$1,750.00 |
| 123 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$3,000.00 |
$2,272.50 |
$3,300.00 |
| 124 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$2,190.00 |
$1,252.00 |
$2,200.00 |
| 125 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 3 | EA |
$1,500.00 |
$2,635.00 |
$1,348.00 |
$2,750.00 |
| 126 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 49.3 | CY |
$45.00 |
$46.00 |
$44.03 |
$44.03 |
| 127 | 613(V) 1180 |
TRENCH EXCAVATION | 78 | CY |
$15.00 |
$22.15 |
$21.35 |
$21.35 |
| 128 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,200.00 |
$7,400.00 |
$750.00 |
$500.00 |
| 129 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 15,676 | SY |
$4.00 |
$3.90 |
$4.00 |
$6.00 |
| 130 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 2 | EA |
$2,000.00 |
$2,120.00 |
$7,112.40 |
$7,112.40 |
| 131 | 619(C) 0924 |
SAWING PAVEMENT | 10,610 | LF |
$3.50 |
$3.30 |
$3.50 |
$2.56 |
| 132 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 850 | LF |
$18.00 |
$20.00 |
$19.00 |
$19.00 |
| 133 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,025.00 |
$1,950.00 |
$1,950.00 |
| 134 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,800.00 |
$2,025.00 |
$1,950.00 |
$1,950.00 |
| 135 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,176 | LF |
$5.00 |
$5.00 |
$4.85 |
$5.75 |
| 136 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$20.00 |
$39.45 |
$18.00 |
$18.00 |
| 137 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$200.00 |
$255.00 |
$225.00 |
$225.00 |
| 138 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 717 | LF |
$230.00 |
$297.00 |
$290.00 |
$290.00 |
| 139 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$235.00 |
$170.00 |
$170.00 |
| 140 | 504(B) 1305 |
SAW-CUT GROOVING | 1,024.5 | SY |
$5.00 |
$4.20 |
$5.00 |
$5.00 |
| 141 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 457 | LF |
$75.00 |
$142.00 |
$70.00 |
$70.00 |
| 142 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.10 |
$4.00 |
$4.00 |
| 143 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$280.00 |
$300.00 |
$300.00 |
| 144 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,500.00 |
$1,800.00 |
$1,800.00 |
| 145 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$2,000.00 |
$850.00 |
$350.00 |
$350.00 |
| 146 | 509(A) 1326 |
CLASS AA CONCRETE | 242.2 | CY |
$550.00 |
$821.00 |
$500.00 |
$500.00 |
| 147 | 509(B) 1328 |
CLASS A CONCRETE | 114.2 | CY |
$475.00 |
$826.00 |
$725.00 |
$725.00 |
| 148 | 509(D) 1331 |
CLASS C CONCRETE | 14 | CY |
$475.00 |
$603.00 |
$375.00 |
$375.00 |
| 149 | 511(A) 1332 |
REINFORCING STEEL | 580 | LB |
$1.20 |
$0.8500 |
$1.00 |
$1.00 |
| 150 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 73,570 | LB |
$1.10 |
$1.05 |
$1.00 |
$1.00 |
| 151 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,536.5 | LF |
$35.00 |
$34.25 |
$35.00 |
$35.00 |
| 152 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,536.5 | LF |
$15.00 |
$14.55 |
$8.00 |
$8.00 |
| 153 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 154 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 812 | SY |
$4.00 |
$3.65 |
$4.00 |
$4.00 |
| 155 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 438 | LF |
$800.00 |
$1,168.00 |
$1,210.00 |
$1,210.00 |
| 156 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$1,000.00 |
$1,481.00 |
$2,000.00 |
$2,000.00 |
| 157 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$3.50 |
$4.15 |
$4.00 |
$4.00 |
| 158 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$200.00 |
$104.00 |
$100.00 |
$100.00 |
| 159 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,670 | TON |
$60.00 |
$73.75 |
$52.00 |
$52.00 |
| 160 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 340 | TON |
$50.00 |
$66.40 |
$45.00 |
$45.00 |
| 161 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$21.80 |
$32.00 |
$32.00 |
| 162 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 52 | LF |
$25.00 |
$21.80 |
$32.00 |
$32.00 |
| 163 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$21,000.00 |
$20,000.00 |
$25,000.00 |
| 164 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$490.00 |
$490.00 |
$490.00 |
$490.00 |
| 165 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 18,942 | LF |
$0.1500 |
$0.1000 |
$0.0900 |
$0.1500 |
| 166 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$480.00 |
$311.00 |
$300.00 |
$300.00 |
| 167 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 54.18 | SF |
$25.00 |
$19.00 |
$18.00 |
$18.00 |
| 168 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 113 | LF |
$9.00 |
$9.50 |
$9.00 |
$9.00 |
| 169 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 30,673 | LF |
$0.4000 |
$0.3200 |
$0.3000 |
$0.3000 |