Bid tab 140347

Let Oct 16, 2014 · · Ssp-277n(008)ss Sign up free

‹ Oct 2014 results

WOODWARD GRADE, DRAIN, SURFACE , AND BRIDGE SH-15: FROM 2.1 MILES EAST OF THE ELLIS COUNTY LINE , EXTEND EAST. PROJECT LENGTH = 5.434 MILES

Let date
Thursday, October 16, 2014
Contract
140347
J/P numbers
24368(04)
District
County
Ssp-277n(008)ss
Highway
Limits
WOODWARD GRADE, DRAIN, SURFACE , AND BRIDGE SH-15: FROM 2.1 MILES EAST OF THE ELLIS COUNTY LINE , EXTEND EAST. PROJECT LENGTH = 5.434 MILES
Project number
SSP-177N(085)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$13,077,856
1 THE CUMMINS CONSTRUCTION CO., INC. Low bidder $13,321,580 +1.9%
2 J & R SAND COMPANY, INC. $13,330,302 +1.9% +0.1%
3 Venture Corporation dba VCO Paving $13,520,132 +3.4% +1.5%

Bid tab: unit prices 169 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 THE CUMMINS CON…#2 J & R SAND COMP…#3 Venture Corpora…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $67,000.00 $37,536.77 $55,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION30,004CY $6.00 $5.20 $4.97 $5.25
3202(D) 0184 UNCLASSIFIED BORROW2,796CY $8.00 $7.65 $7.37 $7.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $89,000.00 $58,578.44 $75,000.00
5221(C) 2801 TEMPORARY SILT FENCE20,806LF $1.80 $1.25 $1.19 $2.00
6221(F) 0100 TEMPORARY SILT DIKE3,186LF $8.00 $6.10 $5.88 $7.00
7230(A) 2806 SOLID SLAB SODDING168,529SY $2.00 $1.24 $1.18 $1.25
8230(F) 2812 WATERING6,741.16KGAL $6.00 $1.65 $1.58 $4.50
9232(B) 2814 SEEDING METHOD B34.82AC $522.00 $484.00 $466.00 $440.00
10233(A) 2817 VEGETATIVE MULCHING34.82AC $650.00 $657.00 $685.00 $220.00
11234(A) 2824 FERTILIZING (10-20-10)16.85TON $800.00 $670.00 $645.00 $660.00
12234(A) 4409 FERTILIZING (18-46-0)2.61TON $1,250.00 $1,245.00 $1,000.00 $825.00
13241 2832 MOWING34.82AC $120.00 $81.00 $78.00 $110.00
14307(K) 4300 STABILIZED SUBGRADE42,930SY $5.25 $6.89 $7.30 $8.00
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E340.8TON $60.00 $52.00 $46.00 $65.00
16407(B) 0250 TACK COAT14,512.3GAL $3.25 $3.64 $2.50 $2.50
17408 5774 PRIME COAT19,026.3GAL $4.25 $3.78 $4.00 $4.00
18409(A) 4245 SELF ADHESIVE STRESS RELIEF FABRIC INTERLAYER12,666.7SY $16.00 $10.60 $10.00 $7.40
19411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)8,611.23TON $90.00 $85.00 $90.00 $91.00
20411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)27,588.18TON $80.00 $75.00 $84.50 $83.00
21411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)5,849.93TON $96.00 $97.00 $104.00 $99.00
22411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)5,136.38TON $92.00 $81.50 $98.00 $90.00
23412 5267 COLD MILLING PAVEMENT51,466.7SY $3.00 $2.70 $2.00 $1.50
24501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED92.91CY $20.00 $9.35 $20.00 $20.00
25501(G) 6315 CLSM BACKFILL1CY $1,000.00 $266.00 $750.00 $350.00
26509(A) 0319 CLASS AA CONCRETE237.32CY $460.00 $991.00 $600.22 $450.00
27509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES13.29CY $560.00 $1,007.50 $724.34 $450.00
28509(D) 0325 CLASS C CONCRETE20CY $350.00 $522.00 $252.00 $400.00
29511(A) 0332 REINFORCING STEEL38,673LB $1.00 $0.8500 $1.10 $1.00
30613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH252LF $40.00 $60.00 $57.62 $60.00
31613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH1,359LF $35.00 $51.50 $49.57 $52.00
32613(M) 7196 TYPE A6 CULVERT END TREATMENT8EA $1,500.00 $2,190.00 $1,252.00 $1,650.00
33613(M) 7197 TYPE B6 CULVERT END TREATMENT32EA $1,500.00 $2,635.00 $1,348.00 $2,250.00
34613(M) 7202 TYPE BB6 CULVERT END TREATMENT2EA $2,500.00 $3,631.00 $1,845.00 $3,300.00
35619(B) 0291 REMOVAL OF HEADWALL18EA $1,200.00 $716.00 $750.00 $500.00
36619(B) 4725 REMOVAL OF FENCE13,984LF $1.75 $1.60 $1.20 $1.00
37619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,554SY $4.00 $7.90 $4.00 $6.00
38619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY241SY $8.50 $4.00 $3.85 $4.00
39619(C) 0924 SAWING PAVEMENT38,000LF $3.50 $3.30 $3.50 $2.50
40624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)13,619LF $5.00 $5.00 $4.85 $4.25
41624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)341LF $7.00 $5.20 $5.00 $4.35
42624(E) 4291 FENCE-STYLE CLF (5'HIGH, CLASS B)419LF $30.00 $14.50 $14.00 $22.50
43629(A) 4958 MAILBOX INSTALLATION-SINGLE5EA $90.00 $83.00 $80.00 $80.00
44629(C) 4960 MAILBOX5EA $40.00 $14.50 $28.00 $28.00
45629(D) 4961 REMOVAL OF MAILBOX INSTALLATION5EA $25.00 $18.70 $18.00 $18.00
46202(A) 1301 UNCLASSIFIED EXCAVATION250CY $12.00 $7.25 $10.00 $20.00
47501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED92CY $25.00 $7.25 $20.00 $20.00
48509(A) 1326 CLASS AA CONCRETE199.4CY $450.00 $535.00 $421.00 $420.00
49511(A) 1332 REINFORCING STEEL29,980LB $1.00 $0.8500 $0.8900 $1.00
50619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $10,550.00 $7,500.00 $5,000.00
51202(A) 1301 UNCLASSIFIED EXCAVATION660CY $12.00 $7.25 $10.00 $15.00
52501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED264CY $25.00 $7.25 $20.00 $15.00
53509(A) 1326 CLASS AA CONCRETE404CY $450.00 $545.00 $421.00 $420.00
54511(A) 1332 REINFORCING STEEL61,790LB $1.00 $0.8500 $0.8900 $1.00
55619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $11,000.00 $10,000.00 $10,000.00
56202(A) 1301 UNCLASSIFIED EXCAVATION800CY $12.00 $7.25 $10.00 $15.00
57501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED213CY $25.00 $7.25 $20.00 $15.00
58509(A) 1326 CLASS AA CONCRETE541.1CY $425.00 $537.00 $421.00 $420.00
59511(A) 1332 REINFORCING STEEL81,850LB $1.00 $0.8500 $0.8900 $1.00
60619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $11,000.00 $10,000.00 $10,000.00
61104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)20DAY $490.00 $490.00 $490.00 $490.00
62413(A) 4861 RUMBLE STRIP-METHOD HMA-CON38,000LF $0.1500 $0.1000 $0.0900 $0.1500
63805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $1,320.00 $625.00 $600.00 $600.00
64850(A) 8110 SHEET ALUMINUM SIGNS282.56SF $25.00 $18.70 $18.00 $18.00
65851(C) 8324 2" SQUARE TUBE POST133LF $8.00 $8.30 $8.00 $8.00
66851(C) 8327 2 1/4" SQUARE TUBE POST441LF $9.00 $9.35 $9.00 $9.00
67856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)78,632LF $0.4000 $0.4200 $0.3000 $0.3000
68857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)122,080LF $0.2300 $0.1000 $0.0900 $0.0900
69857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-27,932EA $0.7500 $0.5000 $0.4800 $0.4800
70857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)2,000LF $0.2500 $0.7500 $0.6800 $0.6800
71871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,140SD $14.00 $7.25 $7.00 $7.00
72876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR275SD $14.00 $3.10 $3.00 $3.00
73877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER280LF $21.00 $28.00 $27.00 $27.00
74877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER280LF $3.00 $2.60 $2.50 $2.50
75880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF6,600SD $0.2500 $1.55 $1.50 $1.50
76880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,400SD $0.8000 $1.70 $1.60 $1.60
77880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,700SD $1.42 $1.70 $1.65 $1.65
78880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)7,700SD $0.5000 $0.1000 $0.0500 $0.0500
79880(C) 8848 WING BARRICADES1,100SD $0.8500 $0.1000 $0.1000 $0.1000
80880(D) 8854 VERTICAL PANELS19,250SD $0.2000 $0.0500 $0.0300 $0.0300
81880(E) 8860 WARNING LIGHTS(TYPE A)22,000SD $0.1500 $0.0500 $0.0200 $0.0200
82880(F) 8878 DRUMS38,500SD $0.3500 $0.0500 $0.0200 $0.0200
83880(G) 8890 CHANNELIZER CONES38,500SD $0.2600 $0.3000 $0.2800 $0.2800
84880(I) 8902 FLAGGER190SD $200.00 $110.00 $200.00 $450.00
85880(W) 8800 PILOT CAR1LSUM $5,500.00 $6,500.00 $5,000.00 $60,000.00
86882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN28SD $14.00 $29.00 $28.00 $28.00
87642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $45,000.00 $105,000.00 $82,700.00 $97,500.00
88220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $30,000.00 $30,000.00 $17,000.00 $40,000.00
89641 1552 MOBILIZATION1LSUM $650,000.00 $475,000.00 $596,000.00 $604,000.00
90201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $51,500.00 $22,617.65 $35,000.00
91202(A) 0183 UNCLASSIFIED EXCAVATION36,776CY $6.00 $4.40 $4.22 $4.50
92202(D) 0184 UNCLASSIFIED BORROW99,869CY $8.00 $9.35 $9.02 $9.25
93205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $20,000.00 $160,000.00 $127,009.95 $150,000.00
94221(C) 2801 TEMPORARY SILT FENCE8,702LF $1.80 $1.25 $1.18 $2.50
95221(F) 0100 TEMPORARY SILT DIKE2,106LF $8.00 $6.10 $5.88 $7.00
96221(K) 0600 TEMPORARY FIBER LOG11,840LF $3.00 $4.30 $4.12 $2.50
97230(A) 2806 SOLID SLAB SODDING101,350SY $1.70 $1.24 $1.18 $1.25
98230(F) 2812 WATERING4,054KGAL $6.00 $1.65 $1.58 $4.40
99232(B) 2814 SEEDING METHOD B23.62AC $522.00 $485.00 $466.00 $440.00
100233(A) 2817 VEGETATIVE MULCHING23.62AC $650.00 $657.00 $685.00 $220.00
101234(A) 2824 FERTILIZING (10-20-10)10.14TON $800.00 $670.00 $645.00 $660.00
102234(A) 4409 FERTILIZING (18-46-0)1.57TON $1,250.00 $1,245.00 $1,000.00 $825.00
103241 2832 MOWING20.96AC $120.00 $81.00 $78.00 $110.00
104307(K) 4300 STABILIZED SUBGRADE32,944.2SY $5.25 $6.89 $7.30 $8.00
105402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E81TON $60.00 $52.00 $46.00 $65.00
106407(B) 0250 TACK COAT7,283.34GAL $3.25 $3.65 $2.50 $2.50
107408 5774 PRIME COAT12,663.16GAL $4.25 $3.78 $4.00 $4.00
108409(A) 4245 SELF ADHESIVE STRESS RELIEF FABRIC INTERLAYER2,980.3SY $16.00 $10.60 $10.00 $7.40
109411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)4,442.19TON $90.00 $85.00 $90.00 $91.00
110411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)15,687.72TON $80.00 $75.00 $84.50 $84.00
111411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)3,180.5TON $96.00 $97.00 $104.00 $99.00
112411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,300.17TON $92.00 $81.50 $98.00 $98.00
113412 5267 COLD MILLING PAVEMENT12,213.4SY $3.00 $3.80 $2.00 $1.50
114501(G) 6315 CLSM BACKFILL1CY $1,000.00 $1,040.00 $750.00 $350.00
115509(D) 0325 CLASS C CONCRETE20CY $350.00 $522.00 $250.00 $450.00
116613(A) 0492 24" R.C.PIPE CLASS III104LF $65.00 $74.50 $71.71 $75.00
117613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III104LF $120.00 $142.00 $136.73 $145.00
118613(B) 0689 18" CORR. GALV. STEEL PIPE134LF $28.00 $37.50 $36.16 $40.00
119613(B) 0692 36" CORR. GALV. STEEL PIPE84LF $45.00 $73.00 $70.36 $75.00
120613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH56LF $40.00 $47.00 $45.25 $50.00
121613(M) 7186 TYPE A4 CULVERT END TREATMENT2EA $1,500.00 $1,725.00 $1,100.00 $1,250.00
122613(M) 7187 TYPE B4 CULVERT END TREATMENT1EA $1,500.00 $1,785.00 $1,275.00 $1,750.00
123613(M) 7189 TYPE D4 CULVERT END TREATMENT2EA $1,500.00 $3,000.00 $2,272.50 $3,300.00
124613(M) 7196 TYPE A6 CULVERT END TREATMENT4EA $1,500.00 $2,190.00 $1,252.00 $2,200.00
125613(M) 7197 TYPE B6 CULVERT END TREATMENT3EA $1,500.00 $2,635.00 $1,348.00 $2,750.00
126613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C49.3CY $45.00 $46.00 $44.03 $44.03
127613(V) 1180 TRENCH EXCAVATION78CY $15.00 $22.15 $21.35 $21.35
128619(B) 0291 REMOVAL OF HEADWALL2EA $1,200.00 $7,400.00 $750.00 $500.00
129619(B) 4728 REMOVAL OF ASPHALT PAVEMENT15,676SY $4.00 $3.90 $4.00 $6.00
130619(B) 4778 REMOVAL OF EXISTING STRUCTURES2EA $2,000.00 $2,120.00 $7,112.40 $7,112.40
131619(C) 0924 SAWING PAVEMENT10,610LF $3.50 $3.30 $3.50 $2.56
132623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE850LF $18.00 $20.00 $19.00 $19.00
133623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,025.00 $1,950.00 $1,950.00
134623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $1,800.00 $2,025.00 $1,950.00 $1,950.00
135624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,176LF $5.00 $5.00 $4.85 $5.75
136501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON80CY $20.00 $39.45 $18.00 $18.00
137501(G) 6309 CLSM BACKFILL164CY $200.00 $255.00 $225.00 $225.00
138503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)717LF $230.00 $297.00 $290.00 $290.00
139504(A) 1304 APPROACH SLAB224.8SY $180.00 $235.00 $170.00 $170.00
140504(B) 1305 SAW-CUT GROOVING1,024.5SY $5.00 $4.20 $5.00 $5.00
141504(D) 6245 CONCRETE RAIL (TR4)457LF $75.00 $142.00 $70.00 $70.00
142506(A) 1322 STRUCTURAL STEEL1,050LB $4.00 $2.10 $4.00 $4.00
143507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $800.00 $280.00 $300.00 $300.00
144507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY16EA $2,000.00 $1,500.00 $1,800.00 $1,800.00
145507(C) 6282 ELASTOMERIC BEARING PADS16EA $2,000.00 $850.00 $350.00 $350.00
146509(A) 1326 CLASS AA CONCRETE242.2CY $550.00 $821.00 $500.00 $500.00
147509(B) 1328 CLASS A CONCRETE114.2CY $475.00 $826.00 $725.00 $725.00
148509(D) 1331 CLASS C CONCRETE14CY $475.00 $603.00 $375.00 $375.00
149511(A) 1332 REINFORCING STEEL580LB $1.20 $0.8500 $1.00 $1.00
150511(B) 6010 EPOXY COATED REINFORCING STEEL73,570LB $1.10 $1.05 $1.00 $1.00
151514(A) 6010 PILES, FURNISHED (HP 10X42)1,536.5LF $35.00 $34.25 $35.00 $35.00
152514(B) 6292 PILES, DRIVEN (HP 10X42)1,536.5LF $15.00 $14.55 $8.00 $8.00
153514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
154515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)812SY $4.00 $3.65 $4.00 $4.00
155516(A) 6096 DRILLED SHAFTS 60" DIAMETER438LF $800.00 $1,168.00 $1,210.00 $1,210.00
156516(C) 6200 CROSSHOLE SONIC LOGGING4EA $1,000.00 $1,481.00 $2,000.00 $2,000.00
157523(A) 6550 SEALER CRACK PREPARATION163LF $3.50 $4.15 $4.00 $4.00
158523(B) 6560 SEALER RESIN1.8GAL $200.00 $104.00 $100.00 $100.00
159601(B) 1353 TYPE I-A PLAIN RIPRAP1,670TON $60.00 $73.75 $52.00 $52.00
160601(C) 1355 TYPE I-A FILTER BLANKET340TON $50.00 $66.40 $45.00 $45.00
161613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $21.80 $32.00 $32.00
162613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.52LF $25.00 $21.80 $32.00 $32.00
163619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $21,000.00 $20,000.00 $25,000.00
164104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)30DAY $490.00 $490.00 $490.00 $490.00
165413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC18,942LF $0.1500 $0.1000 $0.0900 $0.1500
166805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $480.00 $311.00 $300.00 $300.00
167850(A) 8110 SHEET ALUMINUM SIGNS54.18SF $25.00 $19.00 $18.00 $18.00
168851(C) 8327 2 1/4" SQUARE TUBE POST113LF $9.00 $9.50 $9.00 $9.00
169856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)30,673LF $0.4000 $0.3200 $0.3000 $0.3000