| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,201.00 |
$20,000.00 |
$10,000.00 |
$2,625.00 |
$6,500.00 |
$45,000.00 |
$7,710.15 |
$18,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 32,348 | CY |
$6.50 |
$6.25 |
$6.50 |
$8.40 |
$6.83 |
$5.25 |
$15.50 |
$6.23 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 14,333 | CY |
$8.00 |
$7.30 |
$10.00 |
$11.50 |
$8.40 |
$6.75 |
$0.5000 |
$8.01 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$20,805.00 |
$15,000.00 |
$25,000.00 |
$21,000.00 |
$16,000.00 |
$45,995.00 |
$18,978.84 |
$30,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,547 | LF |
$1.70 |
$1.25 |
$2.00 |
$1.50 |
$1.63 |
$1.19 |
$1.16 |
$1.29 |
$1.55 |
| 6 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 51 | CY |
$100.00 |
$130.00 |
$120.00 |
$85.00 |
$105.00 |
$150.00 |
$160.00 |
$115.63 |
$75.00 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 12 | CY |
$150.00 |
$156.00 |
$105.00 |
$111.00 |
$157.50 |
$150.00 |
$213.00 |
$121.70 |
$95.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 688 | LF |
$5.50 |
$4.05 |
$4.00 |
$6.00 |
$2.00 |
$3.89 |
$2.00 |
$2.83 |
$1.90 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 27,415 | SY |
$1.40 |
$1.25 |
$1.24 |
$1.40 |
$1.21 |
$1.19 |
$1.25 |
$2.37 |
$1.15 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 9 | AC |
$255.50 |
$104.00 |
$105.00 |
$120.00 |
$105.00 |
$100.00 |
$106.50 |
$1,067.56 |
$100.00 |
| 11 | 241 2832 |
MOWING | 16 | AC |
$81.60 |
$67.60 |
$67.00 |
$80.00 |
$105.00 |
$65.00 |
$106.50 |
$118.62 |
$100.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 484 | CY |
$71.50 |
$91.70 |
$75.00 |
$64.00 |
$73.50 |
$96.80 |
$85.00 |
$114.82 |
$96.80 |
| 13 | 307(A) 4200 |
FLY ASH | 375 | TON |
$80.00 |
$71.90 |
$82.00 |
$90.00 |
$63.00 |
$75.90 |
$65.00 |
$90.03 |
$75.90 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,947 | SY |
$9.00 |
$6.15 |
$3.00 |
$7.00 |
$3.68 |
$6.50 |
$5.50 |
$7.71 |
$6.50 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 2,267 | SY |
$2.00 |
$5.30 |
$1.75 |
$2.25 |
$2.10 |
$5.60 |
$6.50 |
$6.64 |
$5.60 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 160 | TON |
$41.90 |
$70.20 |
$42.00 |
$48.00 |
$39.90 |
$74.10 |
$48.00 |
$87.90 |
$74.10 |
| 17 | 407(B) 0250 |
TACK COAT | 3,460 | GAL |
$3.30 |
$4.70 |
$2.05 |
$4.60 |
$4.73 |
$4.50 |
$3.00 |
$5.34 |
$4.50 |
| 18 | 408 5774 |
PRIME COAT | 2,705 | GAL |
$5.90 |
$8.15 |
$3.10 |
$3.25 |
$9.03 |
$8.60 |
$3.50 |
$10.20 |
$8.60 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 184 | TON |
$98.40 |
$93.00 |
$84.00 |
$120.00 |
$113.40 |
$108.00 |
$85.00 |
$128.11 |
$108.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,222 | TON |
$89.50 |
$64.20 |
$70.00 |
$76.00 |
$72.24 |
$68.80 |
$67.00 |
$81.61 |
$68.80 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,694 | TON |
$111.20 |
$69.60 |
$85.00 |
$90.00 |
$86.31 |
$82.20 |
$72.00 |
$97.50 |
$82.20 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,093 | TON |
$96.50 |
$60.20 |
$72.00 |
$80.00 |
$73.50 |
$70.00 |
$65.00 |
$83.03 |
$70.00 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 12,889 | SY |
$2.80 |
$2.35 |
$2.60 |
$4.50 |
$2.57 |
$2.45 |
$5.50 |
$2.91 |
$2.45 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 23 | CY |
$833.40 |
$601.00 |
$625.00 |
$420.00 |
$763.26 |
$1,054.54 |
$352.00 |
$875.00 |
$650.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 119 | CY |
$278.50 |
$229.00 |
$260.00 |
$240.00 |
$442.72 |
$342.97 |
$304.00 |
$300.84 |
$350.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 3,380 | LB |
$1.30 |
$1.80 |
$1.00 |
$0.9000 |
$1.91 |
$0.9000 |
$0.9500 |
$1.00 |
$1.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 71 | LF |
$32.00 |
$31.20 |
$40.00 |
$31.00 |
$33.60 |
$30.00 |
$58.60 |
$35.59 |
$40.00 |
| 28 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 50 | LF |
$74.50 |
$46.80 |
$95.00 |
$49.00 |
$78.23 |
$70.00 |
$53.30 |
$83.03 |
$75.00 |
| 29 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 263 | LF |
$100.70 |
$101.00 |
$155.00 |
$140.00 |
$105.74 |
$95.00 |
$112.00 |
$112.69 |
$125.00 |
| 30 | 613(B) 5717 |
15" CORR. GALV. STEEL PIPE | 42 | LF |
$38.00 |
$28.10 |
$55.00 |
$30.00 |
$39.90 |
$37.00 |
$44.70 |
$43.89 |
$35.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,554.30 |
$3,641.00 |
$16,000.00 |
$7,000.00 |
$6,882.02 |
$5,500.00 |
$38,840.00 |
$6,523.98 |
$10,000.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,871 | SY |
$4.60 |
$6.05 |
$3.90 |
$8.00 |
$6.72 |
$6.40 |
$2.50 |
$7.59 |
$6.40 |
| 33 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 403 | LF |
$6.40 |
$10.40 |
$10.50 |
$8.00 |
$10.50 |
$8.50 |
$8.70 |
$11.86 |
$7.09 |
| 34 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$195.60 |
$52.00 |
$52.00 |
$75.00 |
$315.00 |
$100.00 |
$160.00 |
$654.57 |
$250.00 |
| 35 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 8,510 | CY |
$10.00 |
$7.30 |
$6.50 |
$3.75 |
$10.50 |
$7.50 |
$31.00 |
$8.90 |
$12.00 |
| 36 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 452 | CY |
$20.00 |
$16.40 |
$60.00 |
$8.00 |
$21.00 |
$10.00 |
$15.00 |
$20.00 |
$17.00 |
| 37 | 509(A) 1326 |
CLASS AA CONCRETE | 1,293.9 | CY |
$550.00 |
$331.50 |
$326.00 |
$340.00 |
$516.51 |
$508.41 |
$351.90 |
$572.00 |
$500.00 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 165,560 | LB |
$1.00 |
$0.8400 |
$0.9000 |
$0.9000 |
$0.9700 |
$0.9000 |
$0.7000 |
$1.00 |
$1.00 |
| 39 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$15,605.00 |
$10,500.00 |
$25,000.00 |
$15,750.00 |
$75,000.00 |
$28,760.00 |
$17,500.00 |
$75,000.00 |
| 40 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,804 | LF |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1000 |
| 41 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 12,270 | LF |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1800 |
$0.1500 |
| 42 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,115 | SD |
$0.3000 |
$0.2600 |
$0.2600 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.3000 |
$0.2500 |
| 43 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,195 | SD |
$0.6000 |
$0.8800 |
$0.8900 |
$0.9500 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.3000 |
$0.2500 |
| 44 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,460 | SD |
$1.20 |
$1.55 |
$1.56 |
$1.70 |
$1.05 |
$1.00 |
$1.10 |
$1.19 |
$1.00 |
| 45 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,485 | SD |
$0.7000 |
$2.00 |
$1.98 |
$2.25 |
$1.05 |
$1.00 |
$1.10 |
$1.19 |
$1.00 |
| 46 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.7000 |
$3.10 |
$3.13 |
$3.50 |
$1.05 |
$1.00 |
$1.10 |
$1.19 |
$1.00 |
| 47 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,010 | SD |
$0.3000 |
$0.2600 |
$0.2600 |
$0.3000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1000 |
| 48 | 880(F) 8878 |
DRUMS | 7,320 | SD |
$0.2000 |
$0.3100 |
$0.3100 |
$0.4000 |
$0.2100 |
$0.2000 |
$0.2000 |
$0.2400 |
$0.2000 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$11.10 |
$10.40 |
$10.42 |
$11.00 |
$7.88 |
$7.50 |
$8.00 |
$8.90 |
$7.50 |
| 50 | 407(A) 4659 |
FOG SEAL | 78 | GAL |
$10.00 |
$14.00 |
$4.25 |
$25.00 |
$15.75 |
$300.00 |
$12.00 |
$23.21 |
$35.00 |
| 51 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 6,045 | LF |
$2.00 |
$0.7300 |
$0.7300 |
$0.6500 |
$0.2600 |
$0.2500 |
$0.3000 |
$0.3000 |
$0.2500 |
| 52 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 8,699 | LF |
$0.8000 |
$0.4200 |
$0.4200 |
$0.4500 |
$0.5800 |
$0.5500 |
$0.6000 |
$0.6500 |
$0.5500 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,898.20 |
$9,154.00 |
$8,900.00 |
$30,000.00 |
$9,240.00 |
$5,000.00 |
$20,000.00 |
$10,912.89 |
$5,932.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,229.20 |
$2,340.00 |
$1,750.00 |
$15,000.00 |
$3,255.00 |
$8,800.00 |
$20,000.00 |
$10,972.14 |
$1,250.00 |
| 55 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$9,491.10 |
$1,638.00 |
$4,500.00 |
$15,000.00 |
$10,500.00 |
$5,000.00 |
$24,353.42 |
$11,248.81 |
$15,000.00 |
| 56 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$127,828.20 |
$59,369.10 |
$126,370.00 |
$150,000.00 |
$92,663.24 |
$330,194.61 |
$127,300.00 |
$116,987.26 |
$155,000.00 |