| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$16,101.58 |
$35,000.00 |
$11,330.47 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$14,297.21 |
$10,000.00 |
$4,777.49 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,100 | LF |
$3.00 |
$5.24 |
$1.50 |
$1.53 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 75 | LF |
$15.00 |
$8.39 |
$12.00 |
$12.73 |
| 5 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 4 | EA |
$200.00 |
$165.27 |
$285.00 |
$303.53 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 300 | LF |
$2.25 |
$2.99 |
$3.00 |
$3.14 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,300 | SY |
$3.50 |
$1.54 |
$2.00 |
$1.43 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 780 | CY |
$90.00 |
$29.72 |
$40.00 |
$58.97 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 2,065 | SY |
$3.00 |
$1.68 |
$1.50 |
$1.98 |
| 10 | 408 5774 |
PRIME COAT | 1,021 | GAL |
$7.00 |
$8.02 |
$1.10 |
$5.33 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 90 | TON |
$125.00 |
$74.64 |
$65.00 |
$276.90 |
| 12 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,110 | SY |
$45.00 |
$28.92 |
$55.00 |
$21.59 |
| 13 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 528 | CY |
$180.00 |
$122.33 |
$125.00 |
$117.40 |
| 14 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,310 | LF |
$10.00 |
$3.00 |
$10.00 |
$17.78 |
| 15 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 500 | SY |
$70.00 |
$33.36 |
$65.00 |
$36.50 |
| 16 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 655 | LF |
$16.00 |
$6.48 |
$10.00 |
$9.16 |
| 17 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 60 | LF |
$22.00 |
$11.15 |
$10.00 |
$9.23 |
| 18 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$650.00 |
$281.92 |
$1,000.00 |
$1,441.23 |
| 19 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 2,540 | SY |
$15.00 |
$6.55 |
$10.00 |
$6.11 |
| 20 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,395 | LF |
$5.00 |
$2.29 |
$2.20 |
$3.51 |
| 21 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 868.75 | LF |
$30.00 |
$18.34 |
$17.60 |
$17.04 |
| 22 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,000.00 |
$687.79 |
$660.00 |
$639.00 |
| 23 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,407.28 |
$2,200.00 |
$2,236.50 |
| 24 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$650.00 |
$859.75 |
$900.00 |
$798.75 |
| 25 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,719.49 |
$1,650.00 |
$1,597.50 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 90 | CY |
$160.00 |
$206.87 |
$100.00 |
$136.60 |
| 27 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$250,992.66 |
$90,000.00 |
$30,150.15 |
| 28 | 504(A) 1304 |
APPROACH SLAB | 249.4 | SY |
$180.00 |
$152.54 |
$165.00 |
$190.94 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 801 | SY |
$5.20 |
$4.13 |
$4.00 |
$3.83 |
| 30 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.2 | LF |
$260.00 |
$232.17 |
$235.00 |
$264.85 |
| 31 | 504(E) 1381 |
CONCRETE PARAPET | 538 | LF |
$80.00 |
$65.31 |
$115.00 |
$80.98 |
| 32 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 50 | LF |
$30.00 |
$77.92 |
$35.00 |
$26.63 |
| 33 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$1,071.06 |
$3,000.00 |
$2,108.70 |
| 34 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$1,150.00 |
$1,071.06 |
$3,000.00 |
$2,108.70 |
| 35 | 509 6152 |
SPECIAL CONCRETE FINISH | 100.9 | SY |
$32.00 |
$15.48 |
$90.00 |
$77.74 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 233.7 | CY |
$550.00 |
$624.37 |
$750.00 |
$753.50 |
| 37 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 56,850 | LB |
$1.20 |
$0.9500 |
$1.00 |
$1.12 |
| 38 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 560 | SY |
$4.60 |
$3.44 |
$3.30 |
$3.20 |
| 39 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$36.00 |
$35.86 |
$30.00 |
$31.95 |
| 40 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$90.00 |
$128.08 |
$110.00 |
$42.60 |
| 41 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 14.9 | SY |
$500.00 |
$909.34 |
$750.00 |
$1,043.70 |
| 42 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 175 | SF |
$80.00 |
$76.85 |
$65.00 |
$78.81 |
| 43 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 19.4 | SY |
$45.00 |
$56.35 |
$45.00 |
$44.73 |
| 44 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$1,200.00 |
$2,605.07 |
$2,500.00 |
$4,073.63 |
| 45 | 542 4620 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 1 | LSUM |
$1,000.00 |
$2,605.07 |
$2,500.00 |
$3,633.78 |
| 46 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$15,000.00 |
$2,295.47 |
$25,000.00 |
$50,000.00 |
| 47 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$50,000.00 |
$23,943.90 |
$150,000.00 |
$400,000.00 |
| 48 | 501(G) 6309 |
CLSM BACKFILL | 90 | CY |
$160.00 |
$206.87 |
$100.00 |
$136.60 |
| 49 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$20,000.00 |
$250,992.66 |
$90,000.00 |
$30,150.15 |
| 50 | 504(A) 1304 |
APPROACH SLAB | 249.4 | SY |
$180.00 |
$152.54 |
$165.00 |
$191.21 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 801 | SY |
$5.35 |
$4.13 |
$4.00 |
$3.83 |
| 52 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.2 | LF |
$260.00 |
$232.17 |
$235.00 |
$264.85 |
| 53 | 504(E) 1381 |
CONCRETE PARAPET | 538 | LF |
$80.00 |
$65.31 |
$115.00 |
$80.98 |
| 54 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 50 | LF |
$30.00 |
$77.92 |
$35.00 |
$26.63 |
| 55 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$1,071.06 |
$3,000.00 |
$2,108.70 |
| 56 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$1,150.00 |
$1,071.06 |
$3,000.00 |
$2,108.70 |
| 57 | 509 6152 |
SPECIAL CONCRETE FINISH | 100.2 | SY |
$32.00 |
$15.48 |
$90.00 |
$77.75 |
| 58 | 509(A) 1326 |
CLASS AA CONCRETE | 235.1 | CY |
$650.00 |
$624.37 |
$750.00 |
$762.00 |
| 59 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 56,970 | LB |
$1.16 |
$0.9500 |
$1.00 |
$1.12 |
| 60 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 30 | SY |
$350.00 |
$416.48 |
$400.00 |
$426.00 |
| 61 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 30 | SY |
$530.00 |
$533.26 |
$500.00 |
$489.90 |
| 62 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 558 | SY |
$4.60 |
$3.44 |
$3.30 |
$3.20 |
| 63 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$36.00 |
$35.86 |
$30.00 |
$31.95 |
| 64 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$90.00 |
$128.08 |
$110.00 |
$42.60 |
| 65 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10.8 | SY |
$500.00 |
$909.34 |
$750.00 |
$1,043.70 |
| 66 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 170.5 | SF |
$80.00 |
$76.85 |
$65.00 |
$78.81 |
| 67 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 18.9 | SY |
$45.00 |
$56.35 |
$45.00 |
$44.73 |
| 68 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$1,200.00 |
$2,605.07 |
$2,500.00 |
$3,953.28 |
| 69 | 542 4620 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 1 | LSUM |
$1,000.00 |
$2,605.07 |
$2,500.00 |
$3,533.67 |
| 70 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$15,000.00 |
$2,295.47 |
$25,000.00 |
$50,000.00 |
| 71 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$50,000.00 |
$23,943.90 |
$150,000.00 |
$400,000.00 |
| 72 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$240.00 |
$136.29 |
$110.00 |
$106.50 |
| 73 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 10,880 | LF |
$0.7600 |
$0.7100 |
$0.6000 |
$0.5500 |
| 74 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 21,600 | LF |
$0.8200 |
$0.3400 |
$0.3000 |
$0.2700 |
| 75 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,200 | EA |
$1.00 |
$0.6800 |
$0.5500 |
$0.5300 |
| 76 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,000 | LF |
$0.7500 |
$0.3400 |
$0.3000 |
$0.2700 |
| 77 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 450 | SD |
$5.00 |
$1.36 |
$1.10 |
$1.07 |
| 78 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,775 | SD |
$0.5000 |
$0.3400 |
$0.3000 |
$0.2700 |
| 79 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,075 | SD |
$0.6000 |
$0.3400 |
$0.3000 |
$0.2700 |
| 80 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,200 | SD |
$1.20 |
$2.04 |
$1.65 |
$1.60 |
| 81 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,515 | SD |
$0.5000 |
$0.3400 |
$0.3000 |
$0.2700 |
| 82 | 880(C) 8848 |
WING BARRICADES | 900 | SD |
$3.00 |
$1.36 |
$1.10 |
$1.07 |
| 83 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 12,825 | SD |
$0.5000 |
$0.1400 |
$0.1100 |
$0.1100 |
| 84 | 880(F) 8878 |
DRUMS | 31,165 | SD |
$0.5000 |
$0.1400 |
$0.1500 |
$0.1100 |
| 85 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 450 | SD |
$15.00 |
$20.44 |
$17.00 |
$15.98 |
| 86 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$12,827.40 |
$30,754.00 |
$10,969.50 |
| 87 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$107,627.00 |
$70,018.00 |
$125,000.00 |
$100,000.00 |