| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$45,000.00 |
$4,095.00 |
$4,017.00 |
$14,210.00 |
$115,000.00 |
$60,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,395 | CY |
$8.00 |
$7.88 |
$7.73 |
$18.35 |
$8.82 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,656 | CY |
$11.00 |
$8.93 |
$8.76 |
$3.05 |
$10.49 |
$12.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$16,926.00 |
$16,603.60 |
$41,200.00 |
$48,000.00 |
$35,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,805 | LF |
$1.50 |
$1.16 |
$1.13 |
$1.15 |
$1.25 |
$1.15 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$7.50 |
$8.29 |
$8.13 |
$8.00 |
$8.80 |
$8.20 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 15,985 | SY |
$1.50 |
$1.17 |
$1.14 |
$1.15 |
$1.25 |
$1.15 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.3 | AC |
$375.00 |
$472.50 |
$463.50 |
$450.00 |
$400.00 |
$465.00 |
| 9 | 241 2832 |
MOWING | 6.6 | AC |
$75.00 |
$89.25 |
$87.55 |
$85.00 |
$85.00 |
$90.00 |
| 10 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,000.00 |
$2,625.00 |
$1,030.00 |
$5,000.00 |
$4,800.00 |
$2,100.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,985 | CY |
$60.00 |
$47.25 |
$46.35 |
$65.30 |
$60.00 |
$60.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 17,540 | SY |
$6.00 |
$4.20 |
$4.12 |
$6.50 |
$5.00 |
$5.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 9,990 | SY |
$1.60 |
$2.41 |
$1.29 |
$1.10 |
$2.00 |
$1.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 705 | TON |
$32.00 |
$49.91 |
$30.90 |
$38.50 |
$33.75 |
$35.00 |
| 15 | 407(B) 0250 |
TACK COAT | 2,720 | GAL |
$3.50 |
$2.10 |
$2.06 |
$0.0100 |
$3.30 |
$2.05 |
| 16 | 408 5774 |
PRIME COAT | 8,770 | GAL |
$4.00 |
$3.15 |
$3.09 |
$0.0100 |
$4.25 |
$3.10 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 735 | TON |
$85.00 |
$81.30 |
$79.75 |
$77.10 |
$85.00 |
$82.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,560 | TON |
$80.00 |
$76.05 |
$74.60 |
$67.30 |
$77.00 |
$75.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,090 | TON |
$90.00 |
$86.39 |
$84.75 |
$87.70 |
$95.00 |
$85.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,250 | TON |
$85.00 |
$75.60 |
$74.16 |
$79.40 |
$83.00 |
$75.00 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 5,380 | SY |
$2.25 |
$3.15 |
$3.09 |
$2.20 |
$5.50 |
$3.25 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 425 | CY |
$300.00 |
$366.56 |
$469.93 |
$335.00 |
$365.00 |
$300.00 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 150 | TON |
$50.00 |
$33.57 |
$47.38 |
$65.75 |
$51.75 |
$45.00 |
| 24 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 22 | LF |
$40.00 |
$34.65 |
$29.87 |
$82.30 |
$57.00 |
$58.00 |
| 25 | 613(B) 0698 |
72" CORR. GALV. STEEL PIPE | 212 | LF |
$110.00 |
$109.35 |
$227.63 |
$120.05 |
$184.00 |
$154.00 |
| 26 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$9,975.00 |
$9,785.00 |
$11,150.00 |
$9,000.00 |
$15,000.00 |
| 27 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,655 | SY |
$5.00 |
$3.15 |
$3.09 |
$4.55 |
$5.50 |
$5.00 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 545 | LF |
$3.50 |
$5.25 |
$6.18 |
$8.75 |
$5.60 |
$8.00 |
| 29 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 625 | LF |
$18.50 |
$16.64 |
$18.54 |
$18.90 |
$17.60 |
$16.70 |
| 30 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,175.60 |
$2,317.50 |
$2,365.00 |
$2,350.00 |
$2,400.00 |
| 31 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,433.25 |
$1,493.50 |
$1,525.00 |
$1,650.00 |
$3,500.00 |
| 32 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,000 | LF |
$6.00 |
$6.97 |
$9.17 |
$5.60 |
$7.50 |
$6.90 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 110 | CY |
$30.00 |
$16.80 |
$30.90 |
$14.30 |
$11.50 |
$100.00 |
| 34 | 501(G) 6309 |
CLSM BACKFILL | 324 | CY |
$180.00 |
$144.89 |
$237.11 |
$174.30 |
$170.00 |
$145.00 |
| 35 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 673.34 | LF |
$290.00 |
$277.72 |
$259.62 |
$287.15 |
$395.00 |
$325.00 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 297.6 | SY |
$210.00 |
$226.65 |
$211.11 |
$179.50 |
$203.75 |
$175.00 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 947 | SY |
$5.00 |
$4.54 |
$6.23 |
$5.70 |
$4.50 |
$4.20 |
| 38 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 387 | LF |
$100.00 |
$77.62 |
$78.34 |
$116.45 |
$98.00 |
$90.00 |
| 39 | 506(A) 1322 |
STRUCTURAL STEEL | 680 | LB |
$4.00 |
$2.37 |
$3.23 |
$2.05 |
$3.00 |
$2.00 |
| 40 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$800.00 |
$485.10 |
$551.69 |
$452.15 |
$600.00 |
$750.00 |
| 41 | 509(A) 1326 |
CLASS AA CONCRETE | 243.1 | CY |
$600.00 |
$531.63 |
$590.81 |
$738.40 |
$675.00 |
$750.00 |
| 42 | 509(B) 1328 |
CLASS A CONCRETE | 72.8 | CY |
$650.00 |
$581.66 |
$585.22 |
$868.10 |
$720.00 |
$1,500.00 |
| 43 | 509(D) 1331 |
CLASS C CONCRETE | 18 | CY |
$600.00 |
$437.51 |
$572.93 |
$795.45 |
$660.00 |
$665.00 |
| 44 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 56,790 | LB |
$1.20 |
$0.9500 |
$1.15 |
$0.9000 |
$1.02 |
$1.25 |
| 45 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,166 | LF |
$46.00 |
$27.23 |
$24.09 |
$24.65 |
$30.80 |
$36.00 |
| 46 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,166 | LF |
$18.00 |
$11.20 |
$11.33 |
$27.30 |
$13.20 |
$15.00 |
| 47 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 48 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 366 | SY |
$4.00 |
$3.92 |
$5.67 |
$3.80 |
$4.25 |
$3.65 |
| 49 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$4,000.00 |
$1,344.00 |
$3,090.00 |
$2,500.00 |
$4,200.00 |
$2,500.00 |
| 50 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,960 | TON |
$56.00 |
$44.49 |
$46.19 |
$45.25 |
$45.25 |
$40.00 |
| 51 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 290 | TON |
$50.00 |
$32.00 |
$35.94 |
$47.65 |
$35.25 |
$30.00 |
| 52 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 92 | LF |
$36.00 |
$18.59 |
$30.90 |
$55.00 |
$19.50 |
$20.00 |
| 53 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$36.00 |
$18.59 |
$30.90 |
$55.00 |
$45.00 |
$20.00 |
| 54 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$22,400.00 |
$20,600.00 |
$25,950.00 |
$96,700.00 |
$50,000.00 |
| 55 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$350.00 |
$210.00 |
$206.00 |
$210.00 |
$220.00 |
$208.00 |
| 56 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 9,990 | LF |
$1.00 |
$0.7400 |
$0.7200 |
$0.7000 |
$0.7800 |
$0.7200 |
| 57 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 24,890 | LF |
$0.1500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 58 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 15,180 | LF |
$0.3000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 59 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,865 | SD |
$0.3500 |
$4.20 |
$4.12 |
$4.00 |
$4.40 |
$4.15 |
| 60 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,200 | SD |
$0.6500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 61 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,175 | SD |
$1.75 |
$4.20 |
$4.12 |
$4.00 |
$4.40 |
$4.15 |
| 62 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,505 | SD |
$0.8500 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 63 | 880(C) 8848 |
WING BARRICADES | 980 | SD |
$1.00 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 64 | 880(D) 8854 |
VERTICAL PANELS | 8,995 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
| 65 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,180 | SD |
$0.4000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
| 66 | 880(F) 8878 |
DRUMS | 7,260 | SD |
$0.3000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1100 |
| 67 | 880(I) 8902 |
FLAGGER | 14 | SD |
$180.00 |
$183.75 |
$185.40 |
$275.00 |
$225.00 |
$350.00 |
| 68 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$15.00 |
$21.00 |
$20.60 |
$21.00 |
$22.00 |
$21.00 |
| 69 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$12,075.00 |
$20,085.00 |
$35,000.00 |
$23,500.00 |
$45,000.00 |
| 70 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,150.00 |
$2,575.00 |
$3,000.00 |
$8,000.00 |
$2,000.00 |
| 71 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$9,975.00 |
$3,090.00 |
$21,500.00 |
$9,500.00 |
$9,000.00 |
| 72 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$210,000.00 |
$189,456.43 |
$210,696.42 |
$480,000.00 |
$242,000.00 |
$254,000.00 |
| 73 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$9,450.00 |
$9,270.00 |
$15,250.00 |
$58,388.00 |
$40,000.00 |
| 74 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,494 | CY |
$10.00 |
$9.98 |
$7.73 |
$12.65 |
$9.68 |
$10.00 |
| 75 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,808 | CY |
$15.00 |
$11.55 |
$9.27 |
$3.05 |
$11.80 |
$15.00 |
| 76 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,610.00 |
$8,446.00 |
$32,650.00 |
$41,000.00 |
$35,000.00 |
| 77 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,891 | LF |
$3.00 |
$1.16 |
$1.13 |
$1.15 |
$1.25 |
$1.15 |
| 78 | 221(F) 0100 |
TEMPORARY SILT DIKE | 518 | LF |
$10.00 |
$8.29 |
$8.13 |
$8.00 |
$8.80 |
$8.20 |
| 79 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 17.48 | CY |
$66.00 |
$78.75 |
$103.00 |
$120.00 |
$125.00 |
$155.00 |
| 80 | 221(K) 0600 |
TEMPORARY FIBER LOG | 329 | LF |
$10.00 |
$3.73 |
$3.66 |
$3.25 |
$4.00 |
$3.75 |
| 81 | 230(A) 2806 |
SOLID SLAB SODDING | 13,813.8 | SY |
$2.00 |
$1.17 |
$1.14 |
$1.15 |
$1.25 |
$1.15 |
| 82 | 241 2832 |
MOWING | 2.45 | AC |
$350.00 |
$89.25 |
$87.55 |
$85.00 |
$85.00 |
$90.00 |
| 83 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 493.26 | CY |
$60.00 |
$36.75 |
$36.05 |
$82.75 |
$60.00 |
$90.00 |
| 84 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,946.5 | SY |
$7.00 |
$4.20 |
$4.12 |
$6.85 |
$5.00 |
$6.50 |
| 85 | 325 5271 |
SEPARATOR FABRIC | 2,595.6 | SY |
$2.00 |
$1.31 |
$1.29 |
$1.65 |
$2.00 |
$1.00 |
| 86 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 679.02 | TON |
$50.00 |
$31.50 |
$30.90 |
$39.35 |
$33.75 |
$35.00 |
| 87 | 407(B) 0250 |
TACK COAT | 2,314 | GAL |
$4.00 |
$2.10 |
$2.06 |
$0.0100 |
$3.30 |
$2.05 |
| 88 | 408 5774 |
PRIME COAT | 3,318 | GAL |
$8.00 |
$3.15 |
$3.09 |
$0.0100 |
$4.25 |
$3.10 |
| 89 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 312.44 | TON |
$85.00 |
$81.30 |
$79.75 |
$99.85 |
$85.00 |
$82.00 |
| 90 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,237.6 | TON |
$80.00 |
$76.05 |
$74.60 |
$77.30 |
$74.00 |
$75.00 |
| 91 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 318.79 | TON |
$90.00 |
$86.39 |
$84.75 |
$121.40 |
$95.00 |
$85.00 |
| 92 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 757.87 | TON |
$85.00 |
$75.60 |
$74.16 |
$81.40 |
$83.00 |
$75.00 |
| 93 | 412 5267 |
COLD MILLING PAVEMENT | 2,946.7 | SY |
$5.00 |
$3.15 |
$3.09 |
$3.35 |
$8.00 |
$3.25 |
| 94 | 509(D) 0325 |
CLASS C CONCRETE | 195.32 | CY |
$300.00 |
$366.56 |
$469.93 |
$350.00 |
$377.50 |
$300.00 |
| 95 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 200 | TON |
$50.00 |
$43.81 |
$47.38 |
$70.65 |
$51.75 |
$45.00 |
| 96 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 75 | TON |
$50.00 |
$30.00 |
$30.90 |
$49.60 |
$44.75 |
$35.00 |
| 97 | 619(B) 4725 |
REMOVAL OF FENCE | 4,002 | LF |
$3.00 |
$1.05 |
$1.03 |
$1.85 |
$2.60 |
$2.10 |
| 98 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,215.3 | SY |
$4.00 |
$3.15 |
$3.09 |
$4.35 |
$6.25 |
$5.00 |
| 99 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,044 | LF |
$5.00 |
$2.10 |
$2.32 |
$5.25 |
$5.00 |
$3.15 |
| 100 | 619(C) 0924 |
SAWING PAVEMENT | 1,902 | LF |
$5.00 |
$5.78 |
$5.66 |
$6.30 |
$4.90 |
$8.00 |
| 101 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,674 | LF |
$8.00 |
$6.97 |
$9.17 |
$5.60 |
$7.50 |
$6.90 |
| 102 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,800 | LF |
$0.5000 |
$0.7400 |
$0.7200 |
$0.7000 |
$0.7800 |
$0.7500 |
| 103 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,960 | LF |
$0.2000 |
$0.2600 |
$0.2600 |
$0.2500 |
$0.2800 |
$0.2600 |
| 104 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 540 | SD |
$10.00 |
$10.50 |
$10.30 |
$10.50 |
$12.00 |
$10.50 |
| 105 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,900 | LF |
$25.00 |
$30.45 |
$25.75 |
$16.50 |
$25.00 |
$38.00 |
| 106 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$5.00 |
$6.30 |
$5.15 |
$3.50 |
$4.00 |
$3.00 |
| 107 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$8,977.50 |
$8,806.50 |
$9,250.00 |
$12,500.00 |
$10,900.00 |
| 108 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 270 | SD |
$15.00 |
$15.75 |
$15.45 |
$15.75 |
$18.00 |
$15.50 |
| 109 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,150.00 |
$3,605.00 |
$3,000.00 |
$6,000.00 |
$2,000.00 |
| 110 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 7,815 | CY |
$12.00 |
$3.15 |
$6.70 |
$5.80 |
$11.30 |
$15.00 |
| 111 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 465 | CY |
$20.00 |
$15.75 |
$20.60 |
$10.50 |
$13.12 |
$80.00 |
| 112 | 509(A) 1326 |
CLASS AA CONCRETE | 1,122.9 | CY |
$500.00 |
$445.89 |
$519.31 |
$367.35 |
$465.00 |
$550.00 |
| 113 | 511(A) 1332 |
REINFORCING STEEL | 173,880 | LB |
$0.9000 |
$0.8200 |
$0.9200 |
$0.9000 |
$0.7500 |
$1.10 |
| 114 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$1,260.00 |
$3,090.00 |
$5,250.00 |
$2,500.00 |
$2,500.00 |
| 115 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$52,500.00 |
$22,700.00 |
$21,000.00 |
$9,500.00 |
$40,000.00 |