| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,398.40 |
$75,000.00 |
$65,000.00 |
$49,955.00 |
$30,000.00 |
$51,410.00 |
$51,652.50 |
$67,068.40 |
$56,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,735 | CY |
$7.40 |
$8.50 |
$8.00 |
$8.12 |
$3.50 |
$8.35 |
$8.39 |
$8.91 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 53,467 | CY |
$7.50 |
$7.50 |
$8.00 |
$7.57 |
$7.00 |
$7.79 |
$7.83 |
$8.91 |
$8.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,798.00 |
$41,000.00 |
$32,000.00 |
$50,727.50 |
$31,500.00 |
$52,205.00 |
$52,451.25 |
$50,183.41 |
$36,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 979 | LF |
$8.70 |
$31.80 |
$10.00 |
$14.93 |
$6.00 |
$11.66 |
$6.84 |
$11.47 |
$9.50 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,990 | LF |
$1.80 |
$1.12 |
$1.25 |
$1.04 |
$1.10 |
$1.07 |
$1.08 |
$2.39 |
$1.30 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 434 | LF |
$8.50 |
$6.59 |
$8.00 |
$6.06 |
$6.10 |
$6.24 |
$6.27 |
$8.31 |
$7.40 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 12 | CY |
$111.20 |
$65.46 |
$180.00 |
$123.60 |
$72.00 |
$159.00 |
$66.86 |
$176.30 |
$37.00 |
| 9 | 221(K) 0600 |
TEMPORARY FIBER LOG | 490 | LF |
$3.80 |
$3.92 |
$3.30 |
$3.60 |
$4.00 |
$3.71 |
$3.73 |
$4.00 |
$3.15 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 64,768 | SY |
$1.10 |
$1.12 |
$1.25 |
$1.03 |
$1.10 |
$1.06 |
$1.07 |
$1.37 |
$1.25 |
| 11 | 232(B) 2814 |
SEEDING METHOD B | 14 | AC |
$264.30 |
$207.03 |
$410.00 |
$190.55 |
$200.00 |
$196.10 |
$197.03 |
$472.06 |
$419.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.38 | AC |
$179.00 |
$232.10 |
$100.00 |
$360.50 |
$365.00 |
$371.00 |
$372.75 |
$113.53 |
$100.00 |
| 13 | 241 2832 |
MOWING | 27 | AC |
$68.00 |
$50.36 |
$50.00 |
$46.35 |
$46.50 |
$47.70 |
$47.93 |
$58.56 |
$52.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,582 | CY |
$41.40 |
$37.00 |
$35.00 |
$36.51 |
$43.00 |
$37.58 |
$37.75 |
$36.53 |
$40.00 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 31,427 | SY |
$6.90 |
$5.83 |
$8.00 |
$5.60 |
$6.00 |
$5.77 |
$5.79 |
$4.00 |
$7.30 |
| 16 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 31,427 | SY |
$3.00 |
$3.32 |
$4.00 |
$4.01 |
$3.45 |
$4.18 |
$4.15 |
$4.19 |
$3.90 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,532 | TON |
$24.80 |
$18.06 |
$15.00 |
$18.53 |
$21.00 |
$19.07 |
$19.16 |
$18.08 |
$32.45 |
| 18 | 408 5774 |
PRIME COAT | 19,254 | GAL |
$3.60 |
$0.5000 |
$1.00 |
$5.15 |
$3.50 |
$3.39 |
$1.00 |
$5.00 |
$3.50 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,521 | TON |
$65.80 |
$50.00 |
$46.00 |
$53.04 |
$53.90 |
$55.12 |
$54.85 |
$76.46 |
$56.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,244 | TON |
$73.50 |
$53.75 |
$60.00 |
$70.04 |
$67.40 |
$66.78 |
$72.42 |
$86.30 |
$68.00 |
| 21 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 200 | TON |
$147.30 |
$114.03 |
$120.00 |
$103.00 |
$93.00 |
$90.10 |
$106.50 |
$177.35 |
$92.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 1,476 | SY |
$8.20 |
$6.99 |
$2.00 |
$8.24 |
$7.55 |
$4.24 |
$5.60 |
$5.98 |
$4.75 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 30 | CY |
$26.50 |
$22.38 |
$60.00 |
$36.05 |
$21.15 |
$12.72 |
$21.12 |
$26.89 |
$37.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 68 | CY |
$530.60 |
$780.00 |
$500.00 |
$515.00 |
$651.00 |
$653.54 |
$522.29 |
$594.61 |
$544.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 25 | CY |
$293.00 |
$559.54 |
$450.00 |
$412.00 |
$456.00 |
$434.61 |
$1,016.05 |
$448.16 |
$399.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 9,564 | LB |
$1.10 |
$1.01 |
$1.25 |
$1.03 |
$0.8000 |
$1.11 |
$0.2500 |
$1.27 |
$0.5500 |
| 27 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 30 | LF |
$30.00 |
$34.24 |
$40.00 |
$30.90 |
$32.70 |
$31.80 |
$35.11 |
$52.36 |
$58.00 |
| 28 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 205 | LF |
$32.40 |
$31.22 |
$45.00 |
$32.75 |
$32.90 |
$33.71 |
$33.87 |
$39.92 |
$60.00 |
| 29 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 48 | LF |
$41.50 |
$26.77 |
$50.00 |
$37.68 |
$52.25 |
$38.78 |
$38.96 |
$43.83 |
$62.00 |
| 30 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 60 | LF |
$46.30 |
$29.88 |
$55.00 |
$46.11 |
$64.75 |
$47.46 |
$47.68 |
$76.61 |
$64.00 |
| 31 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 286 | LF |
$60.30 |
$43.81 |
$60.00 |
$58.17 |
$66.90 |
$59.85 |
$60.15 |
$81.51 |
$68.00 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 44 | LF |
$34.50 |
$49.52 |
$55.00 |
$43.23 |
$48.75 |
$44.49 |
$44.70 |
$52.99 |
$55.00 |
| 33 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,361.80 |
$1,230.99 |
$1,200.00 |
$1,442.00 |
$1,305.00 |
$1,288.50 |
$1,575.51 |
$1,054.91 |
$2,600.00 |
| 34 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,427.00 |
$1,398.85 |
$1,500.00 |
$1,545.00 |
$1,345.00 |
$1,351.06 |
$1,849.55 |
$1,230.61 |
$2,870.00 |
| 35 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,650.00 |
$1,790.53 |
$2,000.00 |
$1,699.50 |
$1,465.00 |
$2,131.59 |
$1,849.55 |
$1,563.40 |
$3,135.00 |
| 36 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 6 | EA |
$1,800.00 |
$1,566.72 |
$2,500.00 |
$1,854.00 |
$1,565.00 |
$2,648.69 |
$2,051.14 |
$1,946.47 |
$3,455.00 |
| 37 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$11,715.00 |
$12,001.56 |
$15,000.00 |
$15,965.00 |
$12,931.00 |
$16,430.00 |
$16,507.50 |
$12,267.60 |
$26,000.00 |
| 38 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,734.80 |
$1,369.67 |
$500.00 |
$2,060.00 |
$730.00 |
$2,120.00 |
$2,033.76 |
$1,613.37 |
$1,354.00 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,724 | SY |
$3.70 |
$2.53 |
$3.00 |
$3.61 |
$2.60 |
$4.66 |
$4.34 |
$3.53 |
$2.70 |
| 40 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 18,396 | SY |
$6.80 |
$4.90 |
$4.00 |
$8.24 |
$5.50 |
$8.48 |
$7.52 |
$6.77 |
$4.75 |
| 41 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,753 | LF |
$3.00 |
$1.96 |
$2.00 |
$1.80 |
$1.90 |
$1.86 |
$2.26 |
$2.09 |
$1.90 |
| 42 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$19.70 |
$17.91 |
$17.00 |
$16.48 |
$16.70 |
$16.96 |
$19.17 |
$19.12 |
$17.00 |
| 43 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,189.70 |
$2,461.98 |
$2,400.00 |
$2,266.00 |
$2,300.00 |
$2,332.00 |
$2,316.38 |
$2,629.20 |
$2,335.00 |
| 44 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,914.60 |
$1,678.63 |
$1,600.00 |
$1,545.00 |
$1,600.00 |
$1,590.00 |
$1,554.90 |
$1,792.64 |
$1,594.00 |
| 45 | 624(A) 4281 |
FENCE-STYLE WWF | 838 | LF |
$6.80 |
$9.23 |
$9.50 |
$10.30 |
$8.50 |
$8.75 |
$10.01 |
$7.29 |
$6.50 |
| 46 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 860 | LF |
$6.30 |
$7.57 |
$9.00 |
$9.27 |
$7.00 |
$7.17 |
$9.48 |
$5.74 |
$5.10 |
| 47 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$948.10 |
$839.31 |
$1,700.00 |
$1,030.00 |
$775.00 |
$795.00 |
$1,065.00 |
$717.05 |
$640.00 |
| 48 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$108.40 |
$83.93 |
$80.00 |
$77.25 |
$80.00 |
$79.50 |
$79.88 |
$89.63 |
$80.00 |
| 49 | 629(C) 4960 |
MAILBOX | 5 | EA |
$69.70 |
$27.98 |
$30.00 |
$25.75 |
$30.00 |
$26.50 |
$26.63 |
$29.88 |
$27.00 |
| 50 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$39.30 |
$5.60 |
$5.00 |
$5.15 |
$30.00 |
$5.30 |
$5.33 |
$5.98 |
$5.35 |
| 51 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$15.00 |
$22.38 |
$22.00 |
$20.60 |
$16.00 |
$21.20 |
$14.38 |
$23.90 |
$22.00 |
| 52 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$30.00 |
$16.79 |
$30.00 |
$20.60 |
$80.00 |
$22.89 |
$33.22 |
$14.86 |
$25.00 |
| 53 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$130.00 |
$179.05 |
$90.00 |
$185.26 |
$125.00 |
$137.61 |
$132.60 |
$164.21 |
$146.00 |
| 54 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,295 | LF |
$250.00 |
$250.00 |
$250.00 |
$210.15 |
$225.00 |
$220.27 |
$300.00 |
$214.43 |
$234.00 |
| 55 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$219.34 |
$165.00 |
$189.05 |
$156.00 |
$248.51 |
$180.00 |
$181.93 |
$264.00 |
| 56 | 504(B) 1305 |
SAW-CUT GROOVING | 1,255.4 | SY |
$5.20 |
$4.35 |
$4.00 |
$4.94 |
$5.00 |
$4.42 |
$4.31 |
$4.84 |
$4.70 |
| 57 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 617 | LF |
$95.00 |
$70.00 |
$60.00 |
$74.97 |
$68.00 |
$74.80 |
$79.90 |
$83.47 |
$80.00 |
| 58 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$3.10 |
$2.01 |
$2.00 |
$2.20 |
$2.10 |
$2.34 |
$3.20 |
$3.93 |
$2.50 |
| 59 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$800.00 |
$559.54 |
$500.00 |
$489.02 |
$520.00 |
$572.53 |
$171.40 |
$304.76 |
$608.00 |
| 60 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,800.00 |
$559.54 |
$1,500.00 |
$1,394.23 |
$1,560.00 |
$1,534.19 |
$1,800.00 |
$1,511.57 |
$1,630.00 |
| 61 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$500.00 |
$1,119.08 |
$350.00 |
$477.38 |
$520.00 |
$615.72 |
$260.00 |
$277.22 |
$655.00 |
| 62 | 509 6152 |
SPECIAL CONCRETE FINISH | 17.9 | SY |
$120.00 |
$233.89 |
$120.00 |
$215.27 |
$125.00 |
$109.00 |
$222.58 |
$200.00 |
$115.00 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 350.1 | CY |
$675.00 |
$490.00 |
$700.00 |
$480.13 |
$560.00 |
$609.22 |
$500.00 |
$686.18 |
$647.00 |
| 64 | 509(B) 1328 |
CLASS A CONCRETE | 181.9 | CY |
$720.00 |
$499.00 |
$700.00 |
$480.13 |
$803.00 |
$663.72 |
$700.00 |
$769.09 |
$705.00 |
| 65 | 511(A) 1332 |
REINFORCING STEEL | 988 | LB |
$1.20 |
$0.9000 |
$3.00 |
$1.47 |
$1.15 |
$1.18 |
$1.37 |
$1.35 |
$1.25 |
| 66 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 127,326 | LB |
$1.20 |
$0.9000 |
$1.00 |
$1.13 |
$1.15 |
$1.04 |
$1.10 |
$0.9200 |
$1.12 |
| 67 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$300.00 |
$548.35 |
$300.00 |
$504.70 |
$337.00 |
$453.81 |
$521.85 |
$169.30 |
$482.00 |
| 68 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 100 | SY |
$450.00 |
$641.46 |
$400.00 |
$591.22 |
$441.00 |
$568.75 |
$610.46 |
$326.76 |
$605.00 |
| 69 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 603 | LF |
$35.00 |
$50.36 |
$25.00 |
$29.97 |
$35.25 |
$29.41 |
$27.54 |
$28.90 |
$31.00 |
| 70 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 603 | LF |
$16.00 |
$50.36 |
$25.00 |
$17.51 |
$15.60 |
$10.90 |
$30.43 |
$27.77 |
$11.60 |
| 71 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 72 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,210 | SY |
$4.20 |
$5.60 |
$4.00 |
$4.79 |
$3.75 |
$3.49 |
$3.41 |
$4.36 |
$3.75 |
| 73 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 88 | LF |
$1,200.00 |
$1,100.00 |
$900.00 |
$1,214.27 |
$3,211.00 |
$1,345.32 |
$1,077.00 |
$959.17 |
$1,430.00 |
| 74 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$7,274.03 |
$6,500.00 |
$2,652.25 |
$2,125.00 |
$9,701.00 |
$1,491.00 |
$1,882.27 |
$10,300.00 |
| 75 | 523(A) 6550 |
SEALER CRACK PREPARATION | 253 | LF |
$4.00 |
$16.79 |
$4.00 |
$5.15 |
$4.50 |
$4.36 |
$4.26 |
$4.78 |
$4.65 |
| 76 | 523(B) 6560 |
SEALER RESIN | 2.8 | GAL |
$130.00 |
$111.91 |
$110.00 |
$116.39 |
$110.00 |
$109.00 |
$106.50 |
$119.51 |
$115.00 |
| 77 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,600 | TON |
$38.00 |
$33.57 |
$35.00 |
$40.21 |
$34.00 |
$16.35 |
$35.23 |
$31.16 |
$45.00 |
| 78 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 320 | TON |
$32.00 |
$27.98 |
$25.00 |
$27.97 |
$29.00 |
$13.08 |
$29.28 |
$24.59 |
$34.00 |
| 79 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$11.19 |
$10.00 |
$30.90 |
$19.00 |
$21.80 |
$41.00 |
$17.78 |
$23.00 |
| 80 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$28.00 |
$11.19 |
$10.00 |
$30.90 |
$19.00 |
$16.35 |
$31.82 |
$10.15 |
$17.00 |
| 81 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$51,000.00 |
$49,302.40 |
$56,650.00 |
$33,900.00 |
$103,550.00 |
$184,000.00 |
$41,479.89 |
$109,812.05 |
| 82 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,212 | LF |
$0.2000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1500 |
| 83 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 415 | LF |
$2.40 |
$1.12 |
$1.10 |
$1.03 |
$1.10 |
$1.08 |
$1.07 |
$1.20 |
$1.05 |
| 84 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 574 | LF |
$1.00 |
$0.5600 |
$0.5000 |
$0.5200 |
$0.5000 |
$0.5400 |
$0.5300 |
$0.6000 |
$0.5500 |
| 85 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$21.10 |
$2.80 |
$5.00 |
$2.58 |
$2.60 |
$2.70 |
$2.66 |
$2.99 |
$2.65 |
| 86 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,520 | SD |
$0.5000 |
$1.12 |
$1.10 |
$1.03 |
$1.10 |
$1.08 |
$1.07 |
$1.20 |
$1.05 |
| 87 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,610 | SD |
$1.00 |
$0.1700 |
$0.2000 |
$0.1500 |
$0.2000 |
$0.1600 |
$0.1600 |
$0.1800 |
$0.2000 |
| 88 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,310 | SD |
$1.00 |
$1.12 |
$1.10 |
$1.03 |
$1.10 |
$1.08 |
$1.07 |
$1.20 |
$1.05 |
| 89 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 840 | SD |
$0.8000 |
$3.36 |
$1.10 |
$3.09 |
$3.25 |
$3.24 |
$3.20 |
$3.59 |
$3.20 |
| 90 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.8000 |
$1.12 |
$1.10 |
$1.03 |
$1.10 |
$1.08 |
$1.07 |
$1.20 |
$1.05 |
| 91 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,990 | SD |
$0.3000 |
$1.12 |
$1.10 |
$1.03 |
$1.10 |
$1.08 |
$1.07 |
$1.20 |
$1.05 |
| 92 | 880(F) 8878 |
DRUMS | 3,150 | SD |
$0.3000 |
$0.2800 |
$0.3000 |
$0.2600 |
$0.3000 |
$0.2700 |
$0.2700 |
$0.3000 |
$0.3000 |
| 93 | 880(G) 8890 |
CHANNELIZER CONES | 17,070 | SD |
$0.2000 |
$0.0600 |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
| 94 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 448 | SD |
$9.60 |
$5.60 |
$5.50 |
$5.15 |
$5.20 |
$5.40 |
$5.33 |
$5.98 |
$5.30 |
| 95 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 8,083 | LF |
$0.4000 |
$0.2000 |
$0.4000 |
$0.1900 |
$0.5000 |
$0.5400 |
$0.1900 |
$0.2200 |
$0.2000 |
| 96 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$85.10 |
$55.95 |
$100.00 |
$51.50 |
$52.00 |
$54.00 |
$53.25 |
$59.75 |
$53.00 |
| 97 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$219.70 |
$111.91 |
$110.00 |
$103.00 |
$104.00 |
$108.00 |
$106.50 |
$119.51 |
$106.00 |
| 98 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 112 | SF |
$18.50 |
$11.19 |
$11.00 |
$10.30 |
$10.40 |
$10.80 |
$10.65 |
$11.95 |
$10.50 |
| 99 | 851(C) 8324 |
2" SQUARE TUBE POST | 196 | LF |
$9.30 |
$6.71 |
$7.00 |
$6.18 |
$6.25 |
$6.48 |
$6.39 |
$7.17 |
$6.35 |
| 100 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 18,534 | LF |
$0.6000 |
$0.3900 |
$0.4000 |
$0.3600 |
$0.4000 |
$0.3800 |
$0.3700 |
$0.4200 |
$0.4000 |
| 101 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,761.30 |
$50,358.71 |
$30,000.00 |
$29,870.00 |
$35,981.00 |
$52,488.00 |
$34,293.00 |
$32,867.97 |
$51,000.00 |
| 102 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,413.60 |
$1,100.00 |
$6,500.00 |
$2,575.00 |
$8,215.00 |
$4,400.00 |
$1,993.93 |
$2,500.00 |
$5,000.00 |
| 103 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$9,344.20 |
$1,800.00 |
$4,000.00 |
$3,090.00 |
$6,820.00 |
$13,200.00 |
$31,179.79 |
$4,182.82 |
$9,400.00 |
| 104 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,156.20 |
$152,000.00 |
$224,150.00 |
$147,471.42 |
$200,000.00 |
$235,784.29 |
$220,000.00 |
$176,511.29 |
$243,000.00 |