Bid tab 170141

Let Mar 16, 2017 · Division 8 · Tulsa Sign up free

‹ Mar 2017 results

BRIDGE AND APPROACHES US -64: OVER SNAKE CREEK, 4.8 MILES SOUTH AND EAST OF THE SH-67 JUNCTION IN BIXBY. PROJECT LENGTH = 0.823 MILE

Let date
Thursday, March 16, 2017
Contract
170141
J/P numbers
27937(04)
District
Division 8
County
Tulsa
Highway
Limits
BRIDGE AND APPROACHES US -64: OVER SNAKE CREEK, 4.8 MILES SOUTH AND EAST OF THE SH-67 JUNCTION IN BIXBY. PROJECT LENGTH = 0.823 MILE
Project number
STP-272C(202)

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,211,678
1 GLOVER & ASSOCIATES, INC. Low bidder $3,901,904 -7.4%
2 BECCO CONTRACTORS, INC. $3,983,000 -5.4% +2.1%
3 Treas Construction Inc $4,035,257 -4.2% +3.4%
4 APAC-CENTRAL, INC. $4,084,212 -3.0% +4.7%
6 Frontier Bridge, Inc. $4,290,488 +1.9% +10.0%
7 OBC, INC. $4,395,819 +4.4% +12.7%
8 SHERWOOD CONSTRUCTION CO., INC. $4,416,019 +4.9% +13.2%
9 Paragon Contractors, LLC $4,453,453 +5.7% +14.1%

Bid tab: unit prices 104 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 GLOVER & ASSOCI…#2 BECCO CONTRACTO…#3 Treas Construct…#4 APAC-CENTRAL, I…#6 Frontier Bridge…#7 OBC, INC.#8 SHERWOOD CONSTR…#9 Paragon Contrac…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,398.40 $75,000.00 $65,000.00 $49,955.00 $30,000.00 $51,410.00 $51,652.50 $67,068.40 $56,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION21,735CY $7.40 $8.50 $8.00 $8.12 $3.50 $8.35 $8.39 $8.91 $8.00
3202(D) 0184 UNCLASSIFIED BORROW53,467CY $7.50 $7.50 $8.00 $7.57 $7.00 $7.79 $7.83 $8.91 $8.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $15,798.00 $41,000.00 $32,000.00 $50,727.50 $31,500.00 $52,205.00 $52,451.25 $50,183.41 $36,000.00
5210 0121 OBLITERATING ABANDONED ROAD979LF $8.70 $31.80 $10.00 $14.93 $6.00 $11.66 $6.84 $11.47 $9.50
6221(C) 2801 TEMPORARY SILT FENCE2,990LF $1.80 $1.12 $1.25 $1.04 $1.10 $1.07 $1.08 $2.39 $1.30
7221(F) 0100 TEMPORARY SILT DIKE434LF $8.50 $6.59 $8.00 $6.06 $6.10 $6.24 $6.27 $8.31 $7.40
8221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 112CY $111.20 $65.46 $180.00 $123.60 $72.00 $159.00 $66.86 $176.30 $37.00
9221(K) 0600 TEMPORARY FIBER LOG490LF $3.80 $3.92 $3.30 $3.60 $4.00 $3.71 $3.73 $4.00 $3.15
10230(A) 2806 SOLID SLAB SODDING64,768SY $1.10 $1.12 $1.25 $1.03 $1.10 $1.06 $1.07 $1.37 $1.25
11232(B) 2814 SEEDING METHOD B14AC $264.30 $207.03 $410.00 $190.55 $200.00 $196.10 $197.03 $472.06 $419.00
12233(A) 2817 VEGETATIVE MULCHING13.38AC $179.00 $232.10 $100.00 $360.50 $365.00 $371.00 $372.75 $113.53 $100.00
13241 2832 MOWING27AC $68.00 $50.36 $50.00 $46.35 $46.50 $47.70 $47.93 $58.56 $52.00
14303(A) 2100 AGGREGATE BASE TYPE A6,582CY $41.40 $37.00 $35.00 $36.51 $43.00 $37.58 $37.75 $36.53 $40.00
15307(K) 4300 STABILIZED SUBGRADE31,427SY $6.90 $5.83 $8.00 $5.60 $6.00 $5.77 $5.79 $4.00 $7.30
16326(A) 0100 GEOTEXTILE REINFORCEMENT31,427SY $3.00 $3.32 $4.00 $4.01 $3.45 $4.18 $4.15 $4.19 $3.90
17402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,532TON $24.80 $18.06 $15.00 $18.53 $21.00 $19.07 $19.16 $18.08 $32.45
18408 5774 PRIME COAT19,254GAL $3.60 $0.5000 $1.00 $5.15 $3.50 $3.39 $1.00 $5.00 $3.50
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)9,521TON $65.80 $50.00 $46.00 $53.04 $53.90 $55.12 $54.85 $76.46 $56.00
20411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)3,244TON $73.50 $53.75 $60.00 $70.04 $67.40 $66.78 $72.42 $86.30 $68.00
21411(H) 6210 SUPERPAVE, TYPE S3(PATCH)(PG64-22OK)200TON $147.30 $114.03 $120.00 $103.00 $93.00 $90.10 $106.50 $177.35 $92.00
22412 5267 COLD MILLING PAVEMENT1,476SY $8.20 $6.99 $2.00 $8.24 $7.55 $4.24 $5.60 $5.98 $4.75
23501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED30CY $26.50 $22.38 $60.00 $36.05 $21.15 $12.72 $21.12 $26.89 $37.00
24509(A) 0319 CLASS AA CONCRETE68CY $530.60 $780.00 $500.00 $515.00 $651.00 $653.54 $522.29 $594.61 $544.00
25509(D) 0325 CLASS C CONCRETE25CY $293.00 $559.54 $450.00 $412.00 $456.00 $434.61 $1,016.05 $448.16 $399.00
26511(A) 0332 REINFORCING STEEL9,564LB $1.10 $1.01 $1.25 $1.03 $0.8000 $1.11 $0.2500 $1.27 $0.5500
27613(B) 0688 12" CORR. GALV. STEEL PIPE30LF $30.00 $34.24 $40.00 $30.90 $32.70 $31.80 $35.11 $52.36 $58.00
28613(B) 0689 18" CORR. GALV. STEEL PIPE205LF $32.40 $31.22 $45.00 $32.75 $32.90 $33.71 $33.87 $39.92 $60.00
29613(B) 0690 24" CORR. GALV. STEEL PIPE48LF $41.50 $26.77 $50.00 $37.68 $52.25 $38.78 $38.96 $43.83 $62.00
30613(B) 0691 30" CORR. GALV. STEEL PIPE60LF $46.30 $29.88 $55.00 $46.11 $64.75 $47.46 $47.68 $76.61 $64.00
31613(B) 0692 36" CORR. GALV. STEEL PIPE286LF $60.30 $43.81 $60.00 $58.17 $66.90 $59.85 $60.15 $81.51 $68.00
32613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH44LF $34.50 $49.52 $55.00 $43.23 $48.75 $44.49 $44.70 $52.99 $55.00
33613(M) 7196 TYPE A6 CULVERT END TREATMENT4EA $1,361.80 $1,230.99 $1,200.00 $1,442.00 $1,305.00 $1,288.50 $1,575.51 $1,054.91 $2,600.00
34613(M) 7197 TYPE B6 CULVERT END TREATMENT4EA $1,427.00 $1,398.85 $1,500.00 $1,545.00 $1,345.00 $1,351.06 $1,849.55 $1,230.61 $2,870.00
35613(M) 7198 TYPE C6 CULVERT END TREATMENT2EA $1,650.00 $1,790.53 $2,000.00 $1,699.50 $1,465.00 $2,131.59 $1,849.55 $1,563.40 $3,135.00
36613(M) 7199 TYPE D6 CULVERT END TREATMENT6EA $1,800.00 $1,566.72 $2,500.00 $1,854.00 $1,565.00 $2,648.69 $2,051.14 $1,946.47 $3,455.00
37619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $11,715.00 $12,001.56 $15,000.00 $15,965.00 $12,931.00 $16,430.00 $16,507.50 $12,267.60 $26,000.00
38619(B) 0291 REMOVAL OF HEADWALL1EA $1,734.80 $1,369.67 $500.00 $2,060.00 $730.00 $2,120.00 $2,033.76 $1,613.37 $1,354.00
39619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9,724SY $3.70 $2.53 $3.00 $3.61 $2.60 $4.66 $4.34 $3.53 $2.70
40619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY18,396SY $6.80 $4.90 $4.00 $8.24 $5.50 $8.48 $7.52 $6.77 $4.75
41619(B) 4780 REMOVAL OF GUARDRAIL1,753LF $3.00 $1.96 $2.00 $1.80 $1.90 $1.86 $2.26 $2.09 $1.90
42623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE400LF $19.70 $17.91 $17.00 $16.48 $16.70 $16.96 $19.17 $19.12 $17.00
43623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,189.70 $2,461.98 $2,400.00 $2,266.00 $2,300.00 $2,332.00 $2,316.38 $2,629.20 $2,335.00
44623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,914.60 $1,678.63 $1,600.00 $1,545.00 $1,600.00 $1,590.00 $1,554.90 $1,792.64 $1,594.00
45624(A) 4281 FENCE-STYLE WWF838LF $6.80 $9.23 $9.50 $10.30 $8.50 $8.75 $10.01 $7.29 $6.50
46624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)860LF $6.30 $7.57 $9.00 $9.27 $7.00 $7.17 $9.48 $5.74 $5.10
47624(D) 4470 GATE, GALVANIZED STEEL1EA $948.10 $839.31 $1,700.00 $1,030.00 $775.00 $795.00 $1,065.00 $717.05 $640.00
48629(A) 4958 MAILBOX INSTALLATION-SINGLE5EA $108.40 $83.93 $80.00 $77.25 $80.00 $79.50 $79.88 $89.63 $80.00
49629(C) 4960 MAILBOX5EA $69.70 $27.98 $30.00 $25.75 $30.00 $26.50 $26.63 $29.88 $27.00
50629(D) 4961 REMOVAL OF MAILBOX INSTALLATION5EA $39.30 $5.60 $5.00 $5.15 $30.00 $5.30 $5.33 $5.98 $5.35
51853 9033 DELINEATORS(TYPE 2, CODE 1)14EA $15.00 $22.38 $22.00 $20.60 $16.00 $21.20 $14.38 $23.90 $22.00
52501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $30.00 $16.79 $30.00 $20.60 $80.00 $22.89 $33.22 $14.86 $25.00
53501(G) 6309 CLSM BACKFILL200CY $130.00 $179.05 $90.00 $185.26 $125.00 $137.61 $132.60 $164.21 $146.00
54503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,295LF $250.00 $250.00 $250.00 $210.15 $225.00 $220.27 $300.00 $214.43 $234.00
55504(A) 1304 APPROACH SLAB224.8SY $180.00 $219.34 $165.00 $189.05 $156.00 $248.51 $180.00 $181.93 $264.00
56504(B) 1305 SAW-CUT GROOVING1,255.4SY $5.20 $4.35 $4.00 $4.94 $5.00 $4.42 $4.31 $4.84 $4.70
57504(D) 6245 CONCRETE RAIL (TR4)617LF $95.00 $70.00 $60.00 $74.97 $68.00 $74.80 $79.90 $83.47 $80.00
58506(A) 1322 STRUCTURAL STEEL1,050LB $3.10 $2.01 $2.00 $2.20 $2.10 $2.34 $3.20 $3.93 $2.50
59507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $800.00 $559.54 $500.00 $489.02 $520.00 $572.53 $171.40 $304.76 $608.00
60507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $1,800.00 $559.54 $1,500.00 $1,394.23 $1,560.00 $1,534.19 $1,800.00 $1,511.57 $1,630.00
61507(C) 6282 ELASTOMERIC BEARING PADS20EA $500.00 $1,119.08 $350.00 $477.38 $520.00 $615.72 $260.00 $277.22 $655.00
62509 6152 SPECIAL CONCRETE FINISH17.9SY $120.00 $233.89 $120.00 $215.27 $125.00 $109.00 $222.58 $200.00 $115.00
63509(A) 1326 CLASS AA CONCRETE350.1CY $675.00 $490.00 $700.00 $480.13 $560.00 $609.22 $500.00 $686.18 $647.00
64509(B) 1328 CLASS A CONCRETE181.9CY $720.00 $499.00 $700.00 $480.13 $803.00 $663.72 $700.00 $769.09 $705.00
65511(A) 1332 REINFORCING STEEL988LB $1.20 $0.9000 $3.00 $1.47 $1.15 $1.18 $1.37 $1.35 $1.25
66511(B) 6010 EPOXY COATED REINFORCING STEEL127,326LB $1.20 $0.9000 $1.00 $1.13 $1.15 $1.04 $1.10 $0.9200 $1.12
67513(B) 6019 CLASS B BRIDGE DECK REPAIR100SY $300.00 $548.35 $300.00 $504.70 $337.00 $453.81 $521.85 $169.30 $482.00
68513(C) 6020 CLASS C BRIDGE DECK REPAIR100SY $450.00 $641.46 $400.00 $591.22 $441.00 $568.75 $610.46 $326.76 $605.00
69514(A) 6010 PILES, FURNISHED (HP 10X42)603LF $35.00 $50.36 $25.00 $29.97 $35.25 $29.41 $27.54 $28.90 $31.00
70514(B) 6292 PILES, DRIVEN (HP 10X42)603LF $16.00 $50.36 $25.00 $17.51 $15.60 $10.90 $30.43 $27.77 $11.60
71514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
72515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,210SY $4.20 $5.60 $4.00 $4.79 $3.75 $3.49 $3.41 $4.36 $3.75
73516(A) 6096 DRILLED SHAFTS 60" DIAMETER88LF $1,200.00 $1,100.00 $900.00 $1,214.27 $3,211.00 $1,345.32 $1,077.00 $959.17 $1,430.00
74516(C) 6200 CROSSHOLE SONIC LOGGING1EA $3,500.00 $7,274.03 $6,500.00 $2,652.25 $2,125.00 $9,701.00 $1,491.00 $1,882.27 $10,300.00
75523(A) 6550 SEALER CRACK PREPARATION253LF $4.00 $16.79 $4.00 $5.15 $4.50 $4.36 $4.26 $4.78 $4.65
76523(B) 6560 SEALER RESIN2.8GAL $130.00 $111.91 $110.00 $116.39 $110.00 $109.00 $106.50 $119.51 $115.00
77601(B) 1353 TYPE I-A PLAIN RIPRAP1,600TON $38.00 $33.57 $35.00 $40.21 $34.00 $16.35 $35.23 $31.16 $45.00
78601(C) 1355 TYPE I-A FILTER BLANKET320TON $32.00 $27.98 $25.00 $27.97 $29.00 $13.08 $29.28 $24.59 $34.00
79613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $30.00 $11.19 $10.00 $30.90 $19.00 $21.80 $41.00 $17.78 $23.00
80613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.44LF $28.00 $11.19 $10.00 $30.90 $19.00 $16.35 $31.82 $10.15 $17.00
81619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $100,000.00 $51,000.00 $49,302.40 $56,650.00 $33,900.00 $103,550.00 $184,000.00 $41,479.89 $109,812.05
82857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)14,212LF $0.2000 $0.1100 $0.1000 $0.1000 $0.1500 $0.1100 $0.1100 $0.1200 $0.1500
83857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)415LF $2.40 $1.12 $1.10 $1.03 $1.10 $1.08 $1.07 $1.20 $1.05
84857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)574LF $1.00 $0.5600 $0.5000 $0.5200 $0.5000 $0.5400 $0.5300 $0.6000 $0.5500
85876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR120SD $21.10 $2.80 $5.00 $2.58 $2.60 $2.70 $2.66 $2.99 $2.65
86880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF2,520SD $0.5000 $1.12 $1.10 $1.03 $1.10 $1.08 $1.07 $1.20 $1.05
87880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,610SD $1.00 $0.1700 $0.2000 $0.1500 $0.2000 $0.1600 $0.1600 $0.1800 $0.2000
88880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,310SD $1.00 $1.12 $1.10 $1.03 $1.10 $1.08 $1.07 $1.20 $1.05
89880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)840SD $0.8000 $3.36 $1.10 $3.09 $3.25 $3.24 $3.20 $3.59 $3.20
90880(C) 8848 WING BARRICADES840SD $0.8000 $1.12 $1.10 $1.03 $1.10 $1.08 $1.07 $1.20 $1.05
91880(E) 8860 WARNING LIGHTS(TYPE A)3,990SD $0.3000 $1.12 $1.10 $1.03 $1.10 $1.08 $1.07 $1.20 $1.05
92880(F) 8878 DRUMS3,150SD $0.3000 $0.2800 $0.3000 $0.2600 $0.3000 $0.2700 $0.2700 $0.3000 $0.3000
93880(G) 8890 CHANNELIZER CONES17,070SD $0.2000 $0.0600 $0.1000 $0.0500 $0.0500 $0.0500 $0.0500 $0.0600 $0.0500
94882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN448SD $9.60 $5.60 $5.50 $5.15 $5.20 $5.40 $5.33 $5.98 $5.30
95413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC8,083LF $0.4000 $0.2000 $0.4000 $0.1900 $0.5000 $0.5400 $0.1900 $0.2200 $0.2000
96805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS1EA $85.10 $55.95 $100.00 $51.50 $52.00 $54.00 $53.25 $59.75 $53.00
97805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS1EA $219.70 $111.91 $110.00 $103.00 $104.00 $108.00 $106.50 $119.51 $106.00
98850(A) 8110 SHEET ALUMINUM SIGNS112SF $18.50 $11.19 $11.00 $10.30 $10.40 $10.80 $10.65 $11.95 $10.50
99851(C) 8324 2" SQUARE TUBE POST196LF $9.30 $6.71 $7.00 $6.18 $6.25 $6.48 $6.39 $7.17 $6.35
100856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)18,534LF $0.6000 $0.3900 $0.4000 $0.3600 $0.4000 $0.3800 $0.3700 $0.4200 $0.4000
101642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,761.30 $50,358.71 $30,000.00 $29,870.00 $35,981.00 $52,488.00 $34,293.00 $32,867.97 $51,000.00
102220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,413.60 $1,100.00 $6,500.00 $2,575.00 $8,215.00 $4,400.00 $1,993.93 $2,500.00 $5,000.00
103640(A) 1398 FIELD OFFICE1EA $9,344.20 $1,800.00 $4,000.00 $3,090.00 $6,820.00 $13,200.00 $31,179.79 $4,182.82 $9,400.00
104641 1399 MOBILIZATION1LSUM $75,156.20 $152,000.00 $224,150.00 $147,471.42 $200,000.00 $235,784.29 $220,000.00 $176,511.29 $243,000.00