Bid tab 150229

Let Nov 19, 2015 · · Stp-218d(040)ci Sign up free

‹ Nov 2015 results

CRAIG BRIDGE AND APPROACHES COUNTY ROAD (NS-439/EW-24): OVER ELM CREEK, 2 MI N OF US-69 ON NS-439, AND 1.8 MI W OF SH-2 ON EW-24 NEAR VINITA . PROJECT LENGTH = 0.388 MILE

Let date
Thursday, November 19, 2015
Contract
150229
J/P numbers
28529(04)
District
County
Stp-218d(040)ci
Highway
Limits
CRAIG BRIDGE AND APPROACHES COUNTY ROAD (NS-439/EW-24): OVER ELM CREEK, 2 MI N OF US-69 ON NS-439, AND 1.8 MI W OF SH-2 ON EW-24 NEAR VINITA . PROJECT LENGTH = 0.388 MILE
Project number
STP-218C(041)CI

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,171,112
1 RRY SERVICES LLC Low bidder $2,151,975 -0.9%
3 B & B BRIDGE COMPANY, LLC $2,214,769 +2.0% +2.9%
4 Crossland Construction Company, Inc. $2,306,014 +6.2% +7.2%

Bid tab: unit prices 101 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 RRY SERVICES LLC#3 B & B BRIDGE CO…#4 Crossland Const…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $7,500.00 $7,000.00 $6,000.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION491CY $10.00 $10.00 $6.50 $13.47
3202(D) 0184 UNCLASSIFIED BORROW6,996CY $11.00 $9.00 $10.00 $13.47
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $8,000.00 $5,000.00 $4,500.00 $7,299.00
5221(C) 2801 TEMPORARY SILT FENCE1,871LF $1.50 $1.49 $1.49 $1.65
6221(F) 0100 TEMPORARY SILT DIKE91LF $5.00 $12.95 $12.95 $14.32
7230(A) 2806 SOLID SLAB SODDING10,702SY $1.80 $1.44 $1.44 $1.59
8233(A) 2817 VEGETATIVE MULCHING3.4AC $417.00 $199.00 $199.00 $220.00
9303(A) 2100 AGGREGATE BASE TYPE A580CY $50.89 $45.00 $30.00 $49.41
10307(D) 4230 LIME5TON $250.00 $400.00 $300.00 $561.54
11307(H) 4270 LIME STABILIZED SUBGRADE3,699SY $4.50 $5.83 $4.95 $4.81
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E99TON $30.00 $22.00 $16.00 $44.91
13411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)730TON $85.00 $91.50 $77.70 $87.25
14411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)548TON $97.00 $94.50 $88.41 $100.76
15509(D) 0325 CLASS C CONCRETE20.7CY $300.00 $200.00 $350.00 $523.70
16510(A) 6333 RETAINING WALL422.3SY $675.00 $1,170.00 $1,250.00 $872.60
17601(B) 0536 TYPE I-A PLAIN RIPRAP144TON $36.00 $36.00 $60.00 $36.27
18601(C) 0538 TYPE I-A FILTER BLANKET40TON $32.00 $30.00 $40.00 $33.46
19613(A) 0494 36" R.C.PIPE CLASS III50LF $90.00 $93.00 $60.00 $121.16
20613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,100.00 $1,500.00 $1,000.00 $1,110.00
21613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C38CY $38.00 $50.00 $40.00 $40.76
22613(V) 1180 TRENCH EXCAVATION97CY $11.00 $6.00 $30.00 $11.40
23619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $3,500.00 $1,500.00 $5,614.25
24619(B) 4728 REMOVAL OF ASPHALT PAVEMENT5,344SY $4.00 $6.00 $2.50 $4.50
25501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON250CY $25.00 $15.00 $25.00 $30.09
26501(G) 6309 CLSM BACKFILL126CY $133.00 $115.00 $130.00 $140.48
27503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)459LF $270.00 $280.00 $275.00 $325.29
28504(B) 1305 SAW-CUT GROOVING371SY $5.00 $8.00 $8.00 $6.86
29504(C) 6250 SEALED EXPANSION JOINT40LF $200.00 $250.00 $250.00 $190.86
30504(D) 6239 CONCRETE RAIL (TR3)312LF $60.00 $80.00 $100.00 $112.62
31506(A) 1322 STRUCTURAL STEEL570LB $3.00 $3.00 $5.00 $1.41
32507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY4EA $500.00 $1,000.00 $500.00 $748.00
33507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY4EA $900.00 $1,000.00 $500.00 $748.00
34509(A) 1326 CLASS AA CONCRETE116CY $550.00 $625.00 $970.00 $924.00
35509(B) 1328 CLASS A CONCRETE91CY $600.00 $650.00 $970.00 $675.00
36511(A) 1332 REINFORCING STEEL42,056LB $0.9000 $0.9000 $1.00 $0.7900
37514(A) 6010 PILES, FURNISHED (HP 10X42)95LF $40.00 $42.00 $35.00 $26.85
38514(A) 6011 PILES, FURNISHED (HP 12X53)270LF $50.00 $50.00 $45.00 $33.23
39514(B) 6292 PILES, DRIVEN (HP 10X42)95LF $14.00 $10.00 $30.00 $65.21
40514(B) 6294 PILES, DRIVEN (HP 12X53)270LF $14.00 $10.00 $40.00 $65.56
41514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
42601(B) 1353 TYPE I-A PLAIN RIPRAP3,259TON $35.00 $37.00 $35.00 $31.78
43601(C) 1355 TYPE I-A FILTER BLANKET424TON $29.00 $30.00 $25.00 $25.63
44613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND72LF $25.00 $35.00 $25.00 $17.45
45613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $22.00 $35.00 $25.00 $30.70
46619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $7,500.00 $12,000.00 $15,000.00 $30,000.00
47623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,400.00 $1,775.00 $1,450.00 $1,853.00
48623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE300LF $18.00 $15.75 $17.00 $16.90
49623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,100.00 $1,825.00 $2,350.00 $2,434.00
50855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)4,400LF $0.6000 $0.6500 $0.6500 $0.7200
51880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $2,000.00 $1,800.00 $1,732.00 $1,916.00
52642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $18,000.00 $6,900.00 $6,900.00 $14,296.00
53220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,500.00 $1,200.00 $5,000.00 $15,000.00
54641 1399 MOBILIZATION1LSUM $110,000.00 $132,000.00 $65,410.00 $135,000.00
55201(A) 0102 CLEARING AND GRUBBING1LSUM $2,500.00 $8,000.00 $6,000.00 $20,000.00
56202(A) 0183 UNCLASSIFIED EXCAVATION904CY $10.00 $10.00 $6.50 $11.79
57202(D) 0184 UNCLASSIFIED BORROW3,598CY $11.00 $9.00 $10.00 $14.53
58205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $8,000.00 $4,700.00 $6,962.00
59221(C) 2801 TEMPORARY SILT FENCE1,483LF $2.00 $1.49 $1.49 $1.65
60221(F) 0100 TEMPORARY SILT DIKE161LF $7.00 $12.95 $12.95 $14.33
61221(K) 0600 TEMPORARY FIBER LOG23LF $10.00 $2.95 $2.95 $3.27
62230(A) 2806 SOLID SLAB SODDING5,526SY $2.00 $1.44 $1.44 $1.59
63233(A) 2817 VEGETATIVE MULCHING1.98AC $350.00 $199.00 $199.00 $220.00
64303(A) 2100 AGGREGATE BASE TYPE A414CY $52.61 $46.00 $30.00 $49.30
65307(D) 4230 LIME2TON $500.00 $900.00 $750.00 $841.87
66307(H) 4270 LIME STABILIZED SUBGRADE1,121SY $7.00 $5.87 $4.95 $5.61
67402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E112TON $25.00 $22.00 $16.50 $45.18
68411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)376TON $80.00 $91.50 $90.19 $101.27
69411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)302TON $90.00 $94.50 $90.96 $102.14
70509(D) 0325 CLASS C CONCRETE10CY $300.00 $250.00 $350.00 $553.10
71611(G) 5704 INLET CDI RCP DES. 11EA $1,200.00 $4,000.00 $2,500.00 $1,795.00
72613(A) 0491 18" R.C.PIPE CLASS III24LF $79.00 $45.00 $25.00 $73.89
73613(B) 0689 18" CORR. GALV. STEEL PIPE120LF $30.00 $35.00 $21.00 $33.00
74613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND1EA $382.00 $800.00 $1,400.00 $553.00
75613(M) 7186 TYPE A4 CULVERT END TREATMENT6EA $900.00 $1,500.00 $1,250.00 $955.00
76619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,500.00 $3,500.00 $2,500.00 $5,503.00
77619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,877SY $5.00 $6.00 $2.50 $4.49
78501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $25.00 $25.00 $33.19
79501(G) 6309 CLSM BACKFILL70CY $120.00 $120.00 $130.00 $134.33
80503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)314LF $270.00 $280.00 $275.00 $312.61
81504(A) 1304 APPROACH SLAB115SY $150.00 $200.00 $200.00 $209.40
82504(B) 1305 SAW-CUT GROOVING347SY $6.00 $8.00 $8.00 $7.01
83504(D) 6239 CONCRETE RAIL (TR3)275LF $60.00 $80.00 $100.00 $113.71
84506(A) 1322 STRUCTURAL STEEL630LB $3.00 $3.00 $5.00 $1.47
85507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $725.00 $1,000.00 $500.00 $171.00
86509(A) 1326 CLASS AA CONCRETE106CY $550.00 $625.00 $970.00 $861.00
87509(B) 1328 CLASS A CONCRETE42CY $610.00 $650.00 $970.00 $1,119.00
88511(A) 1332 REINFORCING STEEL27,869LB $1.00 $0.9000 $1.00 $0.8000
89514(A) 6010 PILES, FURNISHED (HP 10X42)336LF $30.00 $50.00 $35.00 $26.57
90514(B) 6292 PILES, DRIVEN (HP 10X42)336LF $12.00 $10.00 $30.00 $72.43
91514(K) 6260 (PL)PILOT HOLES280LF $120.00 $80.00 $125.00 $64.83
92514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
93601(B) 1353 TYPE I-A PLAIN RIPRAP2,216TON $30.00 $35.00 $35.00 $31.78
94601(C) 1355 TYPE I-A FILTER BLANKET261TON $25.00 $30.00 $25.00 $25.63
95613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $25.00 $30.00 $25.00 $17.44
96613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $20.00 $30.00 $25.00 $22.68
97619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $5,000.00 $10,000.00 $15,000.00 $30,000.00
98623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,500.00 $1,775.00 $1,450.00 $1,853.00
99623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,250.00 $1,825.00 $2,350.00 $2,434.00
100855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)3,840LF $0.7500 $0.6500 $0.6500 $0.7200
101880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $2,000.00 $1,732.00 $1,732.00 $1,916.00