| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$7,000.00 |
$6,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 491 | CY |
$10.00 |
$10.00 |
$6.50 |
$13.47 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,996 | CY |
$11.00 |
$9.00 |
$10.00 |
$13.47 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$5,000.00 |
$4,500.00 |
$7,299.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,871 | LF |
$1.50 |
$1.49 |
$1.49 |
$1.65 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 91 | LF |
$5.00 |
$12.95 |
$12.95 |
$14.32 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 10,702 | SY |
$1.80 |
$1.44 |
$1.44 |
$1.59 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.4 | AC |
$417.00 |
$199.00 |
$199.00 |
$220.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 580 | CY |
$50.89 |
$45.00 |
$30.00 |
$49.41 |
| 10 | 307(D) 4230 |
LIME | 5 | TON |
$250.00 |
$400.00 |
$300.00 |
$561.54 |
| 11 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 3,699 | SY |
$4.50 |
$5.83 |
$4.95 |
$4.81 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 99 | TON |
$30.00 |
$22.00 |
$16.00 |
$44.91 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 730 | TON |
$85.00 |
$91.50 |
$77.70 |
$87.25 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 548 | TON |
$97.00 |
$94.50 |
$88.41 |
$100.76 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 20.7 | CY |
$300.00 |
$200.00 |
$350.00 |
$523.70 |
| 16 | 510(A) 6333 |
RETAINING WALL | 422.3 | SY |
$675.00 |
$1,170.00 |
$1,250.00 |
$872.60 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 144 | TON |
$36.00 |
$36.00 |
$60.00 |
$36.27 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 40 | TON |
$32.00 |
$30.00 |
$40.00 |
$33.46 |
| 19 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 50 | LF |
$90.00 |
$93.00 |
$60.00 |
$121.16 |
| 20 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,100.00 |
$1,500.00 |
$1,000.00 |
$1,110.00 |
| 21 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 38 | CY |
$38.00 |
$50.00 |
$40.00 |
$40.76 |
| 22 | 613(V) 1180 |
TRENCH EXCAVATION | 97 | CY |
$11.00 |
$6.00 |
$30.00 |
$11.40 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$1,500.00 |
$5,614.25 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,344 | SY |
$4.00 |
$6.00 |
$2.50 |
$4.50 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$25.00 |
$15.00 |
$25.00 |
$30.09 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 126 | CY |
$133.00 |
$115.00 |
$130.00 |
$140.48 |
| 27 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 459 | LF |
$270.00 |
$280.00 |
$275.00 |
$325.29 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 371 | SY |
$5.00 |
$8.00 |
$8.00 |
$6.86 |
| 29 | 504(C) 6250 |
SEALED EXPANSION JOINT | 40 | LF |
$200.00 |
$250.00 |
$250.00 |
$190.86 |
| 30 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 312 | LF |
$60.00 |
$80.00 |
$100.00 |
$112.62 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 570 | LB |
$3.00 |
$3.00 |
$5.00 |
$1.41 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$500.00 |
$1,000.00 |
$500.00 |
$748.00 |
| 33 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$900.00 |
$1,000.00 |
$500.00 |
$748.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 116 | CY |
$550.00 |
$625.00 |
$970.00 |
$924.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 91 | CY |
$600.00 |
$650.00 |
$970.00 |
$675.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 42,056 | LB |
$0.9000 |
$0.9000 |
$1.00 |
$0.7900 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 95 | LF |
$40.00 |
$42.00 |
$35.00 |
$26.85 |
| 38 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 270 | LF |
$50.00 |
$50.00 |
$45.00 |
$33.23 |
| 39 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 95 | LF |
$14.00 |
$10.00 |
$30.00 |
$65.21 |
| 40 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 270 | LF |
$14.00 |
$10.00 |
$40.00 |
$65.56 |
| 41 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,259 | TON |
$35.00 |
$37.00 |
$35.00 |
$31.78 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 424 | TON |
$29.00 |
$30.00 |
$25.00 |
$25.63 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$25.00 |
$35.00 |
$25.00 |
$17.45 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$22.00 |
$35.00 |
$25.00 |
$30.70 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$12,000.00 |
$15,000.00 |
$30,000.00 |
| 47 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,400.00 |
$1,775.00 |
$1,450.00 |
$1,853.00 |
| 48 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$18.00 |
$15.75 |
$17.00 |
$16.90 |
| 49 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,100.00 |
$1,825.00 |
$2,350.00 |
$2,434.00 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,400 | LF |
$0.6000 |
$0.6500 |
$0.6500 |
$0.7200 |
| 51 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$1,800.00 |
$1,732.00 |
$1,916.00 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,000.00 |
$6,900.00 |
$6,900.00 |
$14,296.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$1,200.00 |
$5,000.00 |
$15,000.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$132,000.00 |
$65,410.00 |
$135,000.00 |
| 55 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$8,000.00 |
$6,000.00 |
$20,000.00 |
| 56 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 904 | CY |
$10.00 |
$10.00 |
$6.50 |
$11.79 |
| 57 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,598 | CY |
$11.00 |
$9.00 |
$10.00 |
$14.53 |
| 58 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$4,700.00 |
$6,962.00 |
| 59 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,483 | LF |
$2.00 |
$1.49 |
$1.49 |
$1.65 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 161 | LF |
$7.00 |
$12.95 |
$12.95 |
$14.33 |
| 61 | 221(K) 0600 |
TEMPORARY FIBER LOG | 23 | LF |
$10.00 |
$2.95 |
$2.95 |
$3.27 |
| 62 | 230(A) 2806 |
SOLID SLAB SODDING | 5,526 | SY |
$2.00 |
$1.44 |
$1.44 |
$1.59 |
| 63 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.98 | AC |
$350.00 |
$199.00 |
$199.00 |
$220.00 |
| 64 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 414 | CY |
$52.61 |
$46.00 |
$30.00 |
$49.30 |
| 65 | 307(D) 4230 |
LIME | 2 | TON |
$500.00 |
$900.00 |
$750.00 |
$841.87 |
| 66 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 1,121 | SY |
$7.00 |
$5.87 |
$4.95 |
$5.61 |
| 67 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 112 | TON |
$25.00 |
$22.00 |
$16.50 |
$45.18 |
| 68 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 376 | TON |
$80.00 |
$91.50 |
$90.19 |
$101.27 |
| 69 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 302 | TON |
$90.00 |
$94.50 |
$90.96 |
$102.14 |
| 70 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$350.00 |
$553.10 |
| 71 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$1,200.00 |
$4,000.00 |
$2,500.00 |
$1,795.00 |
| 72 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 24 | LF |
$79.00 |
$45.00 |
$25.00 |
$73.89 |
| 73 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 120 | LF |
$30.00 |
$35.00 |
$21.00 |
$33.00 |
| 74 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$382.00 |
$800.00 |
$1,400.00 |
$553.00 |
| 75 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$900.00 |
$1,500.00 |
$1,250.00 |
$955.00 |
| 76 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$3,500.00 |
$2,500.00 |
$5,503.00 |
| 77 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,877 | SY |
$5.00 |
$6.00 |
$2.50 |
$4.49 |
| 78 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$25.00 |
$25.00 |
$33.19 |
| 79 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$120.00 |
$120.00 |
$130.00 |
$134.33 |
| 80 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$270.00 |
$280.00 |
$275.00 |
$312.61 |
| 81 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$150.00 |
$200.00 |
$200.00 |
$209.40 |
| 82 | 504(B) 1305 |
SAW-CUT GROOVING | 347 | SY |
$6.00 |
$8.00 |
$8.00 |
$7.01 |
| 83 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 275 | LF |
$60.00 |
$80.00 |
$100.00 |
$113.71 |
| 84 | 506(A) 1322 |
STRUCTURAL STEEL | 630 | LB |
$3.00 |
$3.00 |
$5.00 |
$1.47 |
| 85 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$725.00 |
$1,000.00 |
$500.00 |
$171.00 |
| 86 | 509(A) 1326 |
CLASS AA CONCRETE | 106 | CY |
$550.00 |
$625.00 |
$970.00 |
$861.00 |
| 87 | 509(B) 1328 |
CLASS A CONCRETE | 42 | CY |
$610.00 |
$650.00 |
$970.00 |
$1,119.00 |
| 88 | 511(A) 1332 |
REINFORCING STEEL | 27,869 | LB |
$1.00 |
$0.9000 |
$1.00 |
$0.8000 |
| 89 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 336 | LF |
$30.00 |
$50.00 |
$35.00 |
$26.57 |
| 90 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 336 | LF |
$12.00 |
$10.00 |
$30.00 |
$72.43 |
| 91 | 514(K) 6260 |
(PL)PILOT HOLES | 280 | LF |
$120.00 |
$80.00 |
$125.00 |
$64.83 |
| 92 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 93 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,216 | TON |
$30.00 |
$35.00 |
$35.00 |
$31.78 |
| 94 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 261 | TON |
$25.00 |
$30.00 |
$25.00 |
$25.63 |
| 95 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$30.00 |
$25.00 |
$17.44 |
| 96 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$30.00 |
$25.00 |
$22.68 |
| 97 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$15,000.00 |
$30,000.00 |
| 98 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,775.00 |
$1,450.00 |
$1,853.00 |
| 99 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$1,825.00 |
$2,350.00 |
$2,434.00 |
| 100 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,840 | LF |
$0.7500 |
$0.6500 |
$0.6500 |
$0.7200 |
| 101 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$1,732.00 |
$1,732.00 |
$1,916.00 |