Bid tab 160424

Let Nov 17, 2016 · Division 3 · Okfuskee Sign up free

‹ Nov 2016 results

BRIDGE AND APPROACHES SH -48: OVER I-40, 1.8 MILES SOUTH OF THE SH -56 JUNCTION NEAR OKEMAH. PROJECT LENGTH = 0.290 MILE

Let date
Thursday, November 17, 2016
Contract
160424
J/P numbers
27055(04)
District
Division 3
County
Okfuskee
Highway
Limits
BRIDGE AND APPROACHES SH -48: OVER I-40, 1.8 MILES SOUTH OF THE SH -56 JUNCTION NEAR OKEMAH. PROJECT LENGTH = 0.290 MILE
Project number
NHPPI-4000-(032)SS

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$5,659,446
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $5,778,393 +2.1%
2 OBC, INC. $5,931,039 +4.8% +2.6%
3 MANHATTAN ROAD & BRIDGE COMPANY, LLC $6,095,567 +7.7% +5.5%
4 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $6,264,061 +10.7% +8.4%

Bid tab: unit prices 111 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 OBC, INC.#3 MANHATTAN ROAD …#4 FRONTIER BRIDGE…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $15,909.00 $20,000.00 $125,000.00 $132,500.00
2202(A) 0183 UNCLASSIFIED EXCAVATION37,842CY $5.50 $8.45 $10.16 $10.00 $6.47
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $95,000.00 $64,854.53 $39,717.86 $20,000.00 $71,868.00
4221(C) 2801 TEMPORARY SILT FENCE2,660LF $1.50 $3.22 $1.16 $1.25 $1.16
5221(K) 0600 TEMPORARY FIBER LOG21,302LF $4.00 $4.10 $3.57 $3.50 $3.55
6229 4318 DITCH LINER PROTECTION5,811LF $1.75 $0.3800 $0.3300 $0.3300 $0.3300
7230(A) 2806 SOLID SLAB SODDING84,111SY $1.40 $1.33 $1.16 $1.10 $1.16
8230(F) 2812 WATERING3,365KGAL $4.00 $1.22 $1.07 $1.05 $1.06
9233(A) 2817 VEGETATIVE MULCHING17.38AC $350.00 $483.44 $420.67 $400.00 $418.70
10234(A) 2824 FERTILIZING (10-20-10)9TON $630.00 $605.83 $527.18 $500.00 $524.70
11241 2832 MOWING34.76AC $70.00 $108.92 $94.79 $90.00 $94.34
12303(A) 2100 AGGREGATE BASE TYPE A11,864CY $45.00 $58.54 $60.40 $57.00 $64.03
13307(K) 4300 STABILIZED SUBGRADE36,319SY $4.75 $4.48 $3.76 $6.70 $4.74
14325 5271 SEPARATOR FABRIC36,673SY $1.50 $4.26 $1.67 $3.85 $3.89
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E4,896TON $35.00 $28.00 $30.97 $30.00 $33.08
16407(B) 0250 TACK COAT1,176GAL $3.00 $6.06 $3.50 $3.65 $3.71
17408 5774 PRIME COAT20,704GAL $5.00 $5.00 $0.2500 $5.01 $5.30
18411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)4,952TON $75.00 $96.93 $69.25 $72.00 $73.41
19411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,068TON $85.00 $106.11 $74.15 $77.00 $78.60
20414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)798SY $9.00 $19.34 $11.93 $25.00 $41.34
21414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )3,297SY $13.00 $22.30 $15.74 $28.00 $38.16
22414(G) 5275 P.C. CONCRETE FOR PAVEMENT1,610CY $105.00 $151.61 $176.48 $175.00 $177.02
23501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED5CY $30.00 $91.79 $75.23 $65.00 $106.00
24509(A) 0319 CLASS AA CONCRETE27CY $650.00 $550.76 $624.02 $550.00 $786.49
25509(D) 0325 CLASS C CONCRETE350CY $275.00 $275.00 $331.42 $200.00 $326.34
26511(A) 0332 REINFORCING STEEL4,097LB $1.00 $0.5900 $1.61 $1.00 $1.12
27525(C) 1000 (SP)NEST PREVENTION1LSUM $4,000.00 $2,400.00 $10,658.35 $500.00 $2,120.00
28609(A) 0288 CONCRETE CURB (6" MNTBLE-INTEGRAL)181LF $6.00 $1.78 $28.65 $8.00 $31.80
29610(B) 0604 6" CONCRETE DRIVEWAY587SY $65.00 $47.31 $52.14 $85.00 $78.44
30610(C) 0608 4" CONCRETE DIVIDING STRIP813SY $55.00 $29.22 $48.23 $45.00 $42.40
31613(A) 0492 24" R.C.PIPE CLASS III24LF $56.00 $115.26 $53.83 $50.00 $64.48
32613(A) 0493 30" R.C.PIPE CLASS III388LF $70.00 $113.80 $68.89 $75.00 $77.55
33613(B) 0689 18" CORR. GALV. STEEL PIPE42LF $35.00 $74.45 $30.75 $31.00 $25.05
34613(B) 0690 24" CORR. GALV. STEEL PIPE16LF $40.00 $78.87 $39.22 $34.00 $28.29
35613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH100LF $36.50 $44.01 $31.14 $28.00 $26.17
36613(L) 4504 21" X 15" PREFAB. CULVERT END SECTION, ARCH4EA $280.00 $103.54 $466.26 $190.00 $169.18
37613(M) 7187 TYPE B4 CULVERT END TREATMENT2EA $1,200.00 $991.79 $2,119.39 $870.00 $1,324.19
38613(M) 7188 TYPE C4 CULVERT END TREATMENT3EA $1,600.00 $1,518.91 $2,150.62 $1,000.00 $1,856.42
39613(M) 7198 TYPE C6 CULVERT END TREATMENT1EA $2,390.00 $1,702.41 $2,556.29 $1,176.00 $2,225.94
40613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C233CY $30.00 $10.00 $113.73 $40.00 $37.26
41613(V) 1180 TRENCH EXCAVATION736CY $7.00 $5.00 $8.06 $4.00 $7.42
42619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $9,258.78 $12,000.00 $7,500.00 $27,068.16
43619(B) 0291 REMOVAL OF HEADWALL2EA $1,500.00 $1,346.29 $2,629.98 $1,050.00 $1,060.00
44619(B) 4727 REMOVAL OF CONCRETE PAVEMENT4,480SY $5.25 $6.13 $5.00 $6.00 $6.36
45619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,026SY $3.50 $2.45 $1.65 $3.50 $5.30
46619(B) 4780 REMOVAL OF GUARDRAIL1,420LF $4.00 $4.90 $1.53 $2.50 $2.12
47619(C) 0924 SAWING PAVEMENT16,491LF $3.50 $2.56 $2.95 $3.00 $4.24
48623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE275LF $18.00 $18.97 $16.51 $16.00 $21.20
49623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,300.00 $2,631.38 $2,289.75 $2,225.00 $2,544.00
50623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,897.04 $1,650.75 $2,550.00 $1,855.00
51501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON87CY $30.00 $23.63 $34.36 $65.00 $27.50
52501(G) 6309 CLSM BACKFILL136CY $160.00 $190.51 $168.18 $130.00 $166.36
53504(A) 1304 APPROACH SLAB280SY $190.00 $190.63 $141.49 $140.00 $208.92
54504(B) 1305 SAW-CUT GROOVING1,463SY $5.00 $3.67 $3.20 $3.10 $3.30
55504(D) 6245 CONCRETE RAIL (TR4)657.3LF $100.00 $88.09 $76.28 $55.00 $83.10
56506(A) 1322 STRUCTURAL STEEL269,130LB $2.10 $1.75 $2.76 $2.00 $2.04
57507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $800.00 $225.90 $129.52 $250.00 $469.59
58507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY30EA $1,800.00 $1,177.19 $942.40 $1,500.00 $1,303.64
59507(C) 6282 ELASTOMERIC BEARING PADS30EA $700.00 $265.32 $229.75 $350.00 $402.30
60509(A) 1326 CLASS AA CONCRETE309.9CY $750.00 $739.17 $650.00 $600.00 $486.17
61509(B) 1328 CLASS A CONCRETE207.2CY $700.00 $769.82 $700.00 $1,000.00 $777.67
62509(D) 1331 CLASS C CONCRETE16CY $600.00 $420.49 $808.21 $495.00 $471.56
63510(C) 6135 SLOPE WALL (5")726SY $130.00 $63.34 $108.02 $150.00 $85.02
64511(A) 1332 REINFORCING STEEL1,030LB $1.10 $0.6700 $2.01 $1.50 $1.48
65511(B) 6010 EPOXY COATED REINFORCING STEEL112,530LB $1.20 $0.8200 $1.10 $1.00 $1.08
66514(A) 6010 PILES, FURNISHED (HP 10X42)950LF $36.00 $22.49 $20.54 $31.00 $26.58
67514(B) 6292 PILES, DRIVEN (HP 10X42)950LF $20.00 $15.71 $20.72 $10.00 $13.20
68514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
69515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)833SY $4.00 $3.67 $3.20 $3.10 $3.30
70516(A) 6094 DRILLED SHAFTS 48" DIAMETER807LF $640.00 $705.71 $717.83 $800.00 $777.66
71516(C) 6200 CROSSHOLE SONIC LOGGING9EA $3,500.00 $4,038.86 $3,514.50 $2,000.00 $3,410.00
72523(A) 6550 SEALER CRACK PREPARATION245LF $5.00 $4.28 $3.73 $3.65 $3.85
73523(B) 6560 SEALER RESIN2.5GAL $150.00 $122.39 $106.50 $105.00 $110.00
74613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND180LF $36.00 $28.22 $49.89 $20.00 $29.25
75613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.46LF $36.00 $10.49 $36.65 $20.00 $24.85
76613(Q) 5946 OUTLET LATERAL HEADWALL2EA $800.00 $390.57 $1,956.94 $275.00 $1,100.00
77619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $100,000.00 $70,118.29 $180,602.67 $125,000.00 $184,800.00
78804(B) 2916 REINFORCING STEEL562LB $0.9000 $2.45 $2.13 $2.10 $2.16
79850(A) 8110 SHEET ALUMINUM SIGNS596SF $23.00 $17.14 $14.91 $15.00 $15.12
80850(B) 8112 EXTRUDED ALUMINUM PANEL SIGNS75SF $30.00 $36.72 $31.95 $31.00 $32.40
81851(A) 3207 6"@15 GALV.STEEL WIDE FLANGE BEAM POST52LF $30.00 $67.32 $58.58 $57.00 $59.40
82851(C) 8330 2 1/2" SQUARE TUBE POST563LF $10.25 $12.24 $10.65 $10.50 $10.80
83853 9024 DELINEATORS(TYPE 1, CODE 1)92EA $30.00 $24.48 $21.30 $21.00 $21.60
84853 9027 DELINEATORS(TYPE 1, CODE 2)50EA $30.00 $26.93 $23.43 $23.00 $23.76
85853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)14EA $10.00 $24.48 $21.30 $21.00 $21.60
86856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)5,040LF $0.6000 $0.4900 $0.4300 $0.4500 $0.0400
87856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)15,285LF $0.7000 $1.10 $0.9600 $0.9500 $0.9700
88856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)5,420LF $2.00 $1.22 $1.07 $1.05 $1.08
89856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)4,336LF $8.00 $1.84 $1.60 $1.60 $1.62
90870(A) 8011 SAND FILLED IMPACT ATTENUATION MODULE38EA $400.00 $336.57 $292.88 $285.00 $297.00
91857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)5,406LF $0.1500 $0.3100 $0.2700 $0.2700 $0.2700
92857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-23,394EA $0.5000 $1.22 $1.07 $1.05 $1.08
93857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)26,116LF $0.2500 $0.2400 $0.2100 $0.2200 $0.2200
94871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,102SD $11.00 $3.06 $2.66 $2.60 $2.70
95877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER5,060LF $20.25 $17.56 $9.52 $20.00 $27.00
96877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,375LF $4.00 $4.72 $1.78 $2.00 $3.24
97880(A) 8812 ARROW DISPLAY(TYPE C)296SD $7.50 $1.22 $1.07 $1.05 $1.08
98880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF38,836SD $0.3500 $0.0600 $0.0500 $0.0600 $0.0500
99880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF16,916SD $0.6500 $0.0600 $0.0500 $0.0600 $0.0500
100880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,032SD $1.50 $0.1200 $0.1100 $0.1100 $0.1100
101880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)5,424SD $0.9000 $0.1200 $0.1100 $0.1100 $0.1100
102880(C) 8848 WING BARRICADES856SD $1.30 $0.1200 $0.1100 $0.1100 $0.1100
103880(E) 8860 WARNING LIGHTS(TYPE A)2,912SD $0.3000 $6.12 $5.33 $5.20 $5.40
104880(F) 8878 DRUMS34,644SD $0.2500 $0.0600 $0.0500 $0.0600 $0.0500
105880(G) 8890 CHANNELIZER CONES8,255SD $0.3000 $0.0600 $0.0500 $0.0600 $0.0500
106880(L) 8911 TRAFFIC SURVEILLANCE, POLICE900HOUR $75.00 $75.00 $102.65 $67.50 $70.20
107882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,200SD $10.75 $6.12 $5.33 $5.20 $5.40
108642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $55,000.00 $42,958.80 $51,665.01 $42,500.00 $19,656.00
109220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $2,500.00 $660.36 $1,759.00 $4,950.00
110640(A) 1398 FIELD OFFICE1EA $15,000.00 $3,000.00 $38,117.07 $5,500.00 $19,800.00
111641 1399 MOBILIZATION1LSUM $290,000.00 $231,130.20 $290,000.00 $305,000.00 $314,753.16