| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$150,000.00 |
$100,000.00 |
$150,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 122,526.22 | CY |
$7.00 |
$6.97 |
$7.25 |
$7.60 |
| 3 | 202(B) 0105 |
MUCK EXCAVATION | 456.3 | CY |
$15.00 |
$30.00 |
$150.00 |
$25.75 |
| 4 | 202(C) 0182 |
ROCK EXCAVATION | 7,100 | CY |
$15.00 |
$11.74 |
$12.00 |
$15.75 |
| 5 | 202(D) 0184 |
UNCLASSIFIED BORROW | 76,184.06 | CY |
$7.50 |
$8.27 |
$8.50 |
$8.86 |
| 6 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$45,497.79 |
$75,000.00 |
$250,000.00 |
| 7 | 221(C) 2801 |
TEMPORARY SILT FENCE | 34,716 | LF |
$2.00 |
$1.03 |
$2.00 |
$1.27 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,752 | LF |
$6.00 |
$5.37 |
$7.00 |
$6.88 |
| 9 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 109 | CY |
$100.00 |
$150.00 |
$100.00 |
$93.75 |
| 10 | 221(K) 0600 |
TEMPORARY FIBER LOG | 68,978 | LF |
$2.00 |
$2.13 |
$3.00 |
$2.30 |
| 11 | 229 4318 |
DITCH LINER PROTECTION | 5,291 | LF |
$1.50 |
$0.9500 |
$1.50 |
$1.50 |
| 12 | 230(A) 2806 |
SOLID SLAB SODDING | 60,962.1 | SY |
$1.60 |
$1.36 |
$1.50 |
$1.32 |
| 13 | 232(B) 2814 |
SEEDING METHOD B | 26.58 | AC |
$460.09 |
$278.00 |
$350.00 |
$335.00 |
| 14 | 233(A) 2817 |
VEGETATIVE MULCHING | 65.74 | AC |
$500.00 |
$346.00 |
$350.00 |
$309.00 |
| 15 | 241 2832 |
MOWING | 78.32 | AC |
$75.00 |
$60.00 |
$80.00 |
$82.50 |
| 16 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 3 | EA |
$1,500.00 |
$5,000.00 |
$7,500.00 |
$9,000.00 |
| 17 | 310(B) 0149 |
SUBGRADE, METHOD B | 57,536 | SY |
$1.50 |
$0.7300 |
$0.7500 |
$0.7500 |
| 18 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 800 | SY |
$5.00 |
$5.38 |
$5.50 |
$5.15 |
| 19 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,299 | TON |
$30.00 |
$39.53 |
$50.00 |
$40.75 |
| 20 | 407(B) 0250 |
TACK COAT | 31,931.5 | GAL |
$4.00 |
$2.70 |
$2.25 |
$3.25 |
| 21 | 408 5774 |
PRIME COAT | 26,727.2 | GAL |
$3.00 |
$4.00 |
$3.50 |
$3.85 |
| 22 | 409(A) 4242 |
FABRIC REINFORCEMENT | 22,506 | SY |
$2.50 |
$1.80 |
$1.50 |
$1.10 |
| 23 | 409(B) 4268 |
BITUMINOUS BINDER | 5,064 | GAL |
$3.25 |
$3.00 |
$2.25 |
$4.70 |
| 24 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 11,740.9 | TON |
$80.00 |
$92.00 |
$84.50 |
$93.30 |
| 25 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 36,138.5 | TON |
$70.00 |
$87.00 |
$77.50 |
$86.75 |
| 26 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,819.9 | TON |
$90.00 |
$102.00 |
$92.50 |
$111.45 |
| 27 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,737.2 | TON |
$80.00 |
$90.00 |
$82.50 |
$96.15 |
| 28 | 411(G) 6150 |
RICH BOTTOM LAYER | 8,481.8 | TON |
$80.00 |
$110.00 |
$90.50 |
$110.25 |
| 29 | 412 5267 |
COLD MILLING PAVEMENT | 21,810.2 | SY |
$2.75 |
$2.00 |
$4.50 |
$3.80 |
| 30 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 148.94 | CY |
$15.00 |
$30.00 |
$35.00 |
$12.36 |
| 31 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 182.08 | CY |
$12.00 |
$22.25 |
$20.00 |
$20.60 |
| 32 | 501(G) 6315 |
CLSM BACKFILL | 1,345 | CY |
$150.00 |
$200.00 |
$225.00 |
$206.00 |
| 33 | 509(A) 0319 |
CLASS AA CONCRETE | 878.36 | CY |
$550.00 |
$460.00 |
$626.00 |
$341.80 |
| 34 | 509(D) 0325 |
CLASS C CONCRETE | 1,020.4 | CY |
$250.00 |
$270.00 |
$350.00 |
$206.00 |
| 35 | 511(A) 0332 |
REINFORCING STEEL | 129,253.71 | LB |
$0.9500 |
$0.9500 |
$0.9500 |
$0.8200 |
| 36 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 833.43 | TON |
$50.00 |
$57.33 |
$60.00 |
$59.05 |
| 37 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 395.37 | TON |
$40.00 |
$45.62 |
$50.00 |
$47.00 |
| 38 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 779.89 | SY |
$3.00 |
$4.67 |
$4.75 |
$4.80 |
| 39 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,000.00 |
$4,959.71 |
$5,000.00 |
$2,100.00 |
| 40 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 332.8 | LF |
$70.00 |
$60.64 |
$66.00 |
$62.50 |
| 41 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 120.2 | LF |
$90.00 |
$94.87 |
$100.00 |
$97.75 |
| 42 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 39 | LF |
$150.00 |
$128.42 |
$145.00 |
$132.30 |
| 43 | 613(A) 0585 |
36" R.C.PIPE CLASS IV | 71 | LF |
$100.00 |
$104.45 |
$120.00 |
$107.60 |
| 44 | 613(A) 0587 |
48" R.C.PIPE CLASS IV | 74 | LF |
$175.00 |
$145.35 |
$160.00 |
$150.00 |
| 45 | 613(A) 0599 |
48" R.C.PIPE CLASS V | 130 | LF |
$200.00 |
$160.46 |
$175.00 |
$165.00 |
| 46 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 629 | LF |
$30.00 |
$39.46 |
$45.00 |
$40.65 |
| 47 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 328 | LF |
$35.00 |
$70.33 |
$78.00 |
$72.45 |
| 48 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 108 | LF |
$40.00 |
$50.44 |
$55.00 |
$52.00 |
| 49 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 327 | LF |
$70.00 |
$64.48 |
$70.00 |
$66.45 |
| 50 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$700.00 |
$853.69 |
$950.00 |
$880.00 |
| 51 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,300.00 |
$1,229.55 |
$1,350.00 |
$1,266.50 |
| 52 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 12 | EA |
$2,000.00 |
$1,813.64 |
$2,000.00 |
$1,868.00 |
| 53 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 12 | EA |
$350.00 |
$219.53 |
$240.00 |
$226.00 |
| 54 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 10 | EA |
$400.00 |
$268.77 |
$300.00 |
$277.00 |
| 55 | 613(W) 4500 |
24" JACKED CONDUIT | 94 | LF |
$600.00 |
$350.00 |
$400.00 |
$645.00 |
| 56 | 613(W) 4504 |
36" JACKED CONDUIT | 297.2 | LF |
$700.00 |
$770.00 |
$800.00 |
$895.00 |
| 57 | 613(W) 4508 |
48" JACKED CONDUIT | 893.1 | LF |
$800.00 |
$920.00 |
$1,000.00 |
$1,245.00 |
| 58 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$21,281.21 |
$50,000.00 |
$50,000.00 |
| 59 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 25,909 | SY |
$3.50 |
$5.00 |
$7.00 |
$3.80 |
| 60 | 619(C) 0924 |
SAWING PAVEMENT | 25,962 | LF |
$3.00 |
$3.50 |
$3.00 |
$6.20 |
| 61 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 25,267.5 | LF |
$4.50 |
$3.36 |
$5.40 |
$3.46 |
| 62 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$39,750.00 |
$10,000.00 |
$5,150.00 |
| 63 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,257.7 | CY |
$8.00 |
$10.00 |
$2.00 |
$5.70 |
| 64 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 315 | CY |
$15.00 |
$25.00 |
$35.00 |
$12.35 |
| 65 | 509(A) 1326 |
CLASS AA CONCRETE | 562.7 | CY |
$550.00 |
$440.00 |
$536.00 |
$346.00 |
| 66 | 511(A) 1332 |
REINFORCING STEEL | 86,013 | LB |
$0.9500 |
$0.9000 |
$0.9500 |
$0.8200 |
| 67 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$10,000.00 |
$15,000.00 |
| 68 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 17 | EA |
$50.00 |
$100.00 |
$100.00 |
$103.00 |
| 69 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$150.00 |
$200.00 |
$200.00 |
$257.50 |
| 70 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 96.43 | SF |
$25.00 |
$18.00 |
$18.00 |
$20.60 |
| 71 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 324 | LF |
$12.00 |
$15.00 |
$15.00 |
$10.30 |
| 72 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 58,338 | LF |
$0.5000 |
$1.00 |
$1.00 |
$0.9000 |
| 73 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,100 | LF |
$2.00 |
$3.00 |
$3.00 |
$4.12 |
| 74 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 2 | EA |
$200.00 |
$200.00 |
$200.00 |
$128.75 |
| 75 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 251,526 | LF |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1700 |
| 76 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 93,813 | LF |
$0.7500 |
$0.5000 |
$0.5000 |
$0.3100 |
| 77 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 118,250 | LF |
$0.2000 |
$0.1000 |
$0.1000 |
$0.2100 |
| 78 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,570 | SD |
$8.00 |
$10.00 |
$10.00 |
$13.00 |
| 79 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 11,788 | LF |
$20.00 |
$19.00 |
$25.00 |
$23.20 |
| 80 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 21,506 | LF |
$3.00 |
$2.95 |
$2.95 |
$3.10 |
| 81 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 525 | SD |
$5.00 |
$5.00 |
$5.00 |
$30.00 |
| 82 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,575 | SD |
$0.1500 |
$0.5000 |
$0.5000 |
$0.7600 |
| 83 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 19,435 | SD |
$0.7500 |
$1.50 |
$1.50 |
$1.57 |
| 84 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,060 | SD |
$1.25 |
$3.00 |
$3.00 |
$5.00 |
| 85 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,490 | SD |
$0.3000 |
$3.00 |
$3.00 |
$2.40 |
| 86 | 880(C) 8848 |
WING BARRICADES | 2,100 | SD |
$0.2000 |
$3.00 |
$3.00 |
$1.05 |
| 87 | 880(D) 8854 |
VERTICAL PANELS | 11,774 | SD |
$0.1500 |
$0.3500 |
$0.3500 |
$0.3000 |
| 88 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 23,590 | SD |
$0.1500 |
$0.1000 |
$0.1000 |
$0.3000 |
| 89 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 11,774 | SD |
$0.1000 |
$0.1000 |
$0.1000 |
$0.3000 |
| 90 | 880(F) 8878 |
DRUMS | 109,181 | SD |
$0.1000 |
$0.3500 |
$0.3500 |
$0.1000 |
| 91 | 880(I) 8902 |
FLAGGER | 125 | SD |
$100.00 |
$200.00 |
$1,500.00 |
$103.00 |
| 92 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 250 | SD |
$35.00 |
$85.00 |
$85.00 |
$15.45 |
| 93 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 46,300 | LF |
$0.3000 |
$0.0400 |
$0.2500 |
$0.2500 |
| 94 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$163,909.00 |
$81,050.00 |
$135,000.00 |
$100,000.00 |
| 95 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$17,000.00 |
$35,000.00 |
$50,000.00 |
| 96 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$532,951.00 |
$605,000.00 |
$625,000.00 |
$600,000.00 |
| 97 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$22,500.00 |
$80,000.00 |
$125,000.00 |
$75,000.00 |