| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 58,855 | CY |
$8.00 |
$1.45 |
$21.00 |
$5.60 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,203 | CY |
$10.00 |
$21.00 |
$26.00 |
$9.15 |
| 3 | 221(K) 0600 |
TEMPORARY FIBER LOG | 61,590 | LF |
$3.50 |
$2.95 |
$1.25 |
$3.55 |
| 4 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 51,705 | CY |
$48.00 |
$63.60 |
$53.00 |
$54.50 |
| 5 | 307(K) 4300 |
STABILIZED SUBGRADE | 183,276 | SY |
$6.00 |
$4.35 |
$6.00 |
$5.10 |
| 6 | 325 5271 |
SEPARATOR FABRIC | 199,593 | SY |
$1.00 |
$0.9500 |
$1.09 |
$1.45 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 52,867 | TON |
$22.00 |
$27.80 |
$26.77 |
$34.40 |
| 8 | 407(B) 0250 |
TACK COAT | 41,616 | GAL |
$3.00 |
$3.15 |
$2.50 |
$3.30 |
| 9 | 408 5774 |
PRIME COAT | 115,301 | GAL |
$3.50 |
$6.25 |
$2.00 |
$4.15 |
| 10 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 13,968 | TON |
$75.00 |
$73.50 |
$76.00 |
$78.95 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 59,933 | TON |
$70.00 |
$64.60 |
$67.00 |
$69.95 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,985 | TON |
$75.00 |
$70.70 |
$80.00 |
$77.40 |
| 13 | 411(F) 6100 |
STONE MATRIX ASPHALT | 9,231 | TON |
$95.00 |
$105.00 |
$106.00 |
$116.05 |
| 14 | 411(G) 6150 |
RICH BOTTOM LAYER | 22,432 | TON |
$75.00 |
$81.30 |
$86.00 |
$91.00 |
| 15 | 412 5267 |
COLD MILLING PAVEMENT | 24,260 | SY |
$2.00 |
$2.45 |
$7.45 |
$2.70 |
| 16 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 24,260 | SY |
$25.00 |
$12.50 |
$20.25 |
$17.65 |
| 17 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 4,044 | CY |
$170.00 |
$146.50 |
$179.90 |
$168.75 |
| 18 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,840 | LF |
$50.00 |
$28.60 |
$35.00 |
$39.75 |
| 19 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 8 | EA |
$1,050.00 |
$1,163.00 |
$1,775.00 |
$1,700.15 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 144,498 | SY |
$4.00 |
$4.10 |
$5.40 |
$3.40 |
| 21 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,378 | LF |
$4.00 |
$4.50 |
$2.00 |
$4.40 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 3,748 | LF |
$6.00 |
$2.65 |
$5.00 |
$3.05 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,907 | LF |
$20.00 |
$17.60 |
$20.20 |
$17.10 |
| 24 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 4 | EA |
$825.00 |
$1,152.00 |
$810.00 |
$1,116.50 |
| 25 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,500.00 |
$3,116.00 |
$2,505.00 |
$3,020.00 |
| 26 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$3,011.00 |
$1,705.00 |
$2,920.00 |
| 27 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 92 | EA |
$15.00 |
$13.60 |
$10.00 |
$13.20 |
| 28 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,000 | LF |
$0.1500 |
$0.3700 |
$0.3500 |
$0.8000 |
| 29 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 169,448 | LF |
$0.9000 |
$0.4200 |
$0.4000 |
$1.11 |
| 30 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 4,078 | EA |
$1.50 |
$0.5200 |
$0.5000 |
$0.7500 |
| 31 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 156,533 | LF |
$0.1500 |
$0.0100 |
$0.0100 |
$0.1200 |
| 32 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 660 | SD |
$15.00 |
$15.70 |
$15.80 |
$6.10 |
| 33 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 35,750 | LF |
$25.00 |
$18.90 |
$25.00 |
$32.00 |
| 34 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 39,000 | LF |
$3.00 |
$2.50 |
$3.80 |
$1.00 |
| 35 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 30,960 | SD |
$0.1000 |
$0.2600 |
$0.2500 |
$0.0500 |
| 36 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 660 | SD |
$6.00 |
$5.25 |
$5.30 |
$1.05 |
| 37 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,000 | SD |
$0.3500 |
$0.8900 |
$0.9000 |
$0.2500 |
| 38 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,600 | SD |
$0.5500 |
$1.55 |
$1.58 |
$0.2500 |
| 39 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,800 | SD |
$1.45 |
$2.10 |
$2.11 |
$1.55 |
| 40 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 11,280 | SD |
$0.7500 |
$0.3700 |
$0.3700 |
$0.0500 |
| 41 | 880(C) 8848 |
WING BARRICADES | 1,040 | SD |
$1.75 |
$3.15 |
$3.16 |
$0.5500 |
| 42 | 880(D) 8854 |
VERTICAL PANELS | 25,440 | SD |
$0.1500 |
$0.1000 |
$0.1100 |
$0.6500 |
| 43 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 26,880 | SD |
$0.3500 |
$0.2600 |
$0.2700 |
$0.2000 |
| 44 | 880(F) 8878 |
DRUMS | 32,400 | SD |
$0.2000 |
$0.3700 |
$0.3700 |
$0.0500 |
| 45 | 880(G) 8890 |
CHANNELIZER CONES | 8,640 | SD |
$0.3000 |
$0.6800 |
$0.6900 |
$0.0500 |
| 46 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 2,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 47 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 5,280 | SD |
$20.00 |
$8.40 |
$8.50 |
$12.20 |
| 48 | 882 8384 |
(SP) LITE SMART WORKZONE SYSTEM-PTS | 5,280 | SD |
$5.00 |
$3.15 |
$3.20 |
$12.20 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 576 | SD |
$15.00 |
$8.40 |
$8.00 |
$8.15 |
| 50 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 133,600 | LF |
$0.1500 |
$0.0900 |
$0.0700 |
$0.1000 |
| 51 | 804(A) 2915 |
STRUCTURAL CONCRETE | 4.74 | CY |
$567.05 |
$262.00 |
$250.00 |
$355.25 |
| 52 | 804(B) 2916 |
REINFORCING STEEL | 1,158 | LB |
$1.50 |
$2.10 |
$2.00 |
$2.30 |
| 53 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$125.00 |
$104.50 |
$100.00 |
$86.30 |
| 54 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 17 | EA |
$217.10 |
$209.50 |
$200.00 |
$187.80 |
| 55 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 50 | SF |
$22.85 |
$18.90 |
$18.00 |
$48.75 |
| 56 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 444 | SF |
$15.55 |
$25.10 |
$24.00 |
$24.40 |
| 57 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 102.5 | LF |
$13.25 |
$47.10 |
$45.00 |
$28.45 |
| 58 | 851(A) 3210 |
8"@31 GALV.STEEL WIDE FLANGE BEAM POST | 64 | LF |
$36.45 |
$576.00 |
$55.00 |
$32.50 |
| 59 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 30 | LF |
$9.90 |
$10.50 |
$10.00 |
$6.10 |
| 60 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 133,600 | LF |
$0.6000 |
$0.5000 |
$0.4800 |
$0.5000 |
| 61 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,730 | LF |
$1.20 |
$2.10 |
$2.00 |
$0.9000 |
| 62 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,300 | LF |
$2.45 |
$3.15 |
$3.00 |
$1.55 |
| 63 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 17,290 | LF |
$1.75 |
$1.55 |
$1.50 |
$1.60 |
| 64 | 509(A) 0319 |
CLASS AA CONCRETE | 48.15 | CY |
$400.00 |
$523.50 |
$362.00 |
$507.50 |
| 65 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 3,162 | LF |
$3.50 |
$4.20 |
$7.35 |
$4.05 |
| 66 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 3,162 | LF |
$25.00 |
$4.95 |
$10.85 |
$4.80 |
| 67 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$2,000.00 |
$5,237.00 |
$1,410.00 |
$5,075.00 |
| 68 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$261,795.00 |
$81,215.00 |
$47,395.00 |
$84,500.00 |
| 69 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$3,666.00 |
$7,500.00 |
$12,180.00 |
| 70 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,000.00 |
$5,237.00 |
$18,000.00 |
$7,105.00 |
| 71 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$542,443.00 |
$480,106.44 |
$896,000.00 |
|