| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$11,200.00 |
$11,250.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 295 | CY |
$7.00 |
$10.00 |
$22.40 |
$22.50 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 28,367 | CY |
$8.00 |
$6.00 |
$10.36 |
$10.40 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$8,960.00 |
$9,000.00 |
$50,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,575 | LF |
$2.00 |
$1.45 |
$1.46 |
$1.43 |
$1.50 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 360 | CY |
$70.00 |
$75.00 |
$67.20 |
$102.95 |
$50.00 |
| 7 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 40 | CY |
$110.00 |
$100.00 |
$84.00 |
$131.05 |
$50.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 3,270 | LF |
$4.00 |
$2.50 |
$2.52 |
$2.79 |
$3.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 16,340 | SY |
$2.00 |
$1.43 |
$1.46 |
$1.55 |
$1.70 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.4 | AC |
$650.00 |
$1,100.00 |
$1,120.00 |
$1,026.00 |
$1,000.00 |
| 11 | 241 2832 |
MOWING | 4 | AC |
$200.00 |
$110.00 |
$112.00 |
$126.00 |
$130.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 218 | TON |
$40.00 |
$23.00 |
$19.97 |
$20.60 |
$25.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,545 | GAL |
$4.00 |
$4.95 |
$5.04 |
$3.10 |
$4.00 |
| 14 | 408 5774 |
PRIME COAT | 2,332 | GAL |
$8.00 |
$8.25 |
$8.40 |
$9.30 |
$10.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,699 | TON |
$80.00 |
$102.00 |
$100.80 |
$93.00 |
$100.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 728 | TON |
$95.00 |
$132.00 |
$123.20 |
$107.60 |
$108.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 105 | CY |
$25.00 |
$15.00 |
$16.80 |
$61.50 |
$15.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 303.73 | CY |
$550.00 |
$425.00 |
$465.36 |
$463.90 |
$460.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 44,430 | LB |
$0.9000 |
$1.00 |
$1.14 |
$1.10 |
$1.00 |
| 20 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 257 | TON |
$45.00 |
$30.00 |
$34.72 |
$44.40 |
$34.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$6,720.00 |
$6,750.00 |
$85,000.00 |
| 22 | 619(B) 4725 |
REMOVAL OF FENCE | 110 | LF |
$3.00 |
$1.00 |
$4.48 |
$4.50 |
$2.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,907 | SY |
$7.00 |
$8.50 |
$8.40 |
$11.10 |
$12.00 |
| 24 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,602 | LF |
$2.00 |
$1.50 |
$1.40 |
$5.35 |
$4.00 |
| 25 | 619(C) 0924 |
SAWING PAVEMENT | 60 | LF |
$10.00 |
$5.00 |
$5.60 |
$22.50 |
$8.00 |
| 26 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 303 | LF |
$20.00 |
$18.15 |
$18.48 |
$18.60 |
$20.00 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,400.00 |
$2,408.00 |
$2,418.75 |
$2,800.00 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,540.00 |
$1,568.00 |
$1,575.00 |
$2,500.00 |
| 29 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 850 | LF |
$10.00 |
$7.00 |
$6.72 |
$13.05 |
$14.00 |
| 30 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$750.00 |
$800.00 |
$896.00 |
$900.00 |
$1,200.00 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 85 | CY |
$20.00 |
$20.00 |
$13.44 |
$24.50 |
$15.00 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 182 | CY |
$200.00 |
$150.00 |
$142.13 |
$168.95 |
$130.00 |
| 33 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 199 | LF |
$200.00 |
$205.00 |
$213.74 |
$227.65 |
$200.00 |
| 34 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 798 | LF |
$225.00 |
$210.00 |
$268.23 |
$233.55 |
$220.00 |
| 35 | 504(A) 1304 |
APPROACH SLAB | 225 | SY |
$170.00 |
$175.00 |
$177.35 |
$203.20 |
$140.00 |
| 36 | 504(B) 1305 |
SAW-CUT GROOVING | 1,336 | SY |
$6.00 |
$4.00 |
$4.03 |
$4.75 |
$5.00 |
| 37 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 597 | LF |
$80.00 |
$70.00 |
$91.34 |
$116.20 |
$75.00 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$5.00 |
$3.00 |
$4.27 |
$7.75 |
$3.00 |
| 39 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$700.00 |
$500.00 |
$494.76 |
$786.25 |
$600.00 |
| 40 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$3,000.00 |
$2,500.00 |
$1,881.64 |
$2,060.00 |
$1,600.00 |
| 41 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$500.00 |
$550.00 |
$607.39 |
$710.00 |
$300.00 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 327 | CY |
$550.00 |
$600.00 |
$539.00 |
$535.75 |
$450.00 |
| 43 | 509(B) 1328 |
CLASS A CONCRETE | 109 | CY |
$500.00 |
$600.00 |
$539.00 |
$562.75 |
$480.00 |
| 44 | 509(D) 1331 |
CLASS C CONCRETE | 25 | CY |
$280.00 |
$600.00 |
$466.20 |
$597.25 |
$320.00 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 86,210 | LB |
$1.10 |
$1.00 |
$1.16 |
$1.35 |
$1.30 |
| 46 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,588 | LF |
$35.00 |
$35.00 |
$32.66 |
$34.50 |
$35.00 |
| 47 | 514(A) 6018 |
PILES, FURNISHED (HP 14X117) | 2,156 | LF |
$85.00 |
$63.00 |
$69.94 |
$75.40 |
$70.00 |
| 48 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,588 | LF |
$20.00 |
$15.00 |
$11.20 |
$13.50 |
$35.00 |
| 49 | 514(B) 6299 |
PILES, DRIVEN (HP 14X117) | 2,156 | LF |
$20.00 |
$27.00 |
$11.20 |
$13.75 |
$40.00 |
| 50 | 514(F) 6354 |
PILE LOAD TEST (DYNAMIC) | 22 | EA |
$1,000.00 |
$900.00 |
$739.20 |
$857.50 |
$500.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,103 | SY |
$5.00 |
$3.50 |
$3.92 |
$4.80 |
$4.00 |
| 52 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$6.00 |
$4.40 |
$4.48 |
$5.00 |
$6.00 |
| 53 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$130.00 |
$150.00 |
$112.00 |
$110.00 |
$125.00 |
| 54 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,852 | TON |
$45.00 |
$30.00 |
$35.28 |
$33.75 |
$34.00 |
| 55 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 283 | TON |
$40.00 |
$25.00 |
$30.43 |
$28.50 |
$28.00 |
| 56 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$35.00 |
$25.00 |
$35.53 |
$48.95 |
$25.00 |
| 57 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 72 | LF |
$35.00 |
$25.00 |
$35.53 |
$27.75 |
$25.00 |
| 58 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$75,000.00 |
$95,200.00 |
$117,600.00 |
$125,000.00 |
| 59 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$150.00 |
$112.00 |
$110.00 |
$150.00 |
| 60 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 20.64 | SF |
$17.00 |
$18.00 |
$16.80 |
$16.50 |
$20.00 |
| 61 | 851(C) 8324 |
2" SQUARE TUBE POST | 70 | LF |
$13.00 |
$10.00 |
$8.96 |
$9.00 |
$10.00 |
| 62 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,300 | LF |
$1.00 |
$0.9000 |
$0.9500 |
$0.9500 |
$1.00 |
| 63 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$8,250.00 |
$8,400.00 |
$8,250.00 |
$11,000.00 |
| 64 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$11,000.00 |
$10,808.00 |
$12,000.00 |
$20,000.00 |
| 65 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$2,800.00 |
$4,025.00 |
$3,500.00 |
| 66 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$140,000.00 |
$143,789.53 |
$175,950.00 |
$125,000.00 |