| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 923.15 | CY |
$10.00 |
$24.50 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,755.53 | CY |
$12.00 |
$15.90 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.00 |
$4.65 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 245 | LF |
$8.00 |
$7.50 |
| 5 | 221(K) 0600 |
TEMPORARY FIBER LOG | 168 | LF |
$5.00 |
$2.45 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 47,982.98 | SY |
$1.25 |
$1.15 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.91 | AC |
$220.00 |
$312.85 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 112.53 | CY |
$72.00 |
$90.10 |
| 9 | 307(A) 4200 |
FLY ASH | 3,289.94 | TON |
$66.50 |
$63.65 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 65,276.67 | SY |
$3.20 |
$2.75 |
| 11 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 21,088 | LF |
$5.00 |
$5.40 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 545.18 | TON |
$57.00 |
$53.00 |
| 13 | 407(B) 0250 |
TACK COAT | 2,792.38 | GAL |
$4.00 |
$4.00 |
| 14 | 408 5774 |
PRIME COAT | 21,107.39 | GAL |
$4.80 |
$4.15 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,509.85 | TON |
$70.00 |
$74.75 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,436.89 | TON |
$78.00 |
$82.65 |
| 17 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$1,025.00 |
$715.50 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,137.78 | SY |
$36.00 |
$43.50 |
| 19 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 285.22 | CY |
$144.00 |
$175.25 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 28.5 | CY |
$445.00 |
$662.50 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$650.00 |
$551.50 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 4,309.62 | LB |
$3.30 |
$1.15 |
| 23 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 125.66 | LF |
$70.30 |
$34.00 |
| 24 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 59 | SY |
$74.50 |
$69.00 |
| 25 | 611(G) 5114 |
INLET CI DES. 2 (C) | 1 | EA |
$4,900.00 |
$4,770.00 |
| 26 | 611(L) 0487 |
JUNCTION BOXES | 90.64 | CF |
$102.00 |
$100.70 |
| 27 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 8 | LF |
$96.00 |
$113.50 |
| 28 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 144 | LF |
$145.00 |
$94.50 |
| 29 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 204 | LF |
$155.00 |
$117.50 |
| 30 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 438 | LF |
$180.00 |
$147.50 |
| 31 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 72 | LF |
$228.00 |
$202.00 |
| 32 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 10 | LF |
$30.00 |
$26.50 |
| 33 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 562 | LF |
$40.00 |
$37.00 |
| 34 | 613(EE) 5600 |
(SP) 12" CORRUGATED POLYPROPYLENE PIPE | 29 | LF |
$17.00 |
$33.00 |
| 35 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 662 | LF |
$32.00 |
$42.50 |
| 36 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 60 | LF |
$72.00 |
$99.50 |
| 37 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$944.00 |
$265.00 |
| 38 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$962.00 |
$1,590.00 |
| 39 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,180.00 |
$1,805.00 |
| 40 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 48 | EA |
$1,100.00 |
$905.00 |
| 41 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,525.00 |
$1,378.00 |
| 42 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 10 | EA |
$2,200.00 |
$1,908.00 |
| 43 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$2,250.00 |
$2,120.00 |
| 44 | 619(B) 0291 |
REMOVAL OF HEADWALL | 6 | EA |
$1,006.00 |
$848.00 |
| 45 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 59 | SY |
$19.00 |
$26.50 |
| 46 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1,301 | LF |
$7.70 |
$7.50 |
| 47 | 619(C) 0924 |
SAWING PAVEMENT | 176 | LF |
$13.50 |
$12.50 |
| 48 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 65.34 | SF |
$70.00 |
$44.50 |
| 49 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,965 | LF |
$1.60 |
$1.25 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,500.00 |
$9,000.00 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$35,000.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,800.00 |
$20,000.00 |
| 53 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$145,000.00 |
$168,950.00 |