| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$72,000.00 |
$50,486.00 |
$78,404.70 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,800 | LF |
$1.75 |
$1.85 |
$2.40 |
$1.76 |
$1.71 |
| 3 | 221(K) 0600 |
TEMPORARY FIBER LOG | 780 | LF |
$3.50 |
$7.77 |
$8.00 |
$2.50 |
$2.20 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 9,506 | SY |
$1.75 |
$1.99 |
$2.00 |
$2.25 |
$2.20 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.96 | AC |
$420.00 |
$140.00 |
$128.00 |
$250.00 |
$220.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 835 | CY |
$60.00 |
$94.00 |
$65.00 |
$96.00 |
$94.67 |
| 7 | 407(B) 0250 |
TACK COAT | 237 | GAL |
$5.00 |
$8.80 |
$8.00 |
$9.00 |
$8.80 |
| 8 | 408 5774 |
PRIME COAT | 1,173 | GAL |
$6.50 |
$25.00 |
$23.00 |
$27.00 |
$25.30 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,074 | TON |
$102.00 |
$159.00 |
$118.00 |
$130.00 |
$129.80 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 600 | TON |
$115.00 |
$189.00 |
$124.00 |
$140.00 |
$136.40 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$300.00 |
$500.00 |
$392.50 |
$480.01 |
| 12 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 60 | LF |
$30.00 |
$22.00 |
$35.00 |
$28.00 |
$28.56 |
| 13 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 172 | LF |
$45.00 |
$42.00 |
$50.00 |
$46.00 |
$42.72 |
| 14 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 84 | LF |
$35.00 |
$26.00 |
$40.00 |
$30.00 |
$34.00 |
| 15 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,700.00 |
$1,200.00 |
$1,200.00 |
$1,150.00 |
$1,245.57 |
| 16 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$2,400.00 |
$1,500.00 |
$1,200.00 |
$3,000.00 |
$2,484.11 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$3,000.00 |
$2,500.00 |
$5,250.00 |
$8,250.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,152 | SY |
$4.75 |
$6.50 |
$3.50 |
$5.50 |
$4.51 |
| 19 | 619(C) 0924 |
SAWING PAVEMENT | 48 | LF |
$5.00 |
$5.00 |
$10.00 |
$12.75 |
$5.50 |
| 20 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,753 | LF |
$8.25 |
$4.45 |
$4.05 |
$5.00 |
$4.46 |
| 21 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$19.00 |
$15.00 |
$22.00 |
$9.00 |
$22.00 |
| 22 | 501(G) 6309 |
CLSM BACKFILL | 86 | CY |
$162.00 |
$150.00 |
$225.00 |
$215.00 |
$201.80 |
| 23 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 1,016 | LF |
$285.00 |
$213.00 |
$250.00 |
$221.00 |
$248.46 |
| 24 | 504(B) 1305 |
SAW-CUT GROOVING | 829.4 | SY |
$6.25 |
$4.60 |
$5.00 |
$5.00 |
$4.62 |
| 25 | 504(C) 6250 |
SEALED EXPANSION JOINT | 87.51 | LF |
$310.00 |
$260.00 |
$265.00 |
$285.00 |
$297.44 |
| 26 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 741.2 | LF |
$72.00 |
$70.00 |
$70.00 |
$82.00 |
$96.79 |
| 27 | 506(A) 1322 |
STRUCTURAL STEEL | 1,160 | LB |
$2.10 |
$2.00 |
$4.00 |
$2.50 |
$4.29 |
| 28 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$850.00 |
$600.00 |
$870.00 |
$835.00 |
$1,087.72 |
| 29 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$850.00 |
$600.00 |
$870.00 |
$835.00 |
$1,087.72 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 258.6 | CY |
$540.00 |
$650.00 |
$650.00 |
$705.00 |
$664.37 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 124.16 | CY |
$605.00 |
$650.00 |
$675.00 |
$747.50 |
$691.87 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 82,669 | LB |
$0.9000 |
$0.7500 |
$0.8000 |
$0.8700 |
$0.9800 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 274 | LF |
$43.00 |
$25.00 |
$36.00 |
$29.40 |
$34.19 |
| 34 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 645 | LF |
$47.00 |
$30.00 |
$45.00 |
$33.60 |
$40.25 |
| 35 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 274 | LF |
$16.00 |
$15.00 |
$6.00 |
$12.60 |
$16.50 |
| 36 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 645 | LF |
$16.00 |
$15.00 |
$8.00 |
$14.40 |
$16.50 |
| 37 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 38 | 516(A) 6095 |
DRILLED SHAFTS 54" DIAMETER | 502 | LF |
$880.00 |
$800.00 |
$875.00 |
$910.00 |
$929.84 |
| 39 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,400.00 |
$3,500.00 |
$2,000.00 |
$2,650.00 |
$3,025.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 512 | TON |
$60.00 |
$58.00 |
$75.00 |
$59.50 |
$62.85 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 171 | TON |
$52.00 |
$50.00 |
$60.00 |
$52.50 |
$54.80 |
| 42 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$21.00 |
$25.00 |
$29.00 |
$40.00 |
$30.77 |
| 43 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$22.00 |
$25.00 |
$29.00 |
$65.00 |
$33.16 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$14,000.00 |
$10,000.00 |
$40,000.00 |
$20,250.00 |
$93,500.00 |
| 45 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,200.00 |
$1,870.00 |
$1,575.00 |
$2,100.00 |
$2,640.00 |
| 46 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,600.00 |
$1,760.00 |
$1,475.00 |
$1,700.00 |
$1,677.50 |
| 47 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,000 | LF |
$1.90 |
$1.44 |
$1.00 |
$2.60 |
$1.10 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$7,975.00 |
$6,000.00 |
$6,500.00 |
$6,600.00 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$15,300.00 |
$14,300.00 |
$16,000.00 |
$15,290.00 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$4,500.00 |
$6,000.00 |
$6,000.00 |
$3,630.00 |
| 51 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$85,000.00 |
$129,655.00 |
$160,000.00 |
$129,186.24 |