| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$1,852.56 |
$27,614.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,999 | CY |
$10.00 |
$5.67 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,413 | CY |
$15.00 |
$5.67 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$11,433.99 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 11,941 | LF |
$1.85 |
$1.05 |
$1.55 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 756 | LF |
$7.00 |
$7.44 |
$9.25 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 11,208 | SY |
$1.45 |
$1.53 |
$1.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.56 | AC |
$250.00 |
$211.94 |
$205.00 |
| 9 | 241 2832 |
MOWING | 49.54 | AC |
$50.00 |
$62.84 |
$60.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,714 | CY |
$75.00 |
$37.62 |
$75.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 26,423 | SY |
$6.75 |
$4.97 |
$6.50 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,441 | SY |
$10.00 |
$1.53 |
$2.50 |
| 13 | 317 4270 |
CEMENT TREATED BASE | 19,416 | SY |
$16.00 |
$14.29 |
$21.50 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 43,776 | SY |
$2.00 |
$0.9900 |
$1.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,316 | TON |
$35.00 |
$19.05 |
$38.00 |
| 16 | 408 5774 |
PRIME COAT | 15,007 | GAL |
$5.00 |
$1.00 |
$5.80 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 39 | TON |
$180.00 |
$131.04 |
$320.00 |
| 18 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,763 | SY |
$18.00 |
$11.44 |
$18.00 |
| 19 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 15,277 | SY |
$21.00 |
$14.77 |
$19.00 |
| 20 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 1,312 | SY |
$80.00 |
$34.44 |
$40.00 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 5,911 | CY |
$140.00 |
$135.04 |
$108.50 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 5 | CY |
$25.00 |
$202.78 |
$100.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 12 | CY |
$420.00 |
$539.61 |
$1,150.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 951 | LB |
$1.30 |
$1.08 |
$1.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$3,366.35 |
$8,500.00 |
| 26 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$800.00 |
$1,401.63 |
$950.00 |
| 27 | 619(B) 4725 |
REMOVAL OF FENCE | 2,325 | LF |
$2.50 |
$1.16 |
$2.00 |
| 28 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 10,118 | SY |
$5.00 |
$7.23 |
$6.50 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 851 | SY |
$10.00 |
$3.84 |
$5.00 |
| 30 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 5,814 | SY |
$5.00 |
$5.77 |
$6.00 |
| 31 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,624 | LF |
$5.50 |
$2.15 |
$2.30 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 5,517 | LF |
$4.00 |
$1.40 |
$3.50 |
| 33 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 125 | LF |
$20.00 |
$21.30 |
$21.00 |
| 34 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,343.00 |
$2,300.00 |
| 35 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$1,491.00 |
$2,800.00 |
| 36 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,610 | LF |
$5.00 |
$4.99 |
$5.30 |
| 37 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$13.00 |
$21.30 |
$10.35 |
| 38 | 202(E) 0186 |
SELECT BORROW | 30 | CY |
$15.00 |
$38.55 |
$50.00 |
| 39 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 160 | CY |
$115.00 |
$30.87 |
$50.00 |
| 40 | 501(G) 6309 |
CLSM BACKFILL | 158 | CY |
$251.00 |
$104.06 |
$130.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$175.00 |
$154.36 |
$165.00 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 1,518.4 | SY |
$5.00 |
$4.31 |
$3.95 |
| 43 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84.33 | LF |
$377.00 |
$231.04 |
$205.00 |
| 44 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 683.4 | LF |
$97.00 |
$74.79 |
$70.00 |
| 45 | 506(A) 1322 |
STRUCTURAL STEEL | 284,280 | LB |
$2.00 |
$2.00 |
$1.67 |
| 46 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$1,574.21 |
$1,500.00 |
| 47 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,582.33 |
$1,500.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 360.1 | CY |
$550.00 |
$554.35 |
$715.00 |
| 49 | 509(B) 1328 |
CLASS A CONCRETE | 236.8 | CY |
$550.00 |
$564.49 |
$650.00 |
| 50 | 509(D) 1331 |
CLASS C CONCRETE | 6 | CY |
$500.00 |
$524.80 |
$650.00 |
| 51 | 510(C) 6138 |
SLOPE WALL (5") | 109.5 | SY |
$95.00 |
$178.62 |
$225.00 |
| 52 | 511(A) 1332 |
REINFORCING STEEL | 1,300 | LB |
$1.00 |
$1.19 |
$1.20 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,440 | LB |
$1.10 |
$1.30 |
$1.00 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 280 | LF |
$45.00 |
$27.32 |
$26.00 |
| 55 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 980 | LF |
$45.00 |
$32.06 |
$33.00 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 280 | LF |
$15.00 |
$26.64 |
$9.00 |
| 57 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 980 | LF |
$15.00 |
$19.59 |
$8.40 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 938 | SY |
$5.00 |
$3.20 |
$3.95 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 240 | LF |
$826.00 |
$700.00 |
$725.00 |
| 61 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 120 | LF |
$1,000.00 |
$900.00 |
$900.00 |
| 62 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,800.00 |
$1,384.50 |
$2,000.00 |
| 63 | 523(A) 6550 |
SEALER CRACK PREPARATION | 1,943 | LF |
$4.00 |
$5.33 |
$2.05 |
| 64 | 523(B) 6560 |
SEALER RESIN | 16 | GAL |
$115.00 |
$213.00 |
$105.00 |
| 65 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$39.00 |
$20.70 |
$20.00 |
| 66 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$40.00 |
$15.33 |
$20.00 |
| 67 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$85,000.00 |
$90,000.00 |
$50,000.00 |
| 68 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 220 | TON |
$30.00 |
$16.82 |
$38.00 |
| 69 | 509(A) 0319 |
CLASS AA CONCRETE | 8.34 | CY |
$500.00 |
$532.50 |
$275.00 |
| 70 | 509(D) 0325 |
CLASS C CONCRETE | 13.66 | CY |
$330.00 |
$524.87 |
$500.00 |
| 71 | 511(A) 0332 |
REINFORCING STEEL | 562 | LB |
$1.00 |
$2.13 |
$1.00 |
| 72 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 1,000 | LF |
$4.00 |
$5.33 |
$3.00 |
| 73 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,000 | LF |
$7.00 |
$21.30 |
$7.00 |
| 74 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$170.00 |
$101.18 |
$10.00 |
| 75 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 38 | EA |
$350.00 |
$346.13 |
$295.00 |
| 76 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$11.00 |
$5.33 |
$10.35 |
| 77 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$20.00 |
$16.27 |
$50.00 |
| 78 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$4.00 |
$2.74 |
$10.00 |
| 79 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$3.20 |
$2.66 |
$10.35 |
| 80 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,480 | SD |
$0.3000 |
$1.07 |
$0.2600 |
| 81 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,040 | SD |
$0.6000 |
$1.07 |
$1.05 |
| 82 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,020 | SD |
$1.30 |
$3.20 |
$1.55 |
| 83 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,040 | SD |
$0.8000 |
$1.07 |
$0.5200 |
| 84 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$1.00 |
$1.07 |
$3.10 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,400 | SD |
$0.2500 |
$0.5300 |
$0.2600 |
| 86 | 880(F) 8878 |
DRUMS | 9,360 | SD |
$0.2000 |
$0.5300 |
$0.2600 |
| 87 | 880(G) 8890 |
CHANNELIZER CONES | 7,200 | SD |
$0.2000 |
$0.5300 |
$0.2600 |
| 88 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 200 | HOUR |
$70.00 |
$74.55 |
$70.00 |
| 89 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$15.00 |
$21.30 |
$18.50 |
| 90 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 35 | EA |
$66.55 |
$53.25 |
$10.35 |
| 91 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$200.00 |
$1,065.00 |
$207.00 |
| 92 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 163.46 | SF |
$22.50 |
$17.04 |
$15.50 |
| 93 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 290 | LF |
$8.50 |
$8.52 |
$8.25 |
| 94 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 8,000 | LF |
$0.4500 |
$0.8000 |
$1.05 |
| 95 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 10,000 | LF |
$0.7000 |
$1.07 |
$1.50 |
| 96 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,400 | LF |
$1.20 |
$1.60 |
$2.05 |
| 97 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,100 | LF |
$2.00 |
$3.20 |
$3.10 |
| 98 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 50 | LF |
$6.00 |
$21.30 |
$6.20 |
| 99 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$38,020.50 |
$41,500.00 |
| 100 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$616.23 |
$2,000.00 |
| 101 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$445,000.00 |
$425,000.00 |
$437,750.00 |
| 102 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$20,000.00 |
| 103 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,089 | CY |
$10.00 |
$7.30 |
$12.00 |
| 104 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,976 | CY |
$15.00 |
$10.58 |
$20.00 |
| 105 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,000.00 |
$15,000.00 |
$5,000.00 |
| 106 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,156 | LF |
$2.00 |
$1.05 |
$1.55 |
| 107 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$166.14 |
$230.00 |
| 108 | 221(F) 0100 |
TEMPORARY SILT DIKE | 98 | LF |
$8.00 |
$7.44 |
$9.25 |
| 109 | 230(A) 2806 |
SOLID SLAB SODDING | 9,814 | SY |
$2.00 |
$1.53 |
$1.50 |
| 110 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.03 | AC |
$350.00 |
$211.94 |
$205.00 |
| 111 | 241 2832 |
MOWING | 4.06 | AC |
$70.00 |
$62.84 |
$60.00 |
| 112 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,000.00 |
$2,222.66 |
$3,000.00 |
| 113 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 831 | CY |
$60.00 |
$58.28 |
$75.00 |
| 114 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,049 | SY |
$6.00 |
$4.97 |
$6.50 |
| 115 | 317 4270 |
CEMENT TREATED BASE | 3,426 | SY |
$16.00 |
$14.85 |
$21.50 |
| 116 | 325 5271 |
SEPARATOR FABRIC | 7,838 | SY |
$2.00 |
$0.9900 |
$1.00 |
| 117 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 498 | TON |
$28.00 |
$26.76 |
$38.00 |
| 118 | 408 5774 |
PRIME COAT | 2,430 | GAL |
$7.00 |
$1.00 |
$5.80 |
| 119 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 34 | TON |
$250.00 |
$131.03 |
$320.00 |
| 120 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 935 | SY |
$18.00 |
$11.66 |
$18.00 |
| 121 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,181 | SY |
$22.00 |
$15.53 |
$20.00 |
| 122 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 693 | CY |
$140.00 |
$135.09 |
$160.00 |
| 123 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 9 | CY |
$850.00 |
$418.74 |
$430.00 |
| 124 | 509(D) 0325 |
CLASS C CONCRETE | 32 | CY |
$325.00 |
$303.99 |
$500.00 |
| 125 | 511(A) 0332 |
REINFORCING STEEL | 562 | LB |
$1.50 |
$1.08 |
$1.00 |
| 126 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 36 | TON |
$45.00 |
$57.46 |
$42.00 |
| 127 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 12 | TON |
$35.00 |
$57.46 |
$35.00 |
| 128 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 186 | LF |
$15.00 |
$18.79 |
$13.50 |
| 129 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 28 | LF |
$40.00 |
$55.21 |
$45.00 |
| 130 | 613(P) 4572 |
35" X 24" GALV. STEEL CULVERT END SECTION ARCH | 1 | EA |
$370.00 |
$680.50 |
$380.00 |
| 131 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$8,500.00 |
| 132 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,971 | SY |
$10.00 |
$4.71 |
$6.50 |
| 133 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,075 | SY |
$5.00 |
$4.56 |
$5.00 |
| 134 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 398 | SY |
$15.00 |
$4.79 |
$10.00 |
| 135 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 644 | LF |
$3.00 |
$2.15 |
$2.30 |
| 136 | 619(C) 0924 |
SAWING PAVEMENT | 74 | LF |
$5.00 |
$1.36 |
$5.00 |
| 137 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$1,500.00 |
$1,311.60 |
$1,450.00 |
| 138 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 150 | LF |
$18.00 |
$21.30 |
$21.00 |
| 139 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,300.00 |
$2,343.00 |
$2,300.00 |
| 140 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$2,000.00 |
$1,491.00 |
$2,800.00 |
| 141 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 140 | CY |
$115.00 |
$30.87 |
$90.00 |
| 142 | 501(G) 6309 |
CLSM BACKFILL | 169 | CY |
$145.00 |
$104.06 |
$130.00 |
| 143 | 504(A) 1304 |
APPROACH SLAB | 323.6 | SY |
$200.00 |
$154.35 |
$165.00 |
| 144 | 504(B) 1305 |
SAW-CUT GROOVING | 1,494.5 | SY |
$5.00 |
$4.31 |
$3.95 |
| 145 | 504(C) 6250 |
SEALED EXPANSION JOINT | 86.5 | LF |
$300.00 |
$231.02 |
$205.00 |
| 146 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 681.6 | LF |
$90.00 |
$74.70 |
$70.00 |
| 147 | 506(A) 1322 |
STRUCTURAL STEEL | 311,300 | LB |
$2.00 |
$2.00 |
$1.65 |
| 148 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$2,000.00 |
$1,574.26 |
$1,500.00 |
| 149 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,200.00 |
$1,582.31 |
$1,500.00 |
| 150 | 509(A) 1326 |
CLASS AA CONCRETE | 303.8 | CY |
$650.00 |
$583.19 |
$700.00 |
| 151 | 509(B) 1328 |
CLASS A CONCRETE | 267.1 | CY |
$650.00 |
$564.96 |
$650.00 |
| 152 | 510(C) 6138 |
SLOPE WALL (5") | 771 | SY |
$95.00 |
$178.62 |
$150.00 |
| 153 | 511(A) 1332 |
REINFORCING STEEL | 1,350 | LB |
$1.00 |
$1.19 |
$1.20 |
| 154 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 147,560 | LB |
$1.20 |
$1.30 |
$1.00 |
| 155 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 152 | LF |
$36.00 |
$30.57 |
$26.00 |
| 156 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 950 | LF |
$40.00 |
$37.53 |
$33.00 |
| 157 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 152 | LF |
$15.50 |
$26.64 |
$11.00 |
| 158 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 950 | LF |
$14.00 |
$19.59 |
$11.00 |
| 159 | 514(G) 6310 |
METAL PILE SHOES | 30 | EA |
$150.00 |
$88.35 |
$125.00 |
| 160 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 161 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,026 | SY |
$3.90 |
$3.20 |
$3.95 |
| 162 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 168 | LF |
$765.00 |
$700.00 |
$750.00 |
| 163 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 64 | LF |
$2,000.00 |
$1,100.00 |
$1,900.00 |
| 164 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,775.00 |
$1,384.50 |
$2,000.00 |
| 165 | 523(A) 6550 |
SEALER CRACK PREPARATION | 87 | LF |
$4.25 |
$2.13 |
$5.25 |
| 166 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$115.00 |
$106.50 |
$210.00 |
| 167 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$14,200.00 |
$3,340.74 |
$7,100.00 |
| 168 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 190 | LF |
$26.00 |
$20.70 |
$20.00 |
| 169 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$22.00 |
$15.28 |
$20.00 |
| 170 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$90,000.00 |
$33,666.02 |
| 171 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 64.51 | SF |
$20.00 |
$17.04 |
$15.50 |
| 172 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 96 | LF |
$9.50 |
$8.52 |
$8.25 |
| 173 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 6 | EA |
$12.00 |
$10.65 |
$15.50 |
| 174 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,168 | LF |
$1.00 |
$1.33 |
$1.05 |
| 175 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 38 | EA |
$50.00 |
$346.13 |
$295.00 |
| 176 | 870(C) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE REMOVAL | 1 | LSUM |
$750.00 |
$1,065.00 |
$1,550.00 |
| 177 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 50 | SD |
$8.25 |
$53.25 |
$10.35 |
| 178 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,200 | LF |
$25.00 |
$10.93 |
$25.00 |
| 179 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,435 | LF |
$3.25 |
$2.74 |
$3.00 |
| 180 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 140 | SD |
$2.60 |
$5.33 |
$10.35 |
| 181 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,920 | SD |
$0.2500 |
$0.2700 |
$0.1600 |
| 182 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,840 | SD |
$0.8000 |
$0.5300 |
$1.05 |
| 183 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,856 | SD |
$1.60 |
$0.2700 |
$1.55 |
| 184 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,080 | SD |
$5.00 |
$8.52 |
$2.55 |
| 185 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,920 | SD |
$1.00 |
$0.2700 |
$0.5200 |
| 186 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$0.7500 |
$1.07 |
$3.10 |
| 187 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,820 | SD |
$0.5000 |
$3.20 |
$0.2600 |
| 188 | 880(F) 8878 |
DRUMS | 7,350 | SD |
$0.5000 |
$0.5300 |
$0.2600 |
| 189 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 200 | HOUR |
$65.00 |
$74.55 |
$70.00 |
| 190 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 776 | SD |
$9.75 |
$10.65 |
$18.50 |
| 191 | 509(A) 0319 |
CLASS AA CONCRETE | 15.12 | CY |
$730.00 |
$532.50 |
$275.00 |
| 192 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 150 | LF |
$4.00 |
$15.98 |
$3.00 |
| 193 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 112 | LF |
$10.00 |
$42.60 |
$7.00 |
| 194 | 628(C) 5110 |
END ANCHORS | 4 | EA |
$2,450.00 |
$4,792.50 |
$1,410.00 |
| 195 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$616.23 |
$2,000.00 |
| 196 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$12,500.00 |
| 197 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,426 | CY |
$10.00 |
$6.84 |
$12.00 |
| 198 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,599 | CY |
$13.00 |
$12.33 |
$19.00 |
| 199 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$5,000.00 |
| 200 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,110 | LF |
$1.75 |
$1.05 |
$1.55 |
| 201 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,360 | LF |
$3.50 |
$2.46 |
$3.00 |
| 202 | 230(A) 2806 |
SOLID SLAB SODDING | 9,717 | SY |
$1.75 |
$1.34 |
$1.30 |
| 203 | 230(F) 2812 |
WATERING | 389 | KGAL |
$3.00 |
$10.60 |
$10.00 |
| 204 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.98 | TON |
$800.00 |
$953.18 |
$925.00 |
| 205 | 241 2832 |
MOWING | 12.97 | AC |
$50.00 |
$62.84 |
$60.00 |
| 206 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 565 | CY |
$60.00 |
$51.04 |
$85.00 |
| 207 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,853 | SY |
$10.00 |
$4.97 |
$6.50 |
| 208 | 325 5271 |
SEPARATOR FABRIC | 3,853 | SY |
$2.00 |
$0.9900 |
$1.00 |
| 209 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 228 | TON |
$50.00 |
$22.65 |
$45.00 |
| 210 | 407(B) 0250 |
TACK COAT | 435 | GAL |
$4.50 |
$6.44 |
$5.80 |
| 211 | 408 5774 |
PRIME COAT | 2,112 | GAL |
$7.00 |
$1.00 |
$5.80 |
| 212 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 816 | TON |
$100.00 |
$155.68 |
$130.00 |
| 213 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 354 | TON |
$120.00 |
$131.03 |
$154.00 |
| 214 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,500.00 |
$2,862.15 |
$2,000.00 |
| 215 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 0.8 | VF |
$100.00 |
$144.89 |
$125.00 |
| 216 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 40 | LF |
$85.00 |
$168.39 |
$83.00 |
| 217 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$750.00 |
$1,853.54 |
$890.00 |
| 218 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,000.00 |
$1,013.88 |
$8,500.00 |
| 219 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,291 | SY |
$7.00 |
$3.53 |
$5.00 |
| 220 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 485 | LF |
$3.50 |
$2.16 |
$2.30 |
| 221 | 619(C) 0924 |
SAWING PAVEMENT | 60 | LF |
$10.00 |
$1.40 |
$5.00 |
| 222 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$21.30 |
$19.50 |
| 223 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$234.30 |
$2,300.00 |
| 224 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,491.00 |
$2,650.00 |
| 225 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 156 | CY |
$25.00 |
$30.87 |
$40.00 |
| 226 | 501(G) 6309 |
CLSM BACKFILL | 134 | CY |
$160.00 |
$104.06 |
$120.00 |
| 227 | 504(A) 1304 |
APPROACH SLAB | 215.4 | SY |
$200.00 |
$164.75 |
$170.00 |
| 228 | 504(B) 1305 |
SAW-CUT GROOVING | 979 | SY |
$6.00 |
$4.31 |
$3.95 |
| 229 | 504(C) 6250 |
SEALED EXPANSION JOINT | 30.09 | LF |
$380.00 |
$231.04 |
$190.00 |
| 230 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 628.7 | LF |
$90.00 |
$74.35 |
$67.50 |
| 231 | 506(A) 1322 |
STRUCTURAL STEEL | 263,840 | LB |
$2.00 |
$2.00 |
$1.65 |
| 232 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,200.00 |
$1,574.21 |
$1,500.00 |
| 233 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,900.00 |
$1,582.28 |
$1,500.00 |
| 234 | 509(A) 1326 |
CLASS AA CONCRETE | 196.4 | CY |
$650.00 |
$599.78 |
$700.00 |
| 235 | 509(B) 1328 |
CLASS A CONCRETE | 134.1 | CY |
$600.00 |
$558.12 |
$650.00 |
| 236 | 510(C) 6135 |
SLOPE WALL (5") | 586 | SY |
$190.00 |
$178.62 |
$125.00 |
| 237 | 511(A) 1332 |
REINFORCING STEEL | 1,070 | LB |
$1.25 |
$1.19 |
$1.20 |
| 238 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 69,810 | LB |
$1.10 |
$1.30 |
$1.00 |
| 239 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 276 | LF |
$30.00 |
$27.40 |
$27.00 |
| 240 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 666 | LF |
$40.00 |
$32.40 |
$33.00 |
| 241 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 276 | LF |
$18.00 |
$26.65 |
$9.00 |
| 242 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 666 | LF |
$15.00 |
$19.59 |
$9.00 |
| 243 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 244 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 609 | SY |
$4.00 |
$3.20 |
$3.95 |
| 245 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 124 | LF |
$1,000.00 |
$900.00 |
$1,200.00 |
| 246 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$1,384.50 |
$1,750.00 |
| 247 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 134 | LF |
$28.00 |
$20.71 |
$20.00 |
| 248 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 68 | LF |
$35.00 |
$15.31 |
$20.00 |
| 249 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$800.00 |
$376.81 |
$500.00 |
| 250 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$88,689.00 |
$35,000.00 |
| 251 | 509(D) 0325 |
CLASS C CONCRETE | 13.66 | CY |
$325.00 |
$524.87 |
$475.00 |
| 252 | 511(A) 0332 |
REINFORCING STEEL | 562 | LB |
$1.00 |
$2.13 |
$1.00 |
| 253 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 450 | LF |
$10.00 |
$7.99 |
$6.00 |
| 254 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 38 | EA |
$400.00 |
$346.13 |
$295.00 |
| 255 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$10.00 |
$5.33 |
$10.35 |
| 256 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 687.5 | LF |
$30.00 |
$12.52 |
$23.00 |
| 257 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 775 | LF |
$10.00 |
$2.74 |
$2.00 |
| 258 | 880(A) 8800 |
ARROW DISPLAY(TYPE A) | 360 | SD |
$15.00 |
$2.66 |
$10.35 |
| 259 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,900 | SD |
$0.3500 |
$0.5300 |
$0.2600 |
| 260 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,320 | SD |
$0.4500 |
$2.13 |
$1.05 |
| 261 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,400 | SD |
$1.40 |
$0.5300 |
$1.55 |
| 262 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,240 | SD |
$0.8000 |
$0.5300 |
$0.5200 |
| 263 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.8000 |
$0.5300 |
$3.10 |
| 264 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,340 | SD |
$0.2500 |
$0.5300 |
$0.2600 |
| 265 | 880(F) 8878 |
DRUMS | 12,925 | SD |
$0.2000 |
$0.2700 |
$0.2600 |
| 266 | 880(G) 8890 |
CHANNELIZER CONES | 820 | SD |
$0.1700 |
$1.07 |
$0.2600 |
| 267 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 100 | HOUR |
$100.00 |
$74.55 |
$70.00 |
| 268 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 900 | SD |
$10.00 |
$10.65 |
$18.65 |
| 269 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 7 | EA |
$30.00 |
$53.25 |
$10.35 |
| 270 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$100.00 |
$532.50 |
$207.00 |
| 271 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 80 | LF |
$12.00 |
$8.52 |
$8.25 |
| 272 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 75 | LF |
$12.00 |
$8.52 |
$8.25 |
| 273 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 12 | EA |
$10.00 |
$21.30 |
$10.35 |
| 274 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,800 | LF |
$0.8000 |
$1.33 |
$1.05 |
| 275 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$616.23 |
$2,000.00 |