| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$28,268.78 |
$20,000.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,319.39 |
$10,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 800 | LF |
$3.00 |
$4.00 |
$1.30 |
| 4 | 221(K) 0600 |
TEMPORARY FIBER LOG | 122 | LF |
$7.00 |
$3.00 |
$3.60 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,925 | SY |
$3.00 |
$2.95 |
$5.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.06 | AC |
$530.00 |
$400.00 |
$950.00 |
| 7 | 407(B) 0250 |
TACK COAT | 420 | GAL |
$4.00 |
$6.00 |
$6.60 |
| 8 | 408 5774 |
PRIME COAT | 381 | GAL |
$8.00 |
$10.00 |
$11.00 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 166 | TON |
$125.00 |
$200.00 |
$210.00 |
| 10 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 192 | TON |
$140.00 |
$250.00 |
$265.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 180 | TON |
$130.00 |
$225.00 |
$240.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 1,708 | SY |
$15.00 |
$20.00 |
$22.00 |
| 13 | 609(B) 1523 |
2'-8" COMB. CURB & GUTTER (4" MNTBLE) | 215 | LF |
$30.00 |
$61.22 |
$60.00 |
| 14 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 100 | LF |
$25.00 |
$70.75 |
$20.00 |
| 15 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 455 | LF |
$10.00 |
$9.01 |
$20.00 |
| 16 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 804 | SY |
$10.00 |
$26.97 |
$30.00 |
| 17 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,200 | LF |
$5.00 |
$4.85 |
$5.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 550 | LF |
$20.00 |
$16.48 |
$17.50 |
| 19 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,200.00 |
$1,050.00 |
$1,105.00 |
| 20 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,650.00 |
| 21 | 623(I) 8690 |
GUARDRAIL BRIDGE CONN-TRAIL END (31") | 2 | EA |
$2,000.00 |
$1,400.00 |
$1,475.00 |
| 22 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$2,550.00 |
$2,675.00 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 112 | TON |
$140.00 |
$250.00 |
$265.00 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 795 | SY |
$15.00 |
$20.00 |
$22.00 |
| 25 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 795 | SY |
$15.00 |
$9.80 |
$11.00 |
| 26 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 14 | CY |
$25.00 |
$215.67 |
$100.00 |
| 27 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$40,000.00 |
$61,777.59 |
$86,000.00 |
| 28 | 504(A) 1304 |
APPROACH SLAB | 236.8 | SY |
$250.00 |
$290.94 |
$350.00 |
| 29 | 504(C) 6250 |
SEALED EXPANSION JOINT | 71.67 | LF |
$350.00 |
$341.12 |
$350.00 |
| 30 | 504(E) 1381 |
CONCRETE PARAPET | 124 | LF |
$200.00 |
$186.69 |
$275.00 |
| 31 | 505(D) 6080 |
ASPHALT MEMBRANE OVERLAY | 1,037 | SY |
$50.00 |
$75.00 |
$35.00 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$800.00 |
$996.26 |
$2,100.00 |
| 33 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$800.00 |
$996.26 |
$2,100.00 |
| 34 | 509 6152 |
SPECIAL CONCRETE FINISH | 1,374 | SY |
$40.00 |
$38.22 |
$30.00 |
| 35 | 509 6386 |
SILICONE CONSTRUCTION JOINT | 480 | LF |
$40.00 |
$19.99 |
$18.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 20.9 | CY |
$1,500.00 |
$500.00 |
$2,500.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 54.4 | CY |
$1,200.00 |
$1,920.89 |
$3,000.00 |
| 38 | 510(C) 6137 |
SLOPE WALL (4") | 40 | SY |
$200.00 |
$282.83 |
$300.00 |
| 39 | 511(A) 1332 |
REINFORCING STEEL | 2,810 | LB |
$1.60 |
$1.55 |
$1.00 |
| 40 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 11,620 | LB |
$1.60 |
$2.42 |
$1.25 |
| 41 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$40,000.00 |
| 42 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$2,000.00 |
$5,000.00 |
$5,000.00 |
| 43 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$380.00 |
$296.46 |
$300.00 |
| 44 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 60 | SY |
$500.00 |
$657.09 |
$550.00 |
| 45 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 184 | SY |
$5.00 |
$5.00 |
$5.50 |
| 46 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 200 | LF |
$50.00 |
$29.75 |
$31.00 |
| 47 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 20 | GAL |
$100.00 |
$80.00 |
$80.00 |
| 48 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 200 | SY |
$800.00 |
$550.00 |
$580.00 |
| 49 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 433.2 | SF |
$80.00 |
$30.00 |
$33.00 |
| 50 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 250 | SY |
$50.00 |
$31.00 |
$32.00 |
| 51 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$22,000.00 |
| 52 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 112 | TON |
$140.00 |
$250.00 |
$265.00 |
| 53 | 412 5267 |
COLD MILLING PAVEMENT | 795 | SY |
$15.00 |
$20.00 |
$22.00 |
| 54 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 795 | SY |
$15.00 |
$9.80 |
$11.00 |
| 55 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 14 | CY |
$25.00 |
$215.67 |
$100.00 |
| 56 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$40,000.00 |
$61,777.59 |
$87,000.00 |
| 57 | 504(A) 1304 |
APPROACH SLAB | 236.8 | SY |
$250.00 |
$290.94 |
$350.00 |
| 58 | 504(C) 6250 |
SEALED EXPANSION JOINT | 71.67 | LF |
$350.00 |
$341.12 |
$350.00 |
| 59 | 504(E) 1381 |
CONCRETE PARAPET | 124 | LF |
$200.00 |
$186.69 |
$275.00 |
| 60 | 505(D) 6080 |
ASPHALT MEMBRANE OVERLAY | 1,037 | SY |
$50.00 |
$110.00 |
$35.00 |
| 61 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$800.00 |
$996.26 |
$2,100.00 |
| 62 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$800.00 |
$996.26 |
$2,100.00 |
| 63 | 509 6152 |
SPECIAL CONCRETE FINISH | 1,374 | SY |
$40.00 |
$38.22 |
$30.00 |
| 64 | 509 6386 |
SILICONE CONSTRUCTION JOINT | 480 | LF |
$40.00 |
$19.99 |
$18.00 |
| 65 | 509(A) 1326 |
CLASS AA CONCRETE | 20.9 | CY |
$1,500.00 |
$500.00 |
$2,500.00 |
| 66 | 509(B) 1328 |
CLASS A CONCRETE | 54.4 | CY |
$1,200.00 |
$1,920.89 |
$3,000.00 |
| 67 | 510(C) 6137 |
SLOPE WALL (4") | 40 | SY |
$200.00 |
$282.83 |
$300.00 |
| 68 | 511(A) 1332 |
REINFORCING STEEL | 2,810 | LB |
$1.60 |
$1.55 |
$1.00 |
| 69 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 11,620 | LB |
$1.60 |
$2.42 |
$1.25 |
| 70 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$40,000.00 |
| 71 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$2,000.00 |
$5,000.00 |
$5,000.00 |
| 72 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$380.00 |
$296.46 |
$300.00 |
| 73 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 60 | SY |
$500.00 |
$657.09 |
$550.00 |
| 74 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 184 | SY |
$5.00 |
$5.00 |
$5.50 |
| 75 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 200 | LF |
$50.00 |
$19.75 |
$31.00 |
| 76 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 20 | GAL |
$100.00 |
$80.00 |
$80.00 |
| 77 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 200 | SY |
$800.00 |
$550.00 |
$580.00 |
| 78 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 433.2 | SF |
$80.00 |
$30.00 |
$33.00 |
| 79 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 250 | SY |
$50.00 |
$31.00 |
$32.00 |
| 80 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$27,000.00 |
| 81 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 200 | DAY |
$650.00 |
$650.00 |
$650.00 |
| 82 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,624 | EA |
$1.00 |
$0.7000 |
$0.7300 |
| 83 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 115 | SD |
$15.00 |
$3.00 |
$3.30 |
| 84 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,202 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
| 85 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,730 | SD |
$0.5500 |
$1.90 |
$2.00 |
| 86 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,884 | SD |
$1.00 |
$1.90 |
$2.00 |
| 87 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,770 | SD |
$0.3000 |
$0.1000 |
$0.1100 |
| 88 | 880(C) 8848 |
WING BARRICADES | 976 | SD |
$0.7500 |
$0.0500 |
$0.0500 |
| 89 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 12,692 | SD |
$0.2000 |
$0.4000 |
$0.4400 |
| 90 | 880(G) 8884 |
TUBE CHANNELIZERS | 7,000 | SD |
$0.3000 |
$0.5000 |
$0.5500 |
| 91 | 880(G) 8890 |
CHANNELIZER CONES | 16,030 | SD |
$0.3500 |
$0.2000 |
$0.2200 |
| 92 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$100.00 |
$85.00 |
$90.00 |
| 93 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$30.00 |
$38.00 |
$40.00 |
| 94 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 24 | LF |
$12.00 |
$8.00 |
$9.00 |
| 95 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 24 | EA |
$12.00 |
$11.95 |
$13.00 |
| 96 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,833 | LF |
$0.6000 |
$0.5500 |
$0.5800 |
| 97 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 4 | EA |
$130.00 |
$95.00 |
$100.00 |
| 98 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 8,760 | LF |
$0.5000 |
$0.7900 |
$0.8300 |
| 99 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$8,000.00 |
| 100 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$240,000.00 |
$344,361.95 |