Bid tab 180019

Let Jan 18, 2018 · Division 3 · Okfuskee Sign up free

‹ Jan 2018 results

BRIDGE AND APPROACHES US -62: OVER BOLEY CREEK , 4.3 MILES NORTHWEST OF THE SH -48 INTERSECTION NEAR BOLEY. PROJECT LENGTH = 0.320 MILE

Let date
Thursday, January 18, 2018
Contract
180019
J/P numbers
27963(04)
District
Division 3
County
Okfuskee
Highway
Limits
BRIDGE AND APPROACHES US -62: OVER BOLEY CREEK , 4.3 MILES NORTHWEST OF THE SH -48 INTERSECTION NEAR BOLEY. PROJECT LENGTH = 0.320 MILE
Project number
STP-254C(040)SS

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,947,671
1 Treas Construction Inc Low bidder $2,519,493 -14.5%
3 Frontier Bridge, Inc. $2,645,120 -10.3% +5.0%
4 BRIDGECO CONTRACTORS, INC. $2,664,960 -9.6% +5.8%
5 RRY SERVICES LLC $2,894,863 -1.8% +14.9%
6 HASKELL LEMON CONSTRUCTION CO. $2,952,464 +0.2% +17.2%
7 L & N BRIDGE, LLC $2,975,152 +0.9% +18.1%
8 C-GAWF CONSTRUCTION, INC. $3,139,983 +6.5% +24.6%
9 GLOVER & ASSOCIATES, INC. $3,152,021 +6.9% +25.1%

Bid tab: unit prices 89 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Treas Construct…#3 Frontier Bridge…#4 BRIDGECO CONTRA…#5 RRY SERVICES LLC#6 HASKELL LEMON C…#7 L & N BRIDGE, L…#8 C-GAWF CONSTRUC…#9 GLOVER & ASSOCI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $31,475.00 $7,725.00 $7,875.00 $21,200.00 $16,000.00 $7,724.00 $13,200.00 $9,000.00 $115,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION26,367CY $7.00 $3.86 $3.94 $6.24 $7.70 $3.85 $7.70 $4.50 $9.00
3202(D) 0184 UNCLASSIFIED BORROW4,587CY $10.00 $4.89 $4.99 $7.80 $8.20 $4.90 $8.20 $5.70 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $28,777.00 $15,450.00 $15,750.00 $9,500.00 $12,000.00 $15,450.00 $12,000.00 $18,000.00 $41,000.00
5221(C) 2801 TEMPORARY SILT FENCE6,981LF $2.00 $2.06 $2.10 $3.06 $2.95 $2.05 $2.95 $2.25 $1.40
6221(F) 0100 TEMPORARY SILT DIKE157LF $8.25 $12.36 $12.60 $19.70 $18.95 $12.40 $18.95 $14.44 $22.25
7221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 159CY $100.00 $113.30 $115.50 $45.68 $125.00 $113.50 $120.00 $125.00 $98.65
8221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 277CY $125.00 $206.00 $210.00 $45.68 $130.00 $206.00 $130.00 $125.00 $81.58
9221(K) 0600 TEMPORARY FIBER LOG3,519LF $5.25 $2.06 $2.10 $5.15 $4.95 $2.05 $4.95 $2.75 $1.97
10230(A) 2806 SOLID SLAB SODDING6,751SY $1.75 $3.09 $3.15 $6.13 $5.95 $3.10 $5.95 $4.40 $7.07
11232(B) 2814 SEEDING METHOD B3AC $500.00 $1,545.00 $1,575.00 $3,038.50 $2,950.00 $1,545.00 $2,950.00 $2,500.00 $3,506.99
12233(A) 2817 VEGETATIVE MULCHING11AC $550.00 $824.00 $840.00 $1,500.00 $1,450.00 $824.00 $1,450.00 $750.00 $1,525.00
13241 2832 MOWING20AC $80.00 $103.00 $105.00 $205.00 $195.00 $103.00 $195.00 $55.00 $50.00
14303(A) 2100 AGGREGATE BASE TYPE A1,715CY $47.30 $62.32 $63.53 $60.66 $42.00 $70.60 $42.00 $57.15 $61.50
15307(A) 4200 FLY ASH908TON $65.00 $71.07 $72.45 $70.12 $69.00 $59.90 $75.00 $98.00 $70.14
16307(K) 4300 STABILIZED SUBGRADE16,813SY $8.00 $5.00 $5.09 $2.26 $4.85 $5.10 $2.50 $5.71 $5.25
17325 5271 SEPARATOR FABRIC8,358SY $1.75 $1.39 $1.42 $2.15 $4.20 $6.20 $4.20 $1.75 $1.15
18402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E684TON $32.00 $31.06 $31.52 $30.10 $28.00 $61.90 $28.00 $36.67 $32.25
19407(B) 0250 TACK COAT4,620GAL $3.10 $3.86 $2.10 $3.86 $2.00 $3.80 $3.75 $5.50 $2.05
20408 5774 PRIME COAT5,155GAL $5.50 $5.15 $3.15 $9.79 $3.00 $7.50 $9.50 $10.00 $0.5000
21411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)4,840TON $75.00 $68.08 $69.28 $68.08 $65.98 $65.60 $66.10 $76.00 $65.75
22411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,709TON $85.00 $71.38 $79.27 $71.38 $74.49 $68.80 $69.30 $81.00 $73.40
23509(A) 0319 CLASS AA CONCRETE94CY $400.00 $360.50 $560.62 $435.00 $675.00 $412.00 $670.00 $555.00 $702.00
24509(D) 0325 CLASS C CONCRETE166CY $325.00 $334.75 $339.44 $300.00 $360.00 $257.50 $360.00 $325.00 $559.57
25511(A) 0332 REINFORCING STEEL14,131LB $0.9500 $1.03 $1.03 $0.9800 $1.00 $1.05 $1.00 $1.25 $1.21
26601(A) 0297 TYPE I PLAIN RIPRAP100TON $44.00 $51.46 $67.87 $46.68 $51.00 $79.30 $51.00 $50.00 $55.42
27613(A) 0492 24" R.C.PIPE CLASS III30LF $70.00 $63.99 $70.20 $100.18 $88.00 $103.00 $88.00 $100.00 $86.90
28613(B) 5747 120" CORR. GALV. STEEL PIPE280LF $200.00 $256.87 $258.59 $255.20 $250.00 $257.50 $227.00 $325.00 $111.09
29613(M) 7196 TYPE A6 CULVERT END TREATMENT1EA $1,200.00 $1,236.00 $1,497.48 $1,250.00 $1,500.00 $2,060.00 $1,600.00 $2,650.00 $4,442.89
30613(X) 1184 RELAYING CULVERT PIPE(24" ROUND)18LF $50.00 $36.05 $36.75 $22.00 $18.00 $72.10 $18.00 $55.00 $45.74
31619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $3,605.00 $3,675.00 $5,750.00 $8,000.00 $3,605.00 $7,100.00 $6,600.00 $51,000.00
32619(B) 4727 REMOVAL OF CONCRETE PAVEMENT4,082SY $5.50 $4.64 $4.73 $8.00 $7.25 $4.65 $7.25 $5.50 $2.92
33619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9,730SY $4.00 $3.61 $3.68 $3.25 $3.25 $5.55 $3.25 $4.50 $1.77
34619(C) 0924 SAWING PAVEMENT84LF $10.00 $20.60 $21.00 $12.00 $11.00 $22.50 $11.00 $25.00 $8.17
35623 0100 (PL)GUARDRAIL CURBING2EA $1,000.00 $1,287.50 $1,813.75 $1,650.00 $1,500.00 $2,114.00 $2,200.00 $1,750.00 $1,010.05
36623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,025LF $20.00 $17.00 $16.75 $21.00 $15.95 $16.40 $15.95 $18.66 $19.62
37623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,188.75 $2,552.25 $2,575.00 $1,465.00 $2,209.00 $2,145.00 $2,633.00 $2,526.22
38623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,550.00 $1,699.50 $1,538.25 $1,850.00 $2,145.00 $1,509.00 $1,465.00 $1,750.00 $1,961.54
39624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,600LF $7.50 $4.02 $4.10 $4.65 $3.90 $4.00 $3.90 $5.55 $10.10
40853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)30EA $20.00 $15.45 $15.75 $20.00 $15.00 $15.50 $15.00 $25.00 $17.83
41501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON88CY $25.00 $20.60 $32.40 $14.00 $15.00 $37.70 $11.00 $25.00 $35.66
42501(G) 6309 CLSM BACKFILL188.8CY $175.00 $202.11 $123.97 $148.90 $150.00 $167.50 $140.00 $155.00 $154.55
43503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)546.6LF $230.00 $185.11 $179.17 $180.68 $220.00 $199.50 $280.00 $226.00 $255.59
44503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)423.3LF $250.00 $209.07 $198.29 $205.05 $260.00 $204.50 $310.00 $255.00 $267.48
45504(A) 1304 APPROACH SLAB246.4SY $220.00 $186.69 $231.33 $235.50 $220.00 $288.00 $180.00 $165.00 $196.15
46504(B) 1305 SAW-CUT GROOVING1,190.6SY $5.00 $5.15 $4.16 $4.16 $4.00 $3.95 $4.00 $4.55 $4.76
47504(D) 6245 CONCRETE RAIL (TR4)487LF $100.00 $82.06 $77.05 $80.00 $75.00 $92.50 $90.00 $61.25 $95.05
48506(A) 1322 STRUCTURAL STEEL1,320LB $4.00 $2.15 $3.31 $3.00 $3.00 $3.50 $1.50 $3.33 $2.97
49507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY10EA $700.00 $624.06 $717.08 $550.00 $450.00 $847.50 $500.00 $775.00 $534.97
50507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $2,500.00 $1,328.39 $1,367.35 $1,250.00 $1,600.00 $1,691.00 $1,200.00 $1,275.00 $1,664.34
51507(C) 6282 ELASTOMERIC BEARING PADS20EA $500.00 $579.63 $346.67 $350.00 $450.00 $471.50 $250.00 $555.00 $708.00
52509(A) 1326 CLASS AA CONCRETE284.4CY $575.00 $515.64 $576.64 $550.00 $575.00 $542.00 $820.00 $575.00 $706.00
53509(B) 1328 CLASS A CONCRETE153CY $525.00 $515.64 $597.89 $550.00 $575.00 $646.50 $810.00 $575.00 $708.00
54511(A) 1332 REINFORCING STEEL620LB $1.15 $1.53 $1.32 $1.10 $1.25 $6.45 $1.25 $1.00 $1.01
55511(B) 6010 EPOXY COATED REINFORCING STEEL88,790LB $1.25 $1.06 $1.04 $1.05 $1.05 $1.10 $1.00 $1.10 $0.9900
56514(A) 6010 PILES, FURNISHED (HP 10X42)680LF $35.00 $25.38 $33.42 $25.75 $35.00 $36.00 $32.00 $39.00 $49.93
57514(B) 6292 PILES, DRIVEN (HP 10X42)680LF $20.00 $12.36 $15.12 $14.00 $12.00 $19.70 $14.00 $15.00 $23.78
58514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
59515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)951SY $4.00 $4.79 $3.94 $3.80 $3.65 $3.75 $3.65 $4.33 $4.34
60516(A) 6096 DRILLED SHAFTS 60" DIAMETER148LF $800.00 $932.50 $1,030.10 $1,026.00 $975.00 $1,014.00 $1,100.00 $1,125.00 $1,105.00
61516(C) 6200 CROSSHOLE SONIC LOGGING1EA $2,500.00 $2,729.50 $4,212.00 $2,250.00 $1,650.00 $6,073.00 $1,650.00 $44,000.00 $3,328.67
62523(A) 6550 SEALER CRACK PREPARATION179.2LF $5.00 $5.15 $4.32 $4.20 $4.00 $4.10 $4.00 $5.55 $4.76
63523(B) 6560 SEALER RESIN1.9GAL $250.00 $221.45 $216.00 $256.00 $200.00 $206.00 $200.00 $225.00 $237.76
64601(B) 1353 TYPE I-A PLAIN RIPRAP3,080TON $50.00 $47.34 $43.89 $45.60 $50.00 $49.70 $40.00 $55.00 $41.25
65601(C) 1355 TYPE I-A FILTER BLANKET670TON $40.00 $39.09 $36.45 $38.75 $44.00 $40.80 $32.00 $45.00 $35.66
66613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND92LF $25.00 $30.90 $34.13 $35.00 $35.00 $60.00 $27.00 $25.00 $23.78
67613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.00 $30.90 $23.33 $25.00 $35.00 $32.50 $20.00 $25.00 $23.78
68619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $22,660.00 $23,760.00 $20,000.00 $85,000.00 $64,050.00 $60,000.00 $35,000.00 $47,000.00
69857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)7,536LF $0.2000 $0.1000 $0.1100 $0.1200 $0.1000 $0.2600 $0.1000 $0.1500 $0.3000
70857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-21,180EA $0.5400 $1.03 $1.08 $1.04 $1.00 $0.8800 $1.00 $1.20 $1.01
71857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)5,420LF $0.2500 $0.1000 $0.1100 $0.1200 $0.1000 $0.1000 $0.1000 $0.1200 $0.1200
72880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF5,625SD $0.2200 $0.2600 $0.2700 $0.2700 $0.2500 $0.3600 $0.2500 $0.3000 $0.4200
73880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,530SD $0.8800 $0.5200 $0.5400 $0.5200 $0.5000 $1.55 $0.5000 $0.7500 $1.78
74880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,105SD $2.00 $0.5200 $0.5400 $0.5200 $0.5000 $2.05 $0.5000 $0.7500 $2.38
75880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,920SD $2.00 $0.2600 $0.2700 $0.2800 $0.2500 $0.5100 $0.2500 $0.4000 $0.5900
76880(C) 8848 WING BARRICADES840SD $0.8800 $1.03 $1.08 $1.04 $1.00 $2.05 $1.00 $1.25 $2.38
77880(D) 8854 VERTICAL PANELS14,490SD $0.1800 $0.1000 $0.1100 $0.1200 $0.1000 $0.2600 $0.1000 $0.1500 $0.3000
78880(E) 8860 WARNING LIGHTS(TYPE A)2,385SD $1.00 $2.06 $2.16 $2.10 $2.00 $0.5100 $2.00 $2.25 $0.5900
79880(F) 8878 DRUMS7,560SD $0.7500 $0.1000 $0.1100 $0.1400 $0.1000 $0.2600 $0.1000 $0.1500 $0.3000
80882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN420SD $16.30 $10.30 $10.80 $10.40 $10.00 $10.30 $10.00 $12.50 $11.89
81804(A) 2915 STRUCTURAL CONCRETE0.24CY $485.00 $515.00 $540.00 $525.00 $500.00 $772.50 $500.00 $550.00 $891.63
82805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS4EA $45.00 $25.75 $27.00 $35.00 $25.00 $25.80 $25.00 $30.00 $29.72
83850(A) 8110 SHEET ALUMINUM SIGNS24SF $19.25 $25.75 $27.00 $30.00 $25.00 $20.60 $25.00 $30.00 $23.78
84851(B) 3216 2"@3.65 GALV.STEEL PIPE POST48LF $14.75 $15.45 $16.20 $17.25 $15.00 $18.50 $15.00 $18.00 $21.40
85855(A) 8840 TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE)10,413LF $0.6000 $0.5600 $0.5800 $0.5800 $0.5400 $0.4600 $0.5400 $0.6500 $0.5300
86642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $40,100.00 $15,965.00 $15,660.00 $16,500.00 $17,500.00 $14,935.00 $20,000.00 $32,750.00 $11,888.11
87220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $6,200.00 $3,090.00 $4,320.00 $3,000.00 $1,275.00 $3,509.00 $3,000.00 $7,250.00 $2,972.03
88640(A) 1398 FIELD OFFICE1EA $8,725.00 $5,665.00 $15,120.00 $10,500.00 $5,000.00 $2,699.00 $6,000.00 $12,750.00 $1,783.22
89641 1552 MOBILIZATION1LSUM $135,000.00 $101,426.17 $155,974.87 $110,000.00 $169,000.00 $298,600.26 $165,000.00 $300,000.00 $175,000.00