| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$31,475.00 |
$7,725.00 |
$7,875.00 |
$21,200.00 |
$16,000.00 |
$7,724.00 |
$13,200.00 |
$9,000.00 |
$115,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 26,367 | CY |
$7.00 |
$3.86 |
$3.94 |
$6.24 |
$7.70 |
$3.85 |
$7.70 |
$4.50 |
$9.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,587 | CY |
$10.00 |
$4.89 |
$4.99 |
$7.80 |
$8.20 |
$4.90 |
$8.20 |
$5.70 |
$9.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$28,777.00 |
$15,450.00 |
$15,750.00 |
$9,500.00 |
$12,000.00 |
$15,450.00 |
$12,000.00 |
$18,000.00 |
$41,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,981 | LF |
$2.00 |
$2.06 |
$2.10 |
$3.06 |
$2.95 |
$2.05 |
$2.95 |
$2.25 |
$1.40 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 157 | LF |
$8.25 |
$12.36 |
$12.60 |
$19.70 |
$18.95 |
$12.40 |
$18.95 |
$14.44 |
$22.25 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 59 | CY |
$100.00 |
$113.30 |
$115.50 |
$45.68 |
$125.00 |
$113.50 |
$120.00 |
$125.00 |
$98.65 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 77 | CY |
$125.00 |
$206.00 |
$210.00 |
$45.68 |
$130.00 |
$206.00 |
$130.00 |
$125.00 |
$81.58 |
| 9 | 221(K) 0600 |
TEMPORARY FIBER LOG | 3,519 | LF |
$5.25 |
$2.06 |
$2.10 |
$5.15 |
$4.95 |
$2.05 |
$4.95 |
$2.75 |
$1.97 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 6,751 | SY |
$1.75 |
$3.09 |
$3.15 |
$6.13 |
$5.95 |
$3.10 |
$5.95 |
$4.40 |
$7.07 |
| 11 | 232(B) 2814 |
SEEDING METHOD B | 3 | AC |
$500.00 |
$1,545.00 |
$1,575.00 |
$3,038.50 |
$2,950.00 |
$1,545.00 |
$2,950.00 |
$2,500.00 |
$3,506.99 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 11 | AC |
$550.00 |
$824.00 |
$840.00 |
$1,500.00 |
$1,450.00 |
$824.00 |
$1,450.00 |
$750.00 |
$1,525.00 |
| 13 | 241 2832 |
MOWING | 20 | AC |
$80.00 |
$103.00 |
$105.00 |
$205.00 |
$195.00 |
$103.00 |
$195.00 |
$55.00 |
$50.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,715 | CY |
$47.30 |
$62.32 |
$63.53 |
$60.66 |
$42.00 |
$70.60 |
$42.00 |
$57.15 |
$61.50 |
| 15 | 307(A) 4200 |
FLY ASH | 908 | TON |
$65.00 |
$71.07 |
$72.45 |
$70.12 |
$69.00 |
$59.90 |
$75.00 |
$98.00 |
$70.14 |
| 16 | 307(K) 4300 |
STABILIZED SUBGRADE | 16,813 | SY |
$8.00 |
$5.00 |
$5.09 |
$2.26 |
$4.85 |
$5.10 |
$2.50 |
$5.71 |
$5.25 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 8,358 | SY |
$1.75 |
$1.39 |
$1.42 |
$2.15 |
$4.20 |
$6.20 |
$4.20 |
$1.75 |
$1.15 |
| 18 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 684 | TON |
$32.00 |
$31.06 |
$31.52 |
$30.10 |
$28.00 |
$61.90 |
$28.00 |
$36.67 |
$32.25 |
| 19 | 407(B) 0250 |
TACK COAT | 4,620 | GAL |
$3.10 |
$3.86 |
$2.10 |
$3.86 |
$2.00 |
$3.80 |
$3.75 |
$5.50 |
$2.05 |
| 20 | 408 5774 |
PRIME COAT | 5,155 | GAL |
$5.50 |
$5.15 |
$3.15 |
$9.79 |
$3.00 |
$7.50 |
$9.50 |
$10.00 |
$0.5000 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,840 | TON |
$75.00 |
$68.08 |
$69.28 |
$68.08 |
$65.98 |
$65.60 |
$66.10 |
$76.00 |
$65.75 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,709 | TON |
$85.00 |
$71.38 |
$79.27 |
$71.38 |
$74.49 |
$68.80 |
$69.30 |
$81.00 |
$73.40 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 94 | CY |
$400.00 |
$360.50 |
$560.62 |
$435.00 |
$675.00 |
$412.00 |
$670.00 |
$555.00 |
$702.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 166 | CY |
$325.00 |
$334.75 |
$339.44 |
$300.00 |
$360.00 |
$257.50 |
$360.00 |
$325.00 |
$559.57 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 14,131 | LB |
$0.9500 |
$1.03 |
$1.03 |
$0.9800 |
$1.00 |
$1.05 |
$1.00 |
$1.25 |
$1.21 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 100 | TON |
$44.00 |
$51.46 |
$67.87 |
$46.68 |
$51.00 |
$79.30 |
$51.00 |
$50.00 |
$55.42 |
| 27 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 30 | LF |
$70.00 |
$63.99 |
$70.20 |
$100.18 |
$88.00 |
$103.00 |
$88.00 |
$100.00 |
$86.90 |
| 28 | 613(B) 5747 |
120" CORR. GALV. STEEL PIPE | 280 | LF |
$200.00 |
$256.87 |
$258.59 |
$255.20 |
$250.00 |
$257.50 |
$227.00 |
$325.00 |
$111.09 |
| 29 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,236.00 |
$1,497.48 |
$1,250.00 |
$1,500.00 |
$2,060.00 |
$1,600.00 |
$2,650.00 |
$4,442.89 |
| 30 | 613(X) 1184 |
RELAYING CULVERT PIPE(24" ROUND) | 18 | LF |
$50.00 |
$36.05 |
$36.75 |
$22.00 |
$18.00 |
$72.10 |
$18.00 |
$55.00 |
$45.74 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$3,605.00 |
$3,675.00 |
$5,750.00 |
$8,000.00 |
$3,605.00 |
$7,100.00 |
$6,600.00 |
$51,000.00 |
| 32 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 4,082 | SY |
$5.50 |
$4.64 |
$4.73 |
$8.00 |
$7.25 |
$4.65 |
$7.25 |
$5.50 |
$2.92 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,730 | SY |
$4.00 |
$3.61 |
$3.68 |
$3.25 |
$3.25 |
$5.55 |
$3.25 |
$4.50 |
$1.77 |
| 34 | 619(C) 0924 |
SAWING PAVEMENT | 84 | LF |
$10.00 |
$20.60 |
$21.00 |
$12.00 |
$11.00 |
$22.50 |
$11.00 |
$25.00 |
$8.17 |
| 35 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$1,000.00 |
$1,287.50 |
$1,813.75 |
$1,650.00 |
$1,500.00 |
$2,114.00 |
$2,200.00 |
$1,750.00 |
$1,010.05 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,025 | LF |
$20.00 |
$17.00 |
$16.75 |
$21.00 |
$15.95 |
$16.40 |
$15.95 |
$18.66 |
$19.62 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,188.75 |
$2,552.25 |
$2,575.00 |
$1,465.00 |
$2,209.00 |
$2,145.00 |
$2,633.00 |
$2,526.22 |
| 38 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,550.00 |
$1,699.50 |
$1,538.25 |
$1,850.00 |
$2,145.00 |
$1,509.00 |
$1,465.00 |
$1,750.00 |
$1,961.54 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,600 | LF |
$7.50 |
$4.02 |
$4.10 |
$4.65 |
$3.90 |
$4.00 |
$3.90 |
$5.55 |
$10.10 |
| 40 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 30 | EA |
$20.00 |
$15.45 |
$15.75 |
$20.00 |
$15.00 |
$15.50 |
$15.00 |
$25.00 |
$17.83 |
| 41 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 88 | CY |
$25.00 |
$20.60 |
$32.40 |
$14.00 |
$15.00 |
$37.70 |
$11.00 |
$25.00 |
$35.66 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 188.8 | CY |
$175.00 |
$202.11 |
$123.97 |
$148.90 |
$150.00 |
$167.50 |
$140.00 |
$155.00 |
$154.55 |
| 43 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 546.6 | LF |
$230.00 |
$185.11 |
$179.17 |
$180.68 |
$220.00 |
$199.50 |
$280.00 |
$226.00 |
$255.59 |
| 44 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 423.3 | LF |
$250.00 |
$209.07 |
$198.29 |
$205.05 |
$260.00 |
$204.50 |
$310.00 |
$255.00 |
$267.48 |
| 45 | 504(A) 1304 |
APPROACH SLAB | 246.4 | SY |
$220.00 |
$186.69 |
$231.33 |
$235.50 |
$220.00 |
$288.00 |
$180.00 |
$165.00 |
$196.15 |
| 46 | 504(B) 1305 |
SAW-CUT GROOVING | 1,190.6 | SY |
$5.00 |
$5.15 |
$4.16 |
$4.16 |
$4.00 |
$3.95 |
$4.00 |
$4.55 |
$4.76 |
| 47 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 487 | LF |
$100.00 |
$82.06 |
$77.05 |
$80.00 |
$75.00 |
$92.50 |
$90.00 |
$61.25 |
$95.05 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 1,320 | LB |
$4.00 |
$2.15 |
$3.31 |
$3.00 |
$3.00 |
$3.50 |
$1.50 |
$3.33 |
$2.97 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$700.00 |
$624.06 |
$717.08 |
$550.00 |
$450.00 |
$847.50 |
$500.00 |
$775.00 |
$534.97 |
| 50 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$1,328.39 |
$1,367.35 |
$1,250.00 |
$1,600.00 |
$1,691.00 |
$1,200.00 |
$1,275.00 |
$1,664.34 |
| 51 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$500.00 |
$579.63 |
$346.67 |
$350.00 |
$450.00 |
$471.50 |
$250.00 |
$555.00 |
$708.00 |
| 52 | 509(A) 1326 |
CLASS AA CONCRETE | 284.4 | CY |
$575.00 |
$515.64 |
$576.64 |
$550.00 |
$575.00 |
$542.00 |
$820.00 |
$575.00 |
$706.00 |
| 53 | 509(B) 1328 |
CLASS A CONCRETE | 153 | CY |
$525.00 |
$515.64 |
$597.89 |
$550.00 |
$575.00 |
$646.50 |
$810.00 |
$575.00 |
$708.00 |
| 54 | 511(A) 1332 |
REINFORCING STEEL | 620 | LB |
$1.15 |
$1.53 |
$1.32 |
$1.10 |
$1.25 |
$6.45 |
$1.25 |
$1.00 |
$1.01 |
| 55 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,790 | LB |
$1.25 |
$1.06 |
$1.04 |
$1.05 |
$1.05 |
$1.10 |
$1.00 |
$1.10 |
$0.9900 |
| 56 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 680 | LF |
$35.00 |
$25.38 |
$33.42 |
$25.75 |
$35.00 |
$36.00 |
$32.00 |
$39.00 |
$49.93 |
| 57 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 680 | LF |
$20.00 |
$12.36 |
$15.12 |
$14.00 |
$12.00 |
$19.70 |
$14.00 |
$15.00 |
$23.78 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 951 | SY |
$4.00 |
$4.79 |
$3.94 |
$3.80 |
$3.65 |
$3.75 |
$3.65 |
$4.33 |
$4.34 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 148 | LF |
$800.00 |
$932.50 |
$1,030.10 |
$1,026.00 |
$975.00 |
$1,014.00 |
$1,100.00 |
$1,125.00 |
$1,105.00 |
| 61 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,500.00 |
$2,729.50 |
$4,212.00 |
$2,250.00 |
$1,650.00 |
$6,073.00 |
$1,650.00 |
$44,000.00 |
$3,328.67 |
| 62 | 523(A) 6550 |
SEALER CRACK PREPARATION | 179.2 | LF |
$5.00 |
$5.15 |
$4.32 |
$4.20 |
$4.00 |
$4.10 |
$4.00 |
$5.55 |
$4.76 |
| 63 | 523(B) 6560 |
SEALER RESIN | 1.9 | GAL |
$250.00 |
$221.45 |
$216.00 |
$256.00 |
$200.00 |
$206.00 |
$200.00 |
$225.00 |
$237.76 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,080 | TON |
$50.00 |
$47.34 |
$43.89 |
$45.60 |
$50.00 |
$49.70 |
$40.00 |
$55.00 |
$41.25 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 670 | TON |
$40.00 |
$39.09 |
$36.45 |
$38.75 |
$44.00 |
$40.80 |
$32.00 |
$45.00 |
$35.66 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 92 | LF |
$25.00 |
$30.90 |
$34.13 |
$35.00 |
$35.00 |
$60.00 |
$27.00 |
$25.00 |
$23.78 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$30.90 |
$23.33 |
$25.00 |
$35.00 |
$32.50 |
$20.00 |
$25.00 |
$23.78 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$22,660.00 |
$23,760.00 |
$20,000.00 |
$85,000.00 |
$64,050.00 |
$60,000.00 |
$35,000.00 |
$47,000.00 |
| 69 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 7,536 | LF |
$0.2000 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.2600 |
$0.1000 |
$0.1500 |
$0.3000 |
| 70 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,180 | EA |
$0.5400 |
$1.03 |
$1.08 |
$1.04 |
$1.00 |
$0.8800 |
$1.00 |
$1.20 |
$1.01 |
| 71 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,420 | LF |
$0.2500 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1200 |
| 72 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,625 | SD |
$0.2200 |
$0.2600 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.3600 |
$0.2500 |
$0.3000 |
$0.4200 |
| 73 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,530 | SD |
$0.8800 |
$0.5200 |
$0.5400 |
$0.5200 |
$0.5000 |
$1.55 |
$0.5000 |
$0.7500 |
$1.78 |
| 74 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,105 | SD |
$2.00 |
$0.5200 |
$0.5400 |
$0.5200 |
$0.5000 |
$2.05 |
$0.5000 |
$0.7500 |
$2.38 |
| 75 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,920 | SD |
$2.00 |
$0.2600 |
$0.2700 |
$0.2800 |
$0.2500 |
$0.5100 |
$0.2500 |
$0.4000 |
$0.5900 |
| 76 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.8800 |
$1.03 |
$1.08 |
$1.04 |
$1.00 |
$2.05 |
$1.00 |
$1.25 |
$2.38 |
| 77 | 880(D) 8854 |
VERTICAL PANELS | 14,490 | SD |
$0.1800 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.2600 |
$0.1000 |
$0.1500 |
$0.3000 |
| 78 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,385 | SD |
$1.00 |
$2.06 |
$2.16 |
$2.10 |
$2.00 |
$0.5100 |
$2.00 |
$2.25 |
$0.5900 |
| 79 | 880(F) 8878 |
DRUMS | 7,560 | SD |
$0.7500 |
$0.1000 |
$0.1100 |
$0.1400 |
$0.1000 |
$0.2600 |
$0.1000 |
$0.1500 |
$0.3000 |
| 80 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$16.30 |
$10.30 |
$10.80 |
$10.40 |
$10.00 |
$10.30 |
$10.00 |
$12.50 |
$11.89 |
| 81 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.24 | CY |
$485.00 |
$515.00 |
$540.00 |
$525.00 |
$500.00 |
$772.50 |
$500.00 |
$550.00 |
$891.63 |
| 82 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$45.00 |
$25.75 |
$27.00 |
$35.00 |
$25.00 |
$25.80 |
$25.00 |
$30.00 |
$29.72 |
| 83 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 24 | SF |
$19.25 |
$25.75 |
$27.00 |
$30.00 |
$25.00 |
$20.60 |
$25.00 |
$30.00 |
$23.78 |
| 84 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 48 | LF |
$14.75 |
$15.45 |
$16.20 |
$17.25 |
$15.00 |
$18.50 |
$15.00 |
$18.00 |
$21.40 |
| 85 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 10,413 | LF |
$0.6000 |
$0.5600 |
$0.5800 |
$0.5800 |
$0.5400 |
$0.4600 |
$0.5400 |
$0.6500 |
$0.5300 |
| 86 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,100.00 |
$15,965.00 |
$15,660.00 |
$16,500.00 |
$17,500.00 |
$14,935.00 |
$20,000.00 |
$32,750.00 |
$11,888.11 |
| 87 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,200.00 |
$3,090.00 |
$4,320.00 |
$3,000.00 |
$1,275.00 |
$3,509.00 |
$3,000.00 |
$7,250.00 |
$2,972.03 |
| 88 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,725.00 |
$5,665.00 |
$15,120.00 |
$10,500.00 |
$5,000.00 |
$2,699.00 |
$6,000.00 |
$12,750.00 |
$1,783.22 |
| 89 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$101,426.17 |
$155,974.87 |
$110,000.00 |
$169,000.00 |
$298,600.26 |
$165,000.00 |
$300,000.00 |
$175,000.00 |