| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$12,789.00 |
$25,000.00 |
$1,155.00 |
$25,000.00 |
$15,975.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 394 | CY |
$13.00 |
$25.00 |
$25.00 |
$21.00 |
$25.00 |
$9.59 |
$17.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,671 | CY |
$14.00 |
$21.25 |
$15.00 |
$13.23 |
$22.00 |
$13.85 |
$31.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$12,750.00 |
$12,000.00 |
$8,925.00 |
$20,000.00 |
$15,975.00 |
$20,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 640 | LF |
$2.50 |
$5.00 |
$3.00 |
$2.00 |
$3.50 |
$2.08 |
$2.10 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$9.50 |
$12.00 |
$7.00 |
$15.70 |
$13.85 |
$15.92 |
$7.76 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,933 | SY |
$1.75 |
$3.00 |
$3.00 |
$2.10 |
$2.10 |
$2.08 |
$2.90 |
| 8 | 230(F) 2812 |
WATERING | 238 | KGAL |
$7.00 |
$1.00 |
$6.00 |
$13.60 |
$12.95 |
$30.37 |
$7.50 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.23 | AC |
$300.00 |
$550.00 |
$300.00 |
$209.00 |
$200.00 |
$211.93 |
$328.17 |
| 10 | 234(A) 2824 |
FERTILIZING (10-20-10) | 1 | TON |
$500.00 |
$750.00 |
$900.00 |
$835.00 |
$825.00 |
$846.68 |
$750.00 |
| 11 | 241 2832 |
MOWING | 1.23 | AC |
$65.00 |
$55.00 |
$10.00 |
$310.00 |
$295.00 |
$314.18 |
$115.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 354 | CY |
$50.00 |
$56.00 |
$75.00 |
$68.50 |
$75.00 |
$60.71 |
$69.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 1,925 | SY |
$1.50 |
$2.25 |
$2.00 |
$1.80 |
$2.00 |
$1.81 |
$1.23 |
| 14 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 200 | SY |
$4.00 |
$5.50 |
$5.00 |
$3.73 |
$5.00 |
$3.30 |
$1.83 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 496 | TON |
$30.00 |
$24.95 |
$55.00 |
$30.52 |
$35.00 |
$37.28 |
$35.42 |
| 16 | 407(B) 0250 |
TACK COAT | 432 | GAL |
$3.00 |
$5.25 |
$5.00 |
$4.60 |
$5.00 |
$4.69 |
$5.00 |
| 17 | 408 5774 |
PRIME COAT | 1,092 | GAL |
$5.00 |
$5.90 |
$6.00 |
$5.80 |
$5.50 |
$5.86 |
$6.50 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 681 | TON |
$100.00 |
$147.32 |
$150.00 |
$140.40 |
$140.00 |
$142.37 |
$156.48 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 1,438 | SY |
$10.00 |
$7.33 |
$7.50 |
$6.60 |
$7.00 |
$6.11 |
$7.50 |
| 20 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 46 | LF |
$20.00 |
$10.00 |
$10.00 |
$21.00 |
$22.50 |
$31.95 |
$15.78 |
| 21 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 16 | LF |
$20.00 |
$10.00 |
$10.00 |
$21.00 |
$31.00 |
$31.95 |
$13.33 |
| 22 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$500.00 |
$750.00 |
$600.00 |
$630.00 |
$600.00 |
$532.50 |
$1,113.51 |
| 23 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 10 | CY |
$55.00 |
$100.00 |
$60.00 |
$79.70 |
$100.00 |
$31.95 |
$63.60 |
| 24 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 6 | CY |
$55.00 |
$100.00 |
$60.00 |
$79.70 |
$100.00 |
$47.93 |
$60.00 |
| 25 | 613(V) 1180 |
TRENCH EXCAVATION | 19 | CY |
$17.00 |
$25.00 |
$10.00 |
$10.50 |
$25.00 |
$53.25 |
$28.19 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 232 | SY |
$5.00 |
$5.00 |
$6.00 |
$3.70 |
$15.00 |
$3.69 |
$30.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,381 | LF |
$4.00 |
$2.25 |
$5.00 |
$2.60 |
$4.00 |
$2.37 |
$14.36 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 1,223 | LF |
$5.00 |
$7.75 |
$6.00 |
$6.30 |
$4.00 |
$5.33 |
$7.03 |
| 29 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$18.00 |
$17.77 |
$25.00 |
$16.50 |
$17.00 |
$16.77 |
$18.50 |
| 30 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,689.00 |
$2,500.00 |
$2,257.50 |
$2,500.00 |
$2,289.75 |
$2,500.00 |
| 31 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$1,900.00 |
$1,733.00 |
$1,800.00 |
$1,548.75 |
$3,000.00 |
$1,570.88 |
$1,800.00 |
| 32 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$18.00 |
$33.00 |
$15.00 |
$13.12 |
$15.00 |
$13.31 |
$15.00 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 270 | CY |
$25.00 |
$25.00 |
$25.00 |
$18.90 |
$36.82 |
$16.29 |
$20.00 |
| 34 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 20 | CY |
$100.00 |
$25.00 |
$50.00 |
$105.00 |
$189.36 |
$178.66 |
$64.00 |
| 35 | 501(G) 6309 |
CLSM BACKFILL | 214.6 | CY |
$150.00 |
$175.00 |
$200.00 |
$216.50 |
$263.00 |
$139.24 |
$147.38 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$200.00 |
$225.00 |
$210.00 |
$213.20 |
$315.60 |
$213.40 |
$189.02 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 1,076.3 | SY |
$5.00 |
$5.33 |
$5.00 |
$5.30 |
$4.50 |
$4.31 |
$4.70 |
| 38 | 504(C) 6250 |
SEALED EXPANSION JOINT | 98 | LF |
$300.00 |
$222.00 |
$250.00 |
$271.00 |
$410.27 |
$248.01 |
$333.34 |
| 39 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 484.6 | LF |
$100.00 |
$61.00 |
$110.00 |
$84.00 |
$142.02 |
$274.79 |
$140.00 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 174,610 | LB |
$2.00 |
$1.95 |
$2.61 |
$1.90 |
$2.63 |
$2.00 |
$1.75 |
| 41 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,000.00 |
$1,750.00 |
$1,800.00 |
$1,413.30 |
$2,629.96 |
$1,700.00 |
$1,748.41 |
| 42 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$2,000.00 |
$1,750.00 |
$1,800.00 |
$1,413.30 |
$2,629.96 |
$1,700.00 |
$1,748.50 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 204.5 | CY |
$750.00 |
$595.00 |
$950.00 |
$812.70 |
$1,472.78 |
$750.00 |
$1,100.00 |
| 44 | 509(B) 1328 |
CLASS A CONCRETE | 294.6 | CY |
$700.00 |
$595.00 |
$1,200.00 |
$812.70 |
$525.99 |
$700.00 |
$550.00 |
| 45 | 509(D) 1331 |
CLASS C CONCRETE | 5 | CY |
$900.00 |
$1,000.00 |
$1,000.00 |
$735.00 |
$1,020.43 |
$1,353.20 |
$715.34 |
| 46 | 511 6306 |
MECHANICAL SPLICES | 638 | EA |
$30.00 |
$20.00 |
$18.00 |
$12.60 |
$25.25 |
$18.05 |
$25.00 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 80,780 | LB |
$1.25 |
$1.11 |
$1.10 |
$1.15 |
$1.68 |
$1.25 |
$1.09 |
| 48 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 560 | SY |
$5.00 |
$6.25 |
$5.00 |
$3.80 |
$4.00 |
$3.73 |
$4.16 |
| 49 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 74 | LF |
$500.00 |
$388.00 |
$500.00 |
$483.00 |
$350.00 |
$380.13 |
$594.00 |
| 50 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 88 | LF |
$850.00 |
$503.00 |
$550.00 |
$827.40 |
$650.00 |
$523.59 |
$1,000.00 |
| 51 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 32 | LF |
$975.00 |
$1,175.00 |
$1,250.00 |
$1,474.00 |
$1,500.00 |
$920.34 |
$1,600.00 |
| 52 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,000.00 |
$1,750.00 |
$5,000.00 |
$2,914.00 |
$2,500.00 |
$1,890.38 |
$3,964.31 |
| 53 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$30.00 |
$12.50 |
$65.00 |
$52.50 |
$37.08 |
$53.25 |
$33.29 |
| 54 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1.3 | GAL |
$150.00 |
$250.00 |
$150.00 |
$94.50 |
$105.20 |
$95.85 |
$102.05 |
| 55 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$750.00 |
$375.00 |
$800.00 |
$756.00 |
$911.54 |
$766.80 |
$602.49 |
| 56 | 523(A) 6550 |
SEALER CRACK PREPARATION | 182.2 | LF |
$5.00 |
$7.00 |
$5.00 |
$4.20 |
$5.00 |
$4.26 |
$4.36 |
| 57 | 523(B) 6560 |
SEALER RESIN | 2.3 | GAL |
$100.00 |
$250.00 |
$150.00 |
$105.00 |
$150.00 |
$106.50 |
$112.62 |
| 58 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$8,000.00 |
$12,500.00 |
$10,000.00 |
$2,500.00 |
$15,779.79 |
$8,103.47 |
$18,000.00 |
| 59 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$60.00 |
$250.00 |
$60.00 |
$58.00 |
$53.13 |
$58.58 |
$41.41 |
| 60 | 542 4600 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$125,000.00 |
$125,000.00 |
$73,000.00 |
$174,300.00 |
$168,317.72 |
$127,431.27 |
$135,000.00 |
| 61 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$47,500.00 |
$50,000.00 |
$73,500.00 |
$220,916.57 |
$400,000.00 |
$85,000.00 |
| 62 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 330 | CY |
$25.00 |
$22.00 |
$25.00 |
$31.50 |
$36.82 |
$21.72 |
$20.00 |
| 63 | 501(G) 6309 |
CLSM BACKFILL | 167.8 | CY |
$150.00 |
$175.00 |
$200.00 |
$237.50 |
$263.00 |
$139.24 |
$147.38 |
| 64 | 504(A) 1304 |
APPROACH SLAB | 187.6 | SY |
$200.00 |
$225.00 |
$210.00 |
$252.00 |
$315.60 |
$293.56 |
$189.02 |
| 65 | 504(B) 1305 |
SAW-CUT GROOVING | 341.2 | SY |
$5.00 |
$7.75 |
$10.00 |
$10.10 |
$9.50 |
$9.16 |
$10.00 |
| 66 | 504(C) 6250 |
SEALED EXPANSION JOINT | 41.9 | LF |
$300.00 |
$225.00 |
$250.00 |
$313.00 |
$410.27 |
$263.13 |
$333.34 |
| 67 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 153.6 | LF |
$100.00 |
$77.00 |
$150.00 |
$115.50 |
$142.02 |
$284.44 |
$140.00 |
| 68 | 506(A) 1322 |
STRUCTURAL STEEL | 24,170 | LB |
$2.00 |
$2.66 |
$2.61 |
$4.12 |
$2.63 |
$2.00 |
$1.88 |
| 69 | 506(A) 6005 |
STRUCTURAL STEEL A36 | 240 | LB |
$2.00 |
$5.00 |
$5.00 |
$5.00 |
$8.94 |
$61.56 |
$8.48 |
| 70 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$2,000.00 |
$1,750.00 |
$1,650.00 |
$1,473.15 |
$2,629.96 |
$1,700.00 |
$1,748.41 |
| 71 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$2,000.00 |
$1,750.00 |
$1,650.00 |
$1,473.15 |
$2,629.96 |
$1,700.00 |
$1,748.50 |
| 72 | 509(A) 1326 |
CLASS AA CONCRETE | 41.4 | CY |
$750.00 |
$1,125.00 |
$950.00 |
$1,495.20 |
$1,893.57 |
$1,266.85 |
$1,000.00 |
| 73 | 509(B) 1328 |
CLASS A CONCRETE | 116.8 | CY |
$700.00 |
$888.00 |
$900.00 |
$1,495.20 |
$1,262.38 |
$1,245.00 |
$500.00 |
| 74 | 509(D) 1331 |
CLASS C CONCRETE | 5 | CY |
$900.00 |
$1,000.00 |
$1,000.00 |
$630.00 |
$1,020.43 |
$1,340.72 |
$715.34 |
| 75 | 511 6306 |
MECHANICAL SPLICES | 131 | EA |
$30.00 |
$20.00 |
$15.00 |
$12.60 |
$25.25 |
$21.48 |
$20.00 |
| 76 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 29,420 | LB |
$1.25 |
$1.25 |
$1.10 |
$1.15 |
$1.68 |
$1.25 |
$1.09 |
| 77 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 197 | SY |
$5.00 |
$7.00 |
$6.00 |
$3.80 |
$4.00 |
$3.73 |
$4.16 |
| 78 | 516(A) 6089 |
DRILLED SHAFTS 18" DIAMETER | 98 | LF |
$500.00 |
$388.00 |
$550.00 |
$450.50 |
$350.00 |
$329.34 |
$600.00 |
| 79 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 46 | LF |
$975.00 |
$1,250.00 |
$1,150.00 |
$1,390.00 |
$1,500.00 |
$921.39 |
$1,650.00 |
| 80 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$1,750.00 |
$5,000.00 |
$2,914.00 |
$2,500.00 |
$1,890.38 |
$3,964.31 |
| 81 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$30.00 |
$6.33 |
$6.00 |
$52.50 |
$37.08 |
$53.25 |
$33.29 |
| 82 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$150.00 |
$250.00 |
$150.00 |
$94.50 |
$105.20 |
$95.85 |
$102.05 |
| 83 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$750.00 |
$375.00 |
$800.00 |
$756.00 |
$911.54 |
$766.80 |
$602.49 |
| 84 | 523(A) 6550 |
SEALER CRACK PREPARATION | 36.8 | LF |
$5.00 |
$6.99 |
$5.00 |
$4.20 |
$5.00 |
$4.26 |
$4.36 |
| 85 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$100.00 |
$250.00 |
$150.00 |
$105.00 |
$150.00 |
$106.50 |
$112.62 |
| 86 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$12,500.00 |
$5,000.00 |
$2,500.00 |
$8,415.89 |
$1,200.00 |
$6,000.00 |
| 87 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$60.00 |
$50.00 |
$55.00 |
$58.00 |
$53.13 |
$58.58 |
$41.41 |
| 88 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$47,500.00 |
$25,000.00 |
$210,000.00 |
$63,119.02 |
$155,337.49 |
$35,000.00 |
| 89 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 240 | SD |
$140.00 |
$225.00 |
$110.00 |
$105.00 |
$100.00 |
$197.03 |
$200.00 |
| 90 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,500 | LF |
$0.2000 |
$0.5500 |
$0.5500 |
$0.5200 |
$0.6000 |
$0.7500 |
$0.6000 |
| 91 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 150 | LF |
$0.8000 |
$0.2500 |
$3.30 |
$3.15 |
$3.50 |
$3.20 |
$3.50 |
| 92 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$1.00 |
$0.6000 |
$2.20 |
$2.10 |
$2.00 |
$2.13 |
$2.40 |
| 93 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 480 | SD |
$10.00 |
$20.00 |
$5.50 |
$5.25 |
$5.00 |
$5.33 |
$5.85 |
| 94 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$23.00 |
$15.00 |
$35.00 |
$26.25 |
$50.00 |
$25.00 |
$41.00 |
| 95 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$3.85 |
$10.00 |
$5.00 |
$2.10 |
$4.00 |
$2.00 |
$2.34 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,920 | SD |
$0.3500 |
$0.5000 |
$1.10 |
$1.10 |
$1.00 |
$1.07 |
$1.20 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$0.8000 |
$2.25 |
$3.30 |
$3.20 |
$3.25 |
$3.20 |
$3.50 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,120 | SD |
$1.25 |
$2.25 |
$2.20 |
$2.10 |
$2.00 |
$2.13 |
$2.40 |
| 99 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$1.20 |
$2.25 |
$1.10 |
$1.00 |
$1.00 |
$1.07 |
$1.20 |
| 100 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,640 | SD |
$0.4500 |
$0.6000 |
$0.5500 |
$0.5300 |
$0.5000 |
$0.5300 |
$0.6000 |
| 101 | 880(F) 8878 |
DRUMS | 4,800 | SD |
$0.2000 |
$0.4500 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.3000 |
| 102 | 880(G) 8890 |
CHANNELIZER CONES | 7,200 | SD |
$0.3500 |
$0.4500 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.3000 |
| 103 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 508 | SD |
$13.80 |
$20.00 |
$12.00 |
$10.50 |
$10.00 |
$10.65 |
$11.71 |
| 104 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 30 | EA |
$66.55 |
$15.00 |
$55.00 |
$52.50 |
$60.00 |
$53.25 |
$60.00 |
| 105 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$170.00 |
$250.00 |
$165.00 |
$157.50 |
$175.00 |
$159.75 |
$200.00 |
| 106 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 81.36 | SF |
$16.45 |
$20.00 |
$16.00 |
$14.70 |
$15.00 |
$14.91 |
$20.00 |
| 107 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 177 | LF |
$8.50 |
$15.00 |
$10.00 |
$8.40 |
$9.00 |
$8.52 |
$13.00 |
| 108 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,000 | LF |
$0.4500 |
$1.12 |
$1.10 |
$1.05 |
$1.10 |
$1.07 |
$1.17 |
| 109 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$21,750.00 |
$25,000.00 |
$20,475.00 |
$45,000.00 |
$26,625.00 |
$20,000.00 |
| 110 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,936 | CY |
$12.00 |
$9.00 |
$12.00 |
$9.70 |
$12.50 |
$9.59 |
$14.50 |
| 111 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,034 | CY |
$14.00 |
$12.75 |
$10.00 |
$9.70 |
$16.25 |
$13.85 |
$35.00 |
| 112 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$21,750.00 |
$18,000.00 |
$9,450.00 |
$30,000.00 |
$21,300.00 |
$25,000.00 |
| 113 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$9.30 |
$20.00 |
$3.00 |
$15.70 |
$14.20 |
$15.92 |
$7.76 |
| 114 | 221(K) 0600 |
TEMPORARY FIBER LOG | 379 | LF |
$3.00 |
$25.00 |
$7.00 |
$3.10 |
$9.25 |
$3.14 |
$4.39 |
| 115 | 230(A) 2806 |
SOLID SLAB SODDING | 40,200 | SY |
$1.75 |
$1.55 |
$2.00 |
$1.20 |
$1.25 |
$1.21 |
$1.65 |
| 116 | 230(F) 2812 |
WATERING | 1,608 | KGAL |
$6.00 |
$1.00 |
$7.00 |
$13.60 |
$13.00 |
$30.37 |
$10.85 |
| 117 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.31 | AC |
$300.00 |
$550.00 |
$350.00 |
$209.00 |
$200.00 |
$211.94 |
$390.00 |
| 118 | 234(A) 2824 |
FERTILIZING (10-20-10) | 5 | TON |
$500.00 |
$750.00 |
$800.00 |
$834.75 |
$825.00 |
$846.68 |
$700.00 |
| 119 | 234(A) 4409 |
FERTILIZING (18-46-0) | 1 | TON |
$770.00 |
$750.00 |
$800.00 |
$834.75 |
$2,000.00 |
$846.68 |
$700.00 |
| 120 | 241 2832 |
MOWING | 8.31 | AC |
$65.00 |
$55.00 |
$10.00 |
$309.75 |
$295.00 |
$314.17 |
$115.00 |
| 121 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,232 | CY |
$50.00 |
$51.25 |
$65.00 |
$66.50 |
$64.00 |
$60.71 |
$74.00 |
| 122 | 325 5271 |
SEPARATOR FABRIC | 10,480 | SY |
$1.50 |
$1.55 |
$2.00 |
$1.83 |
$1.75 |
$1.81 |
$1.23 |
| 123 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 10,480 | SY |
$4.00 |
$3.05 |
$3.00 |
$2.15 |
$2.00 |
$3.30 |
$1.25 |
| 124 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,066 | TON |
$30.00 |
$27.75 |
$40.00 |
$31.45 |
$32.00 |
$37.28 |
$37.01 |
| 125 | 407(B) 0250 |
TACK COAT | 1,939 | GAL |
$3.00 |
$4.45 |
$4.50 |
$4.30 |
$5.00 |
$4.37 |
$4.80 |
| 126 | 408 5774 |
PRIME COAT | 8,331 | GAL |
$5.00 |
$6.00 |
$5.50 |
$5.20 |
$5.00 |
$5.33 |
$6.00 |
| 127 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 837 | TON |
$100.00 |
$99.00 |
$100.00 |
$95.43 |
$95.00 |
$96.80 |
$106.39 |
| 128 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,604 | TON |
$95.00 |
$82.85 |
$90.00 |
$78.00 |
$78.00 |
$79.09 |
$86.93 |
| 129 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 558 | TON |
$110.00 |
$122.00 |
$120.00 |
$112.60 |
$112.00 |
$114.19 |
$125.51 |
| 130 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 821 | TON |
$100.00 |
$112.33 |
$112.00 |
$105.00 |
$105.00 |
$106.45 |
$117.00 |
| 131 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 72 | CY |
$25.00 |
$25.00 |
$25.00 |
$26.25 |
$100.00 |
$21.30 |
$65.00 |
| 132 | 509(A) 0319 |
CLASS AA CONCRETE | 388 | CY |
$570.00 |
$525.00 |
$650.00 |
$707.70 |
$500.00 |
$463.28 |
$1,060.00 |
| 133 | 509(D) 0325 |
CLASS C CONCRETE | 46.04 | CY |
$375.00 |
$275.00 |
$300.00 |
$340.20 |
$275.00 |
$289.96 |
$352.79 |
| 134 | 511(A) 0332 |
REINFORCING STEEL | 50,408 | LB |
$1.00 |
$1.01 |
$0.9000 |
$1.40 |
$0.8000 |
$1.02 |
$1.10 |
| 135 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 770 | LF |
$65.00 |
$45.00 |
$60.00 |
$68.80 |
$57.25 |
$79.88 |
$75.00 |
| 136 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 100 | LF |
$130.00 |
$75.00 |
$92.00 |
$99.17 |
$95.00 |
$63.90 |
$117.50 |
| 137 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 258 | LF |
$33.00 |
$25.00 |
$30.00 |
$32.32 |
$27.50 |
$42.60 |
$30.00 |
| 138 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 378 | LF |
$20.00 |
$10.00 |
$6.00 |
$21.00 |
$11.00 |
$31.95 |
$15.78 |
| 139 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 126 | LF |
$20.00 |
$10.00 |
$6.00 |
$21.00 |
$13.00 |
$31.95 |
$13.33 |
| 140 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 8 | EA |
$1,270.00 |
$1,750.00 |
$1,200.00 |
$1,470.00 |
$1,500.00 |
$2,343.00 |
$2,848.56 |
| 141 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$500.00 |
$750.00 |
$600.00 |
$630.00 |
$500.00 |
$532.50 |
$1,113.51 |
| 142 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 101 | CY |
$55.00 |
$100.00 |
$55.00 |
$79.70 |
$75.00 |
$37.28 |
$65.00 |
| 143 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 63 | CY |
$55.00 |
$100.00 |
$60.00 |
$79.70 |
$80.00 |
$37.28 |
$60.00 |
| 144 | 613(V) 1180 |
TRENCH EXCAVATION | 152 | CY |
$17.00 |
$25.00 |
$10.00 |
$10.40 |
$18.00 |
$53.25 |
$6.02 |
| 145 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$12,750.00 |
$20,000.00 |
$17,955.00 |
$20,000.00 |
$3,804.18 |
$15,000.00 |
| 146 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,708 | SY |
$5.00 |
$2.25 |
$5.00 |
$5.90 |
$5.00 |
$3.69 |
$11.50 |
| 147 | 619(C) 0924 |
SAWING PAVEMENT | 3,936 | LF |
$5.00 |
$7.75 |
$6.00 |
$10.50 |
$4.00 |
$5.33 |
$6.00 |
| 148 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,288 | LF |
$18.00 |
$17.77 |
$20.00 |
$16.50 |
$17.00 |
$16.77 |
$18.50 |
| 149 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,675.00 |
$2,400.00 |
$2,257.50 |
$2,500.00 |
$2,289.75 |
$2,500.00 |
| 150 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,768.00 |
$1,800.00 |
$1,548.75 |
$3,000.00 |
$1,570.88 |
$1,700.00 |
| 151 | 624(A) 4281 |
FENCE-STYLE WWF | 64 | LF |
$20.00 |
$10.00 |
$10.00 |
$6.30 |
$6.50 |
$6.38 |
$10.00 |
| 152 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$925.00 |
$1,100.00 |
$500.00 |
$787.50 |
$800.00 |
$798.75 |
$1,000.00 |
| 153 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,970 | LF |
$5.00 |
$6.75 |
$5.75 |
$4.40 |
$4.50 |
$4.46 |
$10.05 |
| 154 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 442 | LF |
$6.00 |
$7.77 |
$6.00 |
$4.70 |
$5.00 |
$4.78 |
$8.50 |
| 155 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$75.00 |
$125.00 |
$50.00 |
$105.00 |
$110.00 |
$106.50 |
$120.00 |
| 156 | 629(C) 4960 |
MAILBOX | 2 | EA |
$50.00 |
$125.00 |
$75.00 |
$52.50 |
$60.00 |
$53.25 |
$60.00 |
| 157 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$70.00 |
$125.00 |
$50.00 |
$26.25 |
$27.50 |
$26.63 |
$100.00 |
| 158 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 33 | EA |
$18.00 |
$33.00 |
$15.00 |
$13.12 |
$15.00 |
$13.31 |
$15.00 |
| 159 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$30.00 |
$22.00 |
$25.00 |
$21.00 |
$75.00 |
$21.72 |
$20.00 |
| 160 | 501(G) 6309 |
CLSM BACKFILL | 193.4 | CY |
$165.00 |
$175.00 |
$200.00 |
$216.50 |
$180.00 |
$139.24 |
$147.38 |
| 161 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,943.36 | LF |
$220.00 |
$235.00 |
$240.00 |
$256.70 |
$245.00 |
$217.30 |
$251.00 |
| 162 | 504(A) 1304 |
APPROACH SLAB | 281.6 | SY |
$195.00 |
$222.00 |
$250.00 |
$234.15 |
$200.00 |
$190.15 |
$189.02 |
| 163 | 504(B) 1305 |
SAW-CUT GROOVING | 13,805.2 | SY |
$4.00 |
$3.59 |
$5.00 |
$4.60 |
$3.40 |
$3.35 |
$4.00 |
| 164 | 504(C) 6250 |
SEALED EXPANSION JOINT | 86.34 | LF |
$280.00 |
$225.00 |
$250.00 |
$302.50 |
$240.00 |
$344.98 |
$333.34 |
| 165 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 905 | LF |
$90.00 |
$62.59 |
$110.00 |
$84.00 |
$75.00 |
$113.14 |
$140.00 |
| 166 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 1,920 | LB |
$2.65 |
$3.61 |
$2.50 |
$2.43 |
$2.00 |
$3.05 |
$3.85 |
| 167 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$1,800.00 |
$1,536.00 |
$1,800.00 |
$1,613.85 |
$2,000.00 |
$1,700.00 |
$1,748.41 |
| 168 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,900.00 |
$1,536.00 |
$1,800.00 |
$1,613.85 |
$2,000.00 |
$1,385.19 |
$1,748.50 |
| 169 | 509(A) 1326 |
CLASS AA CONCRETE | 451.2 | CY |
$550.00 |
$625.00 |
$1,000.00 |
$865.20 |
$600.00 |
$750.00 |
$1,060.00 |
| 170 | 509(B) 1328 |
CLASS A CONCRETE | 221.2 | CY |
$595.00 |
$600.00 |
$1,050.00 |
$865.20 |
$1,125.00 |
$1,245.00 |
$700.00 |
| 171 | 509(D) 1331 |
CLASS C CONCRETE | 8.8 | CY |
$770.00 |
$1,000.00 |
$1,000.00 |
$630.00 |
$900.00 |
$1,054.67 |
$715.34 |
| 172 | 511 6306 |
MECHANICAL SPLICES | 124 | EA |
$30.00 |
$100.00 |
$21.00 |
$45.15 |
$35.00 |
$21.47 |
$30.42 |
| 173 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 142,220 | LB |
$1.06 |
$1.11 |
$1.10 |
$1.15 |
$1.00 |
$1.25 |
$1.09 |
| 174 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 30 | SY |
$325.00 |
$300.00 |
$250.00 |
$472.50 |
$550.00 |
$479.25 |
$500.00 |
| 175 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 15 | SY |
$475.00 |
$450.00 |
$300.00 |
$1,029.00 |
$1,000.00 |
$1,043.70 |
$850.00 |
| 176 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 94 | LF |
$38.00 |
$28.40 |
$45.00 |
$39.90 |
$50.00 |
$24.37 |
$23.00 |
| 177 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 342 | LF |
$42.00 |
$36.40 |
$55.00 |
$47.25 |
$50.00 |
$30.89 |
$29.00 |
| 178 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 94 | LF |
$13.00 |
$10.00 |
$15.00 |
$21.00 |
$20.00 |
$30.64 |
$75.00 |
| 179 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 342 | LF |
$15.00 |
$10.00 |
$15.00 |
$15.75 |
$25.00 |
$36.12 |
$35.00 |
| 180 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 181 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,642 | SY |
$3.50 |
$3.95 |
$5.00 |
$4.88 |
$3.50 |
$3.20 |
$4.16 |
| 182 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 243 | LF |
$900.00 |
$1,250.00 |
$630.00 |
$1,425.90 |
$1,250.00 |
$1,230.44 |
$750.00 |
| 183 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,000.00 |
$1,750.00 |
$5,000.00 |
$2,913.75 |
$2,500.00 |
$1,890.38 |
$3,964.31 |
| 184 | 523(A) 6550 |
SEALER CRACK PREPARATION | 434 | LF |
$4.00 |
$3.95 |
$5.00 |
$4.20 |
$5.00 |
$4.26 |
$4.75 |
| 185 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$80.00 |
$250.00 |
$150.00 |
$105.00 |
$150.00 |
$106.50 |
$117.00 |
| 186 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 260 | TON |
$45.00 |
$67.50 |
$50.00 |
$56.70 |
$45.00 |
$52.43 |
$55.89 |
| 187 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 50 | TON |
$36.00 |
$52.50 |
$40.00 |
$47.25 |
$40.00 |
$42.35 |
$40.00 |
| 188 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 88 | LF |
$14.00 |
$25.00 |
$25.00 |
$26.25 |
$20.00 |
$24.31 |
$15.00 |
| 189 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$14.00 |
$25.00 |
$20.00 |
$26.25 |
$25.00 |
$17.80 |
$26.42 |
| 190 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$79,000.00 |
$47,500.00 |
$175,000.00 |
$180,600.00 |
$80,000.00 |
$549,604.61 |
$200,000.00 |
| 191 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 330 | SD |
$140.00 |
$225.00 |
$110.00 |
$105.00 |
$100.00 |
$106.50 |
$117.06 |
| 192 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 150 | LF |
$0.8000 |
$2.20 |
$3.30 |
$3.15 |
$3.50 |
$3.20 |
$3.50 |
| 193 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,000 | EA |
$1.00 |
$0.6000 |
$2.20 |
$2.10 |
$2.00 |
$2.13 |
$2.40 |
| 194 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 660 | SD |
$10.00 |
$20.00 |
$5.50 |
$5.25 |
$5.00 |
$5.33 |
$5.85 |
| 195 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,500 | LF |
$23.00 |
$15.00 |
$35.00 |
$26.25 |
$50.00 |
$25.00 |
$53.00 |
| 196 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,500 | LF |
$3.85 |
$10.00 |
$5.00 |
$3.15 |
$4.00 |
$2.00 |
$3.51 |
| 197 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,640 | SD |
$0.3500 |
$0.5000 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.4700 |
| 198 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 660 | SD |
$0.8000 |
$2.25 |
$3.30 |
$3.15 |
$3.25 |
$3.20 |
$3.50 |
| 199 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,290 | SD |
$1.25 |
$2.25 |
$1.10 |
$1.05 |
$1.00 |
$1.07 |
$1.20 |
| 200 | 880(C) 8848 |
WING BARRICADES | 1,320 | SD |
$1.00 |
$2.25 |
$0.5500 |
$0.5200 |
$0.5000 |
$0.5300 |
$0.9800 |
| 201 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,270 | SD |
$0.2500 |
$0.5600 |
$0.5500 |
$0.5200 |
$0.5000 |
$0.5300 |
$0.6000 |
| 202 | 880(F) 8878 |
DRUMS | 3,300 | SD |
$0.2000 |
$0.4000 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.3000 |
| 203 | 880(G) 8890 |
CHANNELIZER CONES | 13,860 | SD |
$0.3000 |
$0.4000 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.3000 |
| 204 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 688 | SD |
$13.80 |
$20.00 |
$12.00 |
$10.50 |
$10.00 |
$10.65 |
$11.71 |
| 205 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$40,000.00 |
$17,250.00 |
$15,000.00 |
$10,500.00 |
$12,500.00 |
$10,650.00 |
$12,000.00 |
| 206 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 11 | EA |
$66.55 |
$12.00 |
$55.00 |
$52.50 |
$60.00 |
$53.25 |
$59.00 |
| 207 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 69.6 | SF |
$16.45 |
$17.25 |
$16.00 |
$14.70 |
$15.00 |
$14.91 |
$22.00 |
| 208 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 109 | LF |
$8.50 |
$12.00 |
$10.00 |
$8.40 |
$9.00 |
$8.52 |
$10.00 |
| 209 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,800 | LF |
$0.4500 |
$1.25 |
$1.10 |
$1.05 |
$1.10 |
$1.07 |
$1.20 |
| 210 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$85,000.00 |
$27,500.00 |
$65,000.00 |
$26,250.00 |
$35,000.00 |
$35,571.00 |
$43,350.26 |
| 211 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$18,250.00 |
$5,000.00 |
$5,250.00 |
$2,000.00 |
$677.69 |
$4,000.00 |
| 212 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$12,500.00 |
$10,000.00 |
$12,600.00 |
$25,000.00 |
$32,232.75 |
$34,000.00 |
| 213 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$312,000.00 |
$350,000.00 |
$250,000.00 |
$335,738.85 |
$450,000.00 |
$350,000.00 |
$392,400.00 |