| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,170 | CY |
$13.13 |
$10.00 |
$12.00 |
$32.44 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,170 | CY |
$19.17 |
$10.00 |
$20.00 |
$32.44 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$15,000.00 |
$7,337.24 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,850 | LF |
$1.53 |
$2.00 |
$2.25 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$8.41 |
$17.00 |
$10.00 |
$10.00 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 250 | LF |
$3.93 |
$10.00 |
$2.63 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,670 | SY |
$1.67 |
$3.30 |
$3.30 |
$4.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,100 | CY |
$57.59 |
$40.00 |
$40.00 |
$54.33 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 7,430 | SY |
$2.44 |
$1.00 |
$2.20 |
$2.94 |
| 10 | 317 4270 |
CEMENT TREATED BASE | 4,995 | SY |
$18.00 |
$6.50 |
$15.00 |
$19.73 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 15,265 | SY |
$1.35 |
$1.25 |
$1.69 |
$1.47 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 205 | TON |
$164.72 |
$63.00 |
$117.00 |
$145.34 |
| 13 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 590 | TON |
$165.00 |
$150.00 |
$400.00 |
$186.66 |
| 14 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 3,705 | SY |
$23.47 |
$35.00 |
$25.10 |
$23.71 |
| 15 | 414(C) 4425 |
CONT. REINF. P.C.C. PAVEMENT(PLACEMENT) | 1,150 | SY |
$40.00 |
$70.00 |
$89.00 |
$79.88 |
| 16 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 180 | SY |
$125.00 |
$60.00 |
$93.00 |
$89.96 |
| 17 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,500 | CY |
$118.69 |
$110.00 |
$125.00 |
$138.07 |
| 18 | 414(I) 5264 |
TYPE 2 TERMINAL JOINT | 1 | EA |
$4,000.00 |
$10,000.00 |
$1,000.00 |
$398.52 |
| 19 | 414(I) 5266 |
TYPE 3 TERMINAL JOINT | 1 | EA |
$7,000.00 |
$10,000.00 |
$3,000.00 |
$559.59 |
| 20 | 414(J) 5263 |
TERMINAL JOINT SLEEPER SLAB | 90 | SY |
$120.00 |
$100.00 |
$99.00 |
$95.95 |
| 21 | 504(E) 6190 |
42" F-SHAPED PARAPET | 588 | LF |
$87.54 |
$100.00 |
$100.00 |
$92.95 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$276.92 |
$600.00 |
$350.00 |
$484.25 |
| 23 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 500 | LF |
$25.00 |
$20.00 |
$1.00 |
$47.46 |
| 24 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 150 | SY |
$86.04 |
$65.00 |
$55.00 |
$20.92 |
| 25 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$3,070.47 |
$10,000.00 |
$3,000.00 |
$1,419.91 |
| 26 | 611(M) 4488 |
REPLACEMENT OF CAST IRON HOOD | 2 | EA |
$1,500.00 |
$550.00 |
$1,000.00 |
$442.57 |
| 27 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,620 | LF |
$7.80 |
$9.00 |
$10.00 |
$17.12 |
| 28 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 160 | LF |
$9.45 |
$9.00 |
$11.50 |
$11.85 |
| 29 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 8 | EA |
$437.58 |
$800.00 |
$500.00 |
$419.64 |
| 30 | 613(V) 1180 |
TRENCH EXCAVATION | 76 | CY |
$11.12 |
$15.00 |
$2.75 |
$11.74 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$85,000.00 |
$25,000.00 |
$15,063.35 |
| 32 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 6,110 | SY |
$7.71 |
$10.00 |
$5.00 |
$10.15 |
| 33 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 2 | EA |
$500.00 |
$2,500.00 |
$200.00 |
$733.71 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,090 | LF |
$3.89 |
$9.00 |
$11.50 |
$4.74 |
| 35 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 320 | SY |
$5.00 |
$9.00 |
$5.50 |
$9.06 |
| 36 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 560 | SY |
$5.00 |
$9.00 |
$10.00 |
$9.06 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 560 | LF |
$5.15 |
$5.00 |
$5.00 |
$6.61 |
| 38 | 620(C) 5910 |
CONTRACTOR HEALTH SAFETY PLAN | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$5,500.00 |
$35,000.00 |
| 39 | 620(C) 5920 |
CONTAMINATED MATERIALS MANAGEMENT PLAN | 1 | LSUM |
$30,000.00 |
$50,000.00 |
$20,000.00 |
$35,000.00 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 725 | LF |
$17.83 |
$16.00 |
$19.00 |
$15.50 |
| 41 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 5 | EA |
$2,437.83 |
$2,200.00 |
$2,450.00 |
$2,200.00 |
| 42 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 5 | EA |
$1,968.14 |
$1,800.00 |
$1,840.00 |
$1,800.00 |
| 43 | 802(A) 8302 |
1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 20 | LF |
$20.00 |
$35.00 |
$33.57 |
$31.50 |
| 44 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 30 | LF |
$30.00 |
$40.00 |
$39.00 |
$37.00 |
| 45 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 2 | EA |
$500.00 |
$1,700.00 |
$1,700.00 |
$1,600.00 |
| 46 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 2 | EA |
$7,000.00 |
$7,500.00 |
$7,500.00 |
$8,000.00 |
| 47 | 504(E) 6190 |
42" F-SHAPED PARAPET | 45.8 | LF |
$80.00 |
$100.00 |
$150.00 |
$175.00 |
| 48 | 509(B) 1328 |
CLASS A CONCRETE | 13.2 | CY |
$550.00 |
$800.00 |
$1,000.00 |
$650.00 |
| 49 | 510(A) 6334 |
RETAINING WALL | 65.6 | SY |
$1,735.00 |
$1,000.00 |
$3,000.00 |
$2,350.00 |
| 50 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,165 | LB |
$1.10 |
$2.00 |
$0.9000 |
$1.50 |
| 51 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,470 | CY |
$35.00 |
$150.00 |
$200.00 |
$35.00 |
| 52 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$50,000.00 |
$125,000.00 |
$22,000.00 |
$115,000.00 |
| 53 | 504(A) 1304 |
APPROACH SLAB | 579.9 | SY |
$225.00 |
$175.00 |
$200.00 |
$175.00 |
| 54 | 504(B) 1305 |
SAW-CUT GROOVING | 7,566.8 | SY |
$4.50 |
$4.00 |
$4.25 |
$4.00 |
| 55 | 504(C) 6250 |
SEALED EXPANSION JOINT | 467.6 | LF |
$350.00 |
$245.00 |
$250.00 |
$225.00 |
| 56 | 504(E) 1381 |
CONCRETE PARAPET | 1,101.1 | LF |
$155.00 |
$90.00 |
$200.00 |
$100.00 |
| 57 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,090.4 | LF |
$90.00 |
$65.00 |
$70.00 |
$100.00 |
| 58 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 44 | LF |
$30.00 |
$38.00 |
$20.00 |
$70.00 |
| 59 | 506(A) 1322 |
STRUCTURAL STEEL | 539,800 | LB |
$4.50 |
$2.30 |
$5.00 |
$6.00 |
| 60 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 30 | EA |
$2,000.00 |
$3,000.00 |
$1,850.00 |
$3,000.00 |
| 61 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$2,000.00 |
$3,000.00 |
$1,500.00 |
$3,000.00 |
| 62 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$15,000.00 |
$80,000.00 |
$25,000.00 |
$25,000.00 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 2,067.5 | CY |
$600.00 |
$750.00 |
$1,250.00 |
$450.00 |
| 64 | 509(B) 1328 |
CLASS A CONCRETE | 892.6 | CY |
$650.00 |
$750.00 |
$1,000.00 |
$1,500.00 |
| 65 | 509(D) 1331 |
CLASS C CONCRETE | 8.3 | CY |
$400.00 |
$600.00 |
$750.00 |
$650.00 |
| 66 | 511 6306 |
MECHANICAL SPLICES | 4,300 | EA |
$35.00 |
$40.00 |
$25.00 |
$20.00 |
| 67 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 659,370 | LB |
$1.10 |
$1.00 |
$1.00 |
$1.00 |
| 68 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$830,000.00 |
|
|
|
| 69 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$250,000.00 |
$200,000.00 |
$50,000.00 |
$35,000.00 |
| 70 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 30 | SY |
$350.00 |
$500.00 |
$500.00 |
$1,250.00 |
| 71 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,779 | SY |
$4.00 |
$4.00 |
$4.00 |
$4.00 |
| 72 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 81 | LF |
$1,500.00 |
$2,000.00 |
$2,000.00 |
$3,000.00 |
| 73 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 108 | LF |
$2,500.00 |
$2,700.00 |
$2,000.00 |
$3,250.00 |
| 74 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,500.00 |
$7,000.00 |
$5,000.00 |
$3,000.00 |
| 75 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 15 | LF |
$35.00 |
$58.00 |
$33.57 |
$32.00 |
| 76 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$100.00 |
$110.00 |
$45.00 |
$42.00 |
| 77 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 297.5 | SY |
$800.00 |
$780.00 |
$750.00 |
$800.00 |
| 78 | 523(A) 6550 |
SEALER CRACK PREPARATION | 1,645.2 | LF |
$4.00 |
$4.40 |
$4.36 |
$5.00 |
| 79 | 523(B) 6560 |
SEALER RESIN | 20 | GAL |
$120.00 |
$133.00 |
$100.00 |
$130.00 |
| 80 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 1,275 | SF |
$50.00 |
$38.00 |
$45.00 |
$42.50 |
| 81 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 248.7 | SY |
$35.00 |
$28.00 |
$55.00 |
$53.00 |
| 82 | 535 6280 |
REMOVE AND RE-ERECT STEEL BEAMS | 10 | EA |
$5,000.00 |
$10,000.00 |
$5,000.00 |
$7,500.00 |
| 83 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 4 | EA |
$5,000.00 |
$4,000.00 |
$5,000.00 |
$7,500.00 |
| 84 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 3 | EA |
$3,000.00 |
$2,500.00 |
$2,200.00 |
$20,000.00 |
| 85 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 3 | EA |
$2,500.00 |
$2,500.00 |
$1,000.00 |
$10,000.00 |
| 86 | 540 4545 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 14 | EA |
$2,000.00 |
$2,500.00 |
$2,000.00 |
$10,000.00 |
| 87 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$200,000.00 |
$600,000.00 |
$300,000.00 |
$500,000.00 |
| 88 | 542 4625 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE B) | 43 | EA |
$1,000.00 |
$2,500.00 |
$1,500.00 |
$2,500.00 |
| 89 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 10 | EA |
$1,500.00 |
$4,000.00 |
$2,200.00 |
$4,000.00 |
| 90 | 545 4825 |
(PL)REPLACE BRIDGE ITEM (TYPE B) | 5 | EA |
$500.00 |
$2,000.00 |
$1,000.00 |
$5,750.00 |
| 91 | 545 4835 |
(PL)REPLACE BRIDGE ITEM (TYPE C) | 5 | EA |
$1,500.00 |
$6,500.00 |
$2,250.00 |
$5,750.00 |
| 92 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 6 | EA |
$2,000.00 |
$6,000.00 |
$5,000.00 |
$10,500.00 |
| 93 | 619(B) 2525 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 2 | EA |
$8,000.00 |
$20,000.00 |
$5,000.00 |
$26,750.00 |
| 94 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$75,000.00 |
$80,000.00 |
$100,000.00 |
|
| 95 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 499.2 | SY |
$40.00 |
$15.00 |
$25.50 |
$30.00 |
| 96 | 619(B) 6319 |
REMOVAL OF DECK | 6,434.7 | SY |
$50.00 |
$90.00 |
$140.00 |
$112.50 |
| 97 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 630 | LF |
$150.00 |
$105.00 |
$38.75 |
$62.50 |
| 98 | 802(A) 8302 |
1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 120 | LF |
$20.00 |
$33.00 |
$33.57 |
$31.50 |
| 99 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 2,030 | LF |
$30.00 |
$40.00 |
$39.00 |
$37.00 |
| 100 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 32 | EA |
$500.00 |
$1,800.00 |
$1,700.00 |
$1,600.00 |
| 101 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 815 | CY |
$35.00 |
$265.00 |
$1,000.00 |
$23.42 |
| 102 | 502(C) 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$50,000.00 |
$100,000.00 |
$17,500.00 |
$36,686.18 |
| 103 | 504(A) 1304 |
APPROACH SLAB | 58 | SY |
$225.00 |
$175.00 |
$265.00 |
$275.39 |
| 104 | 504(B) 1305 |
SAW-CUT GROOVING | 1,952.4 | SY |
$4.50 |
$4.00 |
$4.25 |
$4.00 |
| 105 | 504(C) 6250 |
SEALED EXPANSION JOINT | 115.1 | LF |
$350.00 |
$245.00 |
$250.00 |
$284.76 |
| 106 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,517.1 | LF |
$90.00 |
$65.00 |
$100.00 |
$83.21 |
| 107 | 506(A) 1322 |
STRUCTURAL STEEL | 347,060 | LB |
$4.50 |
$3.30 |
$5.00 |
$7.80 |
| 108 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$3,000.00 |
$1,855.00 |
$3,791.89 |
| 109 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,000.00 |
$3,000.00 |
$1,500.00 |
$3,081.74 |
| 110 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$10,000.00 |
$80,000.00 |
$25,000.00 |
$13,000.00 |
| 111 | 509(A) 1326 |
CLASS AA CONCRETE | 503.9 | CY |
$600.00 |
$750.00 |
$1,500.00 |
$1,197.45 |
| 112 | 509(B) 1328 |
CLASS A CONCRETE | 488.6 | CY |
$650.00 |
$750.00 |
$1,000.00 |
$1,081.77 |
| 113 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 245,740 | LB |
$1.10 |
$1.00 |
$1.00 |
$1.22 |
| 114 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$260,000.00 |
$850,000.00 |
$300,000.00 |
$280,000.00 |
| 115 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$75,000.00 |
$200,000.00 |
$15,000.00 |
$12,500.00 |
| 116 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,536 | SY |
$4.00 |
$4.00 |
$4.16 |
$4.00 |
| 117 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 304 | LF |
$1,500.00 |
$2,000.00 |
$2,000.00 |
$1,725.00 |
| 118 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,500.00 |
$7,000.00 |
$5,000.00 |
$2,934.89 |
| 119 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 10 | LF |
$35.00 |
$58.00 |
$33.57 |
$32.00 |
| 120 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$100.00 |
$110.00 |
$45.00 |
$42.00 |
| 121 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 116.7 | SY |
$800.00 |
$780.00 |
$750.00 |
$725.00 |
| 122 | 523(A) 6550 |
SEALER CRACK PREPARATION | 346.7 | LF |
$4.00 |
$4.40 |
$4.36 |
$5.00 |
| 123 | 523(B) 6560 |
SEALER RESIN | 5 | GAL |
$120.00 |
$133.00 |
$100.00 |
$130.00 |
| 124 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 320 | SF |
$50.00 |
$38.00 |
$45.00 |
$42.50 |
| 125 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 94.8 | SY |
$35.00 |
$28.00 |
$55.00 |
$53.00 |
| 126 | 535 6280 |
REMOVE AND RE-ERECT STEEL BEAMS | 6 | EA |
$5,000.00 |
$10,000.00 |
$5,000.00 |
$5,377.40 |
| 127 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 3 | EA |
$5,000.00 |
$4,000.00 |
$5,000.00 |
$12,382.07 |
| 128 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 4 | EA |
$3,000.00 |
$2,500.00 |
$2,500.00 |
$12,345.38 |
| 129 | 542 4610 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 1 | LSUM |
$75,000.00 |
$500,000.00 |
$250,000.00 |
$485,538.72 |
| 130 | 542 4630 |
(PL)INSTALLATION OF BRIDGE ITEMS(TYPE C) | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$1,500.00 |
$4,750.00 |
| 131 | 545 4815 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 4 | EA |
$1,500.00 |
$4,000.00 |
$5,000.00 |
$3,167.80 |
| 132 | 545 4825 |
(PL)REPLACE BRIDGE ITEM (TYPE B) | 11 | EA |
$500.00 |
$2,000.00 |
$2,200.00 |
$5,180.31 |
| 133 | 545 4835 |
(PL)REPLACE BRIDGE ITEM (TYPE C) | 5 | EA |
$8,000.00 |
$6,500.00 |
$2,250.00 |
$5,876.12 |
| 134 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 2 | EA |
$2,000.00 |
$6,000.00 |
$1,250.00 |
$3,938.26 |
| 135 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$45,000.00 |
$80,000.00 |
$100,000.00 |
|
| 136 | 619(B) 2540 |
REMOVAL OF BRIDGE ITEM (TYPE D) | 1 | LSUM |
$25,000.00 |
$40,000.00 |
$5,500.00 |
$22,319.55 |
| 137 | 619(B) 6189 |
REMOVAL OF EXISTING SLAB | 54.4 | SY |
$40.00 |
$15.00 |
$100.00 |
$57.98 |
| 138 | 619(B) 6319 |
REMOVAL OF DECK | 1,356.6 | SY |
$50.00 |
$120.00 |
$140.00 |
$109.60 |
| 139 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 310 | LF |
$150.00 |
$215.00 |
$35.00 |
$62.50 |
| 140 | 802(A) 8302 |
1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 25 | LF |
$20.00 |
$33.00 |
$33.57 |
$31.50 |
| 141 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 950 | LF |
$30.00 |
$40.00 |
$39.00 |
$37.00 |
| 142 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 8 | EA |
$500.00 |
$1,800.00 |
$1,700.00 |
$1,600.00 |
| 143 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 4 | EA |
$7,000.00 |
$8,000.00 |
$7,500.00 |
$1,800.00 |
| 144 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 580 | DAY |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
| 145 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 126 | SF |
$14.99 |
$17.00 |
$61.00 |
$16.00 |
| 146 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 206 | LF |
$7.23 |
$9.00 |
$8.95 |
$13.00 |
| 147 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 34 | EA |
$10.87 |
$16.00 |
$14.00 |
$16.00 |
| 148 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 11,470 | LF |
$0.9000 |
$1.65 |
$0.8400 |
$1.60 |
| 149 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 540 | LF |
$1.21 |
$2.20 |
$6.71 |
$2.10 |
| 150 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 8 | EA |
$341.50 |
$600.00 |
$1,000.00 |
$550.00 |
| 151 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,000 | LF |
$1.36 |
$3.00 |
$2.29 |
$2.70 |
| 152 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.6200 |
$1.10 |
$2.24 |
$1.10 |
| 153 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 1 | EA |
$20,000.00 |
$20,000.00 |
$16,850.00 |
$22,500.00 |
| 154 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,380 | SD |
$5.00 |
$5.50 |
$6.71 |
$11.00 |
| 155 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,316 | LF |
$16.00 |
$8.50 |
$47.00 |
$40.00 |
| 156 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 6,877 | LF |
$2.60 |
$7.00 |
$2.00 |
$7.50 |
| 157 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,780 | SD |
$2.76 |
$5.50 |
$2.24 |
$2.20 |
| 158 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 40,430 | SD |
$0.2800 |
$0.4000 |
$0.0600 |
$0.1100 |
| 159 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 54,740 | SD |
$0.2800 |
$0.3000 |
$0.0600 |
$0.1100 |
| 160 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 27,270 | SD |
$1.04 |
$1.10 |
$0.5600 |
$2.25 |
| 161 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 20,740 | SD |
$0.8500 |
$1.10 |
$0.1100 |
$1.60 |
| 162 | 880(C) 8848 |
WING BARRICADES | 5,620 | SD |
$1.25 |
$1.00 |
$0.1100 |
$2.70 |
| 163 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 63,720 | SD |
$0.1000 |
$0.0600 |
$0.0600 |
$0.0500 |
| 164 | 880(F) 8878 |
DRUMS | 161,700 | SD |
$0.0400 |
$0.1500 |
$0.2200 |
$0.0500 |
| 165 | 880(G) 8884 |
TUBE CHANNELIZERS | 60,590 | SD |
$0.0800 |
$0.2000 |
$0.2500 |
$0.2500 |
| 166 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 144 | HOUR |
$76.62 |
$75.00 |
$67.00 |
$71.25 |
| 167 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 920 | SD |
$11.11 |
$40.00 |
$27.98 |
$45.00 |
| 168 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$158,750.89 |
$50,000.00 |
$74,601.35 |
| 169 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$15,000.00 |
$9,500.00 |
$2,500.00 |
| 170 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$576,704.00 |
$815,000.00 |
$865,000.00 |
|