| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,500.00 |
$55,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,955 | CY |
$8.00 |
$6.75 |
$7.10 |
$11.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,937 | CY |
$11.00 |
$8.25 |
$10.40 |
$13.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$7,000.00 |
$6,540.00 |
$18,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 750 | LF |
$1.60 |
$2.50 |
$3.10 |
$2.08 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$400.00 |
$273.00 |
$183.75 |
| 7 | 221(K) 0600 |
TEMPORARY FIBER LOG | 270 | LF |
$2.00 |
$10.00 |
$6.15 |
$5.96 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 486 | LF |
$2.00 |
$5.00 |
$2.70 |
$1.51 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 15,530 | SY |
$2.00 |
$4.00 |
$1.95 |
$1.51 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.2 | AC |
$350.00 |
$1,750.00 |
$817.50 |
$361.20 |
| 11 | 241 2832 |
MOWING | 6.4 | AC |
$100.00 |
$75.00 |
$125.50 |
$89.25 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 823 | CY |
$75.00 |
$55.00 |
$76.30 |
$73.50 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 10,334 | SY |
$7.00 |
$7.00 |
$5.45 |
$5.25 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 10,334 | SY |
$2.50 |
$5.00 |
$1.40 |
$1.31 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 324 | TON |
$35.00 |
$55.00 |
$65.00 |
$45.00 |
| 16 | 407(B) 0250 |
TACK COAT | 1,601 | GAL |
$4.00 |
$5.50 |
$5.00 |
$5.25 |
| 17 | 408 5774 |
PRIME COAT | 4,543 | GAL |
$4.00 |
$7.50 |
$7.00 |
$7.35 |
| 18 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 410 | TON |
$95.00 |
$130.00 |
$125.50 |
$133.35 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,008 | TON |
$80.00 |
$90.00 |
$84.50 |
$92.40 |
| 20 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 269 | TON |
$140.00 |
$160.00 |
$151.50 |
$160.65 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 728 | TON |
$95.00 |
$120.00 |
$114.50 |
$120.75 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,295 | CY |
$25.00 |
$14.00 |
$7.10 |
$5.00 |
| 23 | 508 6335 |
REMOVAL OF CULVERT END | 4 | EA |
$100.00 |
$400.00 |
$163.50 |
$400.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 872 | CY |
$475.00 |
$395.00 |
$454.75 |
$368.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 58 | CY |
$310.00 |
$385.00 |
$327.00 |
$379.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 154,840 | LB |
$1.00 |
$1.00 |
$1.07 |
$1.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 550 | LF |
$30.00 |
$25.00 |
$30.00 |
$45.00 |
| 28 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$1,250.00 |
$3,270.00 |
$1,355.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,725.00 |
$19,000.00 |
| 30 | 619(B) 4725 |
REMOVAL OF FENCE | 289 | LF |
$1.00 |
$3.00 |
$2.15 |
$2.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,989 | SY |
$5.00 |
$6.00 |
$4.00 |
$5.51 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,529 | LF |
$5.50 |
$10.00 |
$4.10 |
$3.00 |
| 33 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 415 | LF |
$15.00 |
$10.00 |
$2.20 |
$12.00 |
| 34 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 550 | LF |
$12.00 |
$10.00 |
$2.20 |
$12.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 161 | LF |
$4.00 |
$9.00 |
$6.50 |
$10.00 |
| 36 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 798 | LF |
$6.00 |
$8.00 |
$4.40 |
$8.19 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$30,000.00 |
$31,077.00 |
$25,000.00 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$30,000.00 |
$31,077.00 |
$25,000.00 |
| 39 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 4,600 | LF |
$1.00 |
$2.00 |
$0.5000 |
$0.3700 |
| 40 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$250.00 |
$30.00 |
$103.55 |
$26.25 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27.5 | SF |
$30.00 |
$30.00 |
$32.70 |
$21.00 |
| 42 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 24 | LF |
$10.00 |
$13.00 |
$13.10 |
$10.50 |
| 43 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 16,158 | LF |
$1.00 |
$1.00 |
$0.7000 |
$0.7900 |
| 44 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,005 | EA |
$0.5000 |
$2.25 |
$0.6000 |
$2.10 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 14,300 | LF |
$1.00 |
$0.1500 |
$0.4000 |
$0.1100 |
| 46 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 100 | SD |
$15.00 |
$1.25 |
$32.70 |
$1.05 |
| 47 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$22.00 |
$27.50 |
$20.50 |
$48.00 |
| 48 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 250 | LF |
$6.00 |
$13.75 |
$2.85 |
$6.00 |
| 49 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 280 | SD |
$7.00 |
$15.00 |
$13.10 |
$10.50 |
| 50 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,180 | SD |
$0.4000 |
$0.7500 |
$0.1000 |
$0.5300 |
| 51 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,640 | SD |
$0.8000 |
$0.5000 |
$0.1000 |
$0.2600 |
| 52 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,160 | SD |
$1.50 |
$0.4500 |
$0.8000 |
$1.31 |
| 53 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,760 | SD |
$1.00 |
$0.4000 |
$5.45 |
$1.26 |
| 54 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.30 |
$0.2000 |
$0.0500 |
$0.1100 |
| 55 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,600 | SD |
$0.3500 |
$0.2000 |
$0.6500 |
$0.1100 |
| 56 | 880(F) 8878 |
DRUMS | 11,680 | SD |
$0.3000 |
$0.2000 |
$0.2000 |
$0.1100 |
| 57 | 880(G) 8884 |
TUBE CHANNELIZERS | 6,250 | SD |
$0.2000 |
$0.2500 |
$0.6500 |
$0.2600 |
| 58 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$11,000.00 |
$20,000.00 |
$26,000.00 |
$16,800.00 |
| 59 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$12,500.00 |
$8,615.00 |
$10,500.00 |
| 60 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,000.00 |
$5,525.00 |
$5,000.00 |
| 61 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$98,000.00 |
$70,000.00 |
$132,600.00 |
$111,000.00 |