| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$21,525.00 |
$48,160.00 |
$108,000.00 |
$19,147.50 |
$39,050.00 |
$29,000.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 19,059 | CY |
$8.00 |
$5.99 |
$6.05 |
$5.50 |
$5.74 |
$6.28 |
$6.55 |
$7.39 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 52,031 | CY |
$12.00 |
$5.89 |
$5.95 |
$4.70 |
$6.70 |
$6.17 |
$8.85 |
$7.26 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,490.00 |
$22,680.00 |
$24,840.00 |
$38,500.00 |
$32,359.28 |
$34,760.00 |
$24,700.00 |
$27,966.52 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,900 | LF |
$1.75 |
$3.20 |
$3.42 |
$3.35 |
$3.89 |
$3.36 |
$3.05 |
$5.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$8.00 |
$24.51 |
$26.14 |
$25.65 |
$29.79 |
$25.67 |
$23.34 |
$14.00 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 3 | CY |
$205.00 |
$315.00 |
$200.00 |
$350.00 |
$126.44 |
$245.58 |
$500.00 |
$500.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,400 | LF |
$3.69 |
$15.41 |
$16.44 |
$16.15 |
$18.74 |
$16.15 |
$14.68 |
$10.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 36,500 | SY |
$1.28 |
$3.47 |
$3.66 |
$3.65 |
$4.21 |
$3.63 |
$3.30 |
$4.50 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 8 | AC |
$375.00 |
$2,358.30 |
$2,500.00 |
$450.00 |
$2,867.02 |
$2,470.60 |
$2,246.00 |
$1,035.00 |
| 11 | 241 2832 |
MOWING | 16 | AC |
$100.00 |
$435.75 |
$500.00 |
$250.00 |
$529.75 |
$456.50 |
$415.00 |
$100.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,665 | CY |
$57.00 |
$48.41 |
$50.25 |
$56.85 |
$53.82 |
$50.71 |
$57.60 |
$59.69 |
| 13 | 307(D) 4230 |
LIME | 154 | TON |
$194.00 |
$188.05 |
$195.22 |
$215.00 |
$246.28 |
$197.01 |
$185.00 |
$231.70 |
| 14 | 307(G) 4260 |
LIME PRETREATMENT | 10,719 | SY |
$2.00 |
$2.63 |
$2.80 |
$4.80 |
$4.02 |
$2.75 |
$3.15 |
$3.24 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 13,399 | SY |
$7.50 |
$5.22 |
$5.42 |
$4.35 |
$6.70 |
$5.47 |
$5.95 |
$6.50 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 13,884 | SY |
$1.50 |
$1.20 |
$1.31 |
$1.65 |
$1.66 |
$1.25 |
$1.25 |
$1.50 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,688 | TON |
$31.00 |
$24.61 |
$30.44 |
$28.70 |
$30.97 |
$25.78 |
$31.00 |
$30.35 |
| 18 | 407(B) 0250 |
TACK COAT | 1,599 | GAL |
$3.50 |
$2.21 |
$2.35 |
$1.60 |
$2.51 |
$2.31 |
$5.25 |
$2.72 |
| 19 | 408 5774 |
PRIME COAT | 7,910 | GAL |
$4.30 |
$2.63 |
$2.80 |
$3.30 |
$3.19 |
$2.75 |
$3.75 |
$3.24 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,581 | TON |
$78.00 |
$87.98 |
$90.49 |
$84.25 |
$106.96 |
$92.17 |
$95.70 |
$108.49 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,202 | TON |
$102.00 |
$95.04 |
$97.75 |
$90.30 |
$115.54 |
$99.56 |
$110.25 |
$117.90 |
| 22 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 4,760 | LF |
$0.6000 |
$0.4800 |
$0.5200 |
$0.8500 |
$0.5900 |
$1.06 |
$0.4600 |
$3.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 119 | CY |
$302.00 |
$325.50 |
$350.00 |
$313.50 |
$363.80 |
$421.15 |
$400.00 |
$400.00 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 19 | TON |
$70.00 |
$60.90 |
$44.35 |
$106.50 |
$40.17 |
$79.27 |
$72.00 |
$103.25 |
| 25 | 611(G) 5327 |
INLET GPI TYPE 1 (DES. 1) | 1 | EA |
$3,400.00 |
$3,780.00 |
$3,500.00 |
$6,790.00 |
$3,653.34 |
$6,173.20 |
$4,675.00 |
$7,266.12 |
| 26 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 65 | LF |
$80.00 |
$71.40 |
$68.26 |
$54.20 |
$58.21 |
$49.87 |
$78.00 |
$58.00 |
| 27 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$600.00 |
$787.50 |
$1,650.00 |
$600.00 |
$1,897.13 |
$836.00 |
$1,600.00 |
$985.00 |
| 28 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 18 | CY |
$40.00 |
$71.40 |
$62.63 |
$62.40 |
$66.13 |
$66.69 |
$33.80 |
$78.50 |
| 29 | 613(V) 1180 |
TRENCH EXCAVATION | 33 | CY |
$25.00 |
$52.50 |
$18.00 |
$1.00 |
$19.34 |
$10.18 |
$16.00 |
$11.98 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,245.00 |
$6,500.00 |
$162,000.00 |
$18,509.25 |
$7,590.00 |
$6,700.00 |
$8,933.75 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,347 | SY |
$5.00 |
$3.04 |
$4.50 |
$8.10 |
$5.11 |
$6.05 |
$7.00 |
$5.00 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 240 | LF |
$5.00 |
$6.30 |
$8.00 |
$9.45 |
$10.21 |
$5.50 |
$4.00 |
$10.00 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 1,100 | LF |
$5.50 |
$7.35 |
$8.00 |
$3.00 |
$2.55 |
$6.67 |
$6.50 |
$6.00 |
| 34 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,580 | LF |
$5.00 |
$5.57 |
$6.72 |
$5.25 |
$7.66 |
$7.87 |
$5.80 |
$9.00 |
| 35 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 10,530 | CY |
$7.00 |
$5.99 |
$7.50 |
$5.50 |
$8.30 |
$11.50 |
$7.95 |
$10.00 |
| 36 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,320 | CY |
$58.95 |
$48.41 |
$57.21 |
$71.50 |
$22.91 |
$88.29 |
$80.63 |
$120.00 |
| 37 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,020 | CY |
$18.00 |
$21.00 |
$12.00 |
$33.00 |
$15.32 |
$63.25 |
$5.00 |
$33.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 2,043.6 | CY |
$405.00 |
$459.06 |
$460.65 |
$362.85 |
$411.74 |
$567.54 |
$527.92 |
$590.00 |
| 39 | 511(A) 1332 |
REINFORCING STEEL | 306,500 | LB |
$0.9000 |
$1.04 |
$1.04 |
$1.10 |
$1.28 |
$1.15 |
$0.8500 |
$1.14 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$22,785.00 |
$36,500.00 |
$53,500.00 |
$23,615.25 |
$97,750.00 |
$40,000.00 |
$60,000.00 |
| 41 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$160.00 |
$78.75 |
$84.00 |
$82.50 |
$95.74 |
$82.50 |
$75.00 |
$97.11 |
| 42 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,560 | LF |
$0.2000 |
$0.2600 |
$0.2800 |
$0.2800 |
$0.3200 |
$0.2800 |
$0.2500 |
$0.3200 |
| 43 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 600 | LF |
$2.10 |
$2.10 |
$2.24 |
$2.20 |
$2.55 |
$2.20 |
$2.00 |
$2.59 |
| 44 | 857(E) 8881 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 10,000 | EA |
$0.6000 |
$0.2600 |
$0.2900 |
$0.2800 |
$0.3200 |
$0.2800 |
$0.2500 |
$0.3200 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 11,000 | LF |
$0.2700 |
$0.1600 |
$0.1700 |
$0.1700 |
$0.1900 |
$0.1700 |
$0.1500 |
$0.1900 |
| 46 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 30 | SD |
$12.60 |
$36.75 |
$35.00 |
$27.50 |
$31.91 |
$27.50 |
$25.00 |
$32.37 |
| 47 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,650 | LF |
$25.28 |
$23.10 |
$28.50 |
$20.75 |
$32.49 |
$55.00 |
$40.00 |
$45.32 |
| 48 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 650 | LF |
$3.74 |
$4.20 |
$3.00 |
$10.90 |
$2.55 |
$7.70 |
$2.00 |
$12.95 |
| 49 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,670 | SD |
$0.4000 |
$0.2600 |
$0.2900 |
$0.2500 |
$0.3200 |
$0.2800 |
$0.2500 |
$0.3200 |
| 50 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,860 | SD |
$0.7300 |
$2.10 |
$2.24 |
$2.20 |
$2.55 |
$2.20 |
$2.00 |
$2.59 |
| 51 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,820 | SD |
$1.40 |
$2.10 |
$2.24 |
$2.20 |
$2.55 |
$2.20 |
$2.00 |
$2.59 |
| 52 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,050 | SD |
$0.9600 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1300 |
$0.1100 |
$0.1000 |
$0.1300 |
| 53 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.8200 |
$2.10 |
$2.23 |
$2.20 |
$2.55 |
$2.20 |
$2.00 |
$2.59 |
| 54 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,990 | SD |
$0.2600 |
$0.0500 |
$0.0700 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.6000 |
| 55 | 880(F) 8878 |
DRUMS | 9,000 | SD |
$0.2000 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1300 |
$0.1100 |
$0.1000 |
$0.1300 |
| 56 | 880(G) 8884 |
TUBE CHANNELIZERS | 500 | SD |
$0.2500 |
$1.05 |
$1.12 |
$1.10 |
$1.28 |
$1.10 |
$1.00 |
$1.29 |
| 57 | 880(G) 8890 |
CHANNELIZER CONES | 750 | SD |
$0.5400 |
$1.05 |
$1.14 |
$1.10 |
$1.28 |
$1.10 |
$1.00 |
$1.29 |
| 58 | 880(I) 8902 |
FLAGGER | 60 | SD |
$121.18 |
$157.50 |
$115.00 |
$65.00 |
$714.84 |
$165.00 |
$300.00 |
$300.00 |
| 59 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$11.00 |
$5.25 |
$5.60 |
$5.50 |
$6.38 |
$5.50 |
$5.00 |
$6.47 |
| 60 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$60.00 |
$26.25 |
$35.00 |
$27.50 |
$31.91 |
$27.50 |
$25.00 |
$32.37 |
| 61 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$150.00 |
$210.00 |
$225.00 |
$220.00 |
$255.30 |
$220.00 |
$200.00 |
$259.00 |
| 62 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 48.25 | SF |
$24.00 |
$21.00 |
$23.00 |
$22.00 |
$25.53 |
$22.00 |
$20.00 |
$26.00 |
| 63 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 95 | LF |
$12.00 |
$10.50 |
$14.00 |
$11.00 |
$12.77 |
$11.00 |
$10.00 |
$12.95 |
| 64 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 17,520 | LF |
$0.6000 |
$0.5800 |
$0.6200 |
$0.6000 |
$0.7000 |
$0.6100 |
$0.5500 |
$0.7100 |
| 65 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$13,650.00 |
$14,000.00 |
$26,500.00 |
$15,956.25 |
$18,920.00 |
$12,368.27 |
$45,000.00 |
| 66 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,150.00 |
$3,750.00 |
$3,500.00 |
$1,914.75 |
$6,600.00 |
$7,500.00 |
$5,000.00 |
| 67 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$9,000.00 |
$3,150.00 |
$10,500.00 |
$5,000.00 |
$3,829.50 |
$11,000.00 |
$10,000.00 |
$5,000.00 |
| 68 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$165,330.32 |
$175,000.00 |
$342,087.23 |
$327,020.15 |
$221,406.45 |
$465,292.11 |
$194,000.00 |