Bid tab 180150

Let Mar 15, 2018 · Division 8 · Tulsa Sign up free

‹ Mar 2018 results

PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) SH-97/34TH ST/41ST ST : FROM 0.1 MI E OF SH-97, EXT W ON 41ST ST THEN N ON SH-97 THEN E ON 34TH ST IN SAND SPRINGS . PROJECT LENGTH = 0.73 MILE

Let date
Thursday, March 15, 2018
Contract
180150
J/P numbers
33037(04)
District
Division 8
County
Tulsa
Highway
Limits
PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) SH-97/34TH ST/41ST ST : FROM 0.1 MI E OF SH-97, EXT W ON 41ST ST THEN N ON SH-97 THEN E ON 34TH ST IN SAND SPRINGS . PROJECT LENGTH = 0.73 MILE
Project number
TAP-272B(238)IG

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$547,298
1 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION Low bidder $505,062 -7.7%
2 Keystone Services, Inc. $530,569 -3.1% +5.1%
3 Ellsworth Construction, LLC $544,830 -0.5% +7.9%
4 EARTH SMART CONSTRUCTION INC. $597,331 +9.1% +18.3%
5 CROSSLAND HEAVY CONTRACTORS INC. $624,000 +14.0% +23.5%

Bid tab: unit prices 36 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIGHT LIGHTING…#2 Keystone Servic…#3 Ellsworth Const…#4 EARTH SMART CON…#5 CROSSLAND HEAVY…
1201(B) 0181 SELECTIVE CLEARING1LSUM $1,000.00 $4,650.00 $7,500.00 $6,000.00 $3,500.00 $10,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION200CY $16.00 $18.75 $18.00 $16.00 $20.00 $22.00
3202(D) 0184 UNCLASSIFIED BORROW200CY $18.00 $23.00 $25.00 $20.00 $20.00 $21.50
4202(H) 0185 EARTHWORK1LSUM $37,283.00 $9,560.00 $40,000.00 $40,000.00 $17,000.00 $40,000.00
5205(A) 4230 TYPE A-SALVAGED TOPSOIL319CY $26.00 $18.00 $30.00 $15.00 $20.00 $55.00
6221(C) 2801 TEMPORARY SILT FENCE3,409LF $2.12 $2.40 $2.75 $3.00 $3.00 $1.35
7221(K) 0600 TEMPORARY FIBER LOG100LF $5.25 $9.00 $6.00 $8.50 $7.00 $4.50
8230(A) 2806 SOLID SLAB SODDING4,230SY $4.00 $3.40 $3.95 $4.00 $4.00 $3.50
9303(A) 2100 AGGREGATE BASE TYPE A842CY $58.61 $45.20 $45.00 $44.50 $50.00 $55.00
10310(B) 0149 SUBGRADE, METHOD B4,592SY $2.55 $2.85 $1.00 $1.00 $3.00 $0.0100
11501(G) 6315 CLSM BACKFILL84CY $128.00 $204.65 $95.00 $95.00 $150.00 $85.00
12509(B) 0321 CLASS A CONCRETE60.67CY $725.00 $369.45 $850.00 $800.00 $800.00 $900.00
13510(A) 6333 RETAINING WALL46SY $650.00 $140.00 $200.00 $440.00 $280.00 $350.00
14510(E) 0100 DECORATIVE WALL74LF $222.00 $385.40 $300.00 $300.00 $240.00 $995.00
15610(A) 0602 4" CONCRETE SIDEWALK3,478SY $50.00 $53.65 $44.25 $44.00 $57.00 $48.00
16610(A) 0605 6" CONCRETE SIDEWALK479SY $70.00 $81.80 $62.50 $51.50 $70.00 $100.00
17619(B) 4726 REMOVAL OF CURB AND GUTTER172LF $10.00 $4.40 $7.00 $5.25 $6.00 $4.00
18619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9SY $7.35 $6.10 $25.00 $30.00 $50.00 $11.00
19619(B) 4792 REMOVAL OF SIDEWALK236SY $16.00 $5.45 $8.00 $5.50 $20.00 $9.00
20619(B) 5881 REMOVAL OF CONCRETE DITCH LINER47LF $16.00 $4.65 $30.00 $6.00 $40.00 $10.00
21622(A) 4445 2" PIPE RAILING224LF $84.00 $136.15 $145.00 $240.00 $120.00 $130.00
22631(A) 0210 (SP)REMOVABLE BOLLARD12EA $1,200.00 $752.55 $1,500.00 $1,300.00 $1,600.00 $900.00
23805(D) 8752 (PL)REMOVE & RESET JUNCTION BOX2EA $600.00 $720.70 $4,500.00 $1,500.00 $6,000.00 $750.00
24805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $224.37 $288.25 $250.00 $408.00 $150.00 $250.00
25850(A) 8110 SHEET ALUMINUM SIGNS55SF $22.00 $28.85 $30.00 $39.75 $25.00 $25.00
26851(C) 8327 2 1/4" SQUARE TUBE POST194LF $19.00 $14.40 $10.00 $35.20 $8.50 $12.00
27854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)2,000LF $1.04 $1.45 $1.50 $2.30 $2.50 $1.25
28855(A) 8814 TRAFFIC STRIPE(PLASTIC)(8" WIDE)410LF $2.50 $3.60 $3.00 $4.30 $5.00 $3.00
29855(A) 8818 TRAFFIC STRIPE(PLASTIC)(12" WIDE)180LF $3.60 $7.20 $5.25 $8.90 $7.00 $6.00
30855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)88LF $11.90 $14.40 $11.00 $18.25 $15.00 $12.00
31855(B) 8824 TRAFFIC STRIPE(PLASTIC)(SYMBOLS)2EA $1,048.00 $432.40 $450.00 $489.00 $300.00 $375.00
32857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)20LF $0.7500 $7.20 $5.25 $6.85 $3.00 $6.00
33880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,500.00 $8,650.00 $8,000.00 $11,500.00 $17,000.00 $5,000.00
34642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $3,900.00 $8,793.00 $7,000.00 $11,000.00 $8,900.00 $3,000.00
35220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,370.94 $3,600.00 $12,500.00 $4,000.00 $4,500.00 $1,000.00
36641 1552 MOBILIZATION1LSUM $35,937.39 $24,575.00 $18,000.00 $18,000.00 $45,000.00 $50,484.93