| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$5,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,022 | CY |
$16.00 |
$11.00 |
$16.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,175 | CY |
$20.00 |
$13.50 |
$30.80 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$5,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.50 |
$2.00 |
$2.20 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 250 | LF |
$3.40 |
$4.35 |
$4.79 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,058 | SY |
$3.00 |
$4.00 |
$4.40 |
| 8 | 307(K) 4300 |
STABILIZED SUBGRADE | 1,984 | SY |
$9.80 |
$8.00 |
$16.17 |
| 9 | 407(B) 0250 |
TACK COAT | 364 | GAL |
$4.00 |
$4.75 |
$4.73 |
| 10 | 408 5774 |
PRIME COAT | 849 | GAL |
$6.00 |
$8.80 |
$9.68 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 408 | TON |
$110.00 |
$164.00 |
$163.90 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 272 | TON |
$125.00 |
$207.00 |
$207.35 |
| 13 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 320 | SY |
$150.00 |
$55.00 |
$93.00 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 80 | CY |
$200.00 |
$250.00 |
$143.00 |
| 15 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 205 | LF |
$20.00 |
$50.00 |
$10.00 |
| 16 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 320 | SY |
$25.00 |
$17.00 |
$97.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,058 | SY |
$15.00 |
$3.50 |
$11.00 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 838 | LF |
$8.50 |
$3.00 |
$5.50 |
| 19 | 619(B) 4791 |
REMOVAL OF CURB | 982 | LF |
$6.00 |
$11.00 |
$27.50 |
| 20 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$2,750.00 |
$2,500.00 |
$3,000.00 |
| 21 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 563 | LF |
$20.00 |
$24.00 |
$24.20 |
| 22 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,800.00 |
$825.00 |
$825.00 |
| 23 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,860.00 |
$2,860.00 |
| 24 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,250.00 |
$2,100.00 |
$2,117.50 |
| 25 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$64,600.00 |
$150,000.00 |
$114,000.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 191.2 | SY |
$225.00 |
$250.00 |
$330.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 619 | SY |
$5.00 |
$6.00 |
$5.28 |
| 28 | 504(E) 1381 |
CONCRETE PARAPET | 367 | LF |
$165.00 |
$165.00 |
$236.50 |
| 29 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 78 | LF |
$36.00 |
$20.00 |
$30.00 |
| 30 | 505(A) 6065 |
BRIDGE DECK CONCRETE OVERLAY | 621.9 | SY |
$145.00 |
$150.00 |
$263.00 |
| 31 | 505(E) 1000 |
HYDRODEMOLITION | 621.9 | SY |
$150.00 |
$242.00 |
$240.00 |
| 32 | 509(D) 1331 |
CLASS C CONCRETE | 4 | CY |
$510.00 |
$1,900.00 |
$660.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 3,690 | LB |
$1.80 |
$1.00 |
$1.00 |
| 34 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 31.1 | SY |
$550.00 |
$350.00 |
$1,000.00 |
| 35 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 736 | SY |
$4.00 |
$5.00 |
$4.40 |
| 36 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 219 | LF |
$35.00 |
$15.00 |
$30.80 |
| 37 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2.5 | GAL |
$105.00 |
$80.00 |
$110.00 |
| 38 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$720.00 |
$650.00 |
$907.50 |
| 39 | 523(A) 6550 |
SEALER CRACK PREPARATION | 143.5 | LF |
$5.00 |
$5.00 |
$5.50 |
| 40 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$175.00 |
$50.00 |
$165.00 |
| 41 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$65.00 |
$55.00 |
$38.50 |
| 42 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$28,500.00 |
$56,000.00 |
$83,400.00 |
| 43 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$52,200.00 |
$150,000.00 |
$114,000.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 151.2 | SY |
$225.00 |
$250.00 |
$330.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 439 | SY |
$5.00 |
$6.00 |
$6.82 |
| 46 | 504(E) 1381 |
CONCRETE PARAPET | 367 | LF |
$165.00 |
$165.00 |
$236.50 |
| 47 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 60 | LF |
$36.00 |
$20.00 |
$30.00 |
| 48 | 505(A) 6065 |
BRIDGE DECK CONCRETE OVERLAY | 478.4 | SY |
$145.00 |
$150.00 |
$303.00 |
| 49 | 505(E) 1000 |
HYDRODEMOLITION | 478.4 | SY |
$150.00 |
$242.00 |
$260.00 |
| 50 | 509(D) 1331 |
CLASS C CONCRETE | 4 | CY |
$510.00 |
$1,900.00 |
$660.00 |
| 51 | 511(A) 1332 |
REINFORCING STEEL | 2,740 | LB |
$1.80 |
$1.00 |
$1.00 |
| 52 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 24 | SY |
$550.00 |
$350.00 |
$1,000.00 |
| 53 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 705 | SY |
$4.00 |
$5.00 |
$4.40 |
| 54 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 128 | LF |
$35.00 |
$15.00 |
$30.80 |
| 55 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$105.00 |
$80.00 |
$110.00 |
| 56 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$720.00 |
$650.00 |
$907.50 |
| 57 | 523(A) 6550 |
SEALER CRACK PREPARATION | 143.5 | LF |
$5.00 |
$5.00 |
$5.50 |
| 58 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$175.00 |
$50.00 |
$165.00 |
| 59 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 6 | SY |
$65.00 |
$55.00 |
$38.50 |
| 60 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$21,900.00 |
$56,000.00 |
$79,500.00 |
| 61 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 29 | EA |
$15.00 |
$24.00 |
$16.50 |
| 62 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 5,098 | LF |
$2.00 |
$1.20 |
$1.32 |
| 63 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,230 | LF |
$0.2000 |
$0.2500 |
$0.2800 |
| 64 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 17,737 | LF |
$0.2000 |
$0.2500 |
$0.2800 |
| 65 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 5,000 | EA |
$0.6000 |
$1.25 |
$1.38 |
| 66 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,500 | SD |
$15.00 |
$5.00 |
$5.50 |
| 67 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,275 | LF |
$20.00 |
$25.00 |
$24.20 |
| 68 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 5,025 | LF |
$3.00 |
$2.50 |
$2.20 |
| 69 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,000 | SD |
$2.50 |
$3.00 |
$3.30 |
| 70 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,970 | SD |
$0.5000 |
$0.2500 |
$0.2800 |
| 71 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,490 | SD |
$0.8000 |
$0.2500 |
$0.2800 |
| 72 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,440 | SD |
$1.20 |
$1.00 |
$1.10 |
| 73 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,090 | SD |
$1.00 |
$0.5000 |
$0.5500 |
| 74 | 880(C) 8848 |
WING BARRICADES | 2,000 | SD |
$0.9000 |
$1.00 |
$1.10 |
| 75 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,440 | SD |
$0.3000 |
$1.00 |
$1.10 |
| 76 | 880(F) 8878 |
DRUMS | 45,130 | SD |
$0.3000 |
$0.1500 |
$0.1700 |
| 77 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,238 | SD |
$10.80 |
$10.00 |
$11.00 |
| 78 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,266.40 |
$3,000.00 |
$9,000.00 |
| 79 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$92,287.70 |
$187,630.57 |
$207,000.00 |