| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$28,980.00 |
$40,000.00 |
$23,000.00 |
$20,000.00 |
$18,000.00 |
$173,795.00 |
$75,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 34,730 | CY |
$6.50 |
$6.29 |
$7.60 |
$6.50 |
$10.00 |
$10.12 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 30,668 | CY |
$9.00 |
$7.08 |
$8.15 |
$8.75 |
$10.66 |
$12.91 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$63,310.00 |
$42,583.36 |
$50,000.00 |
$30,000.00 |
$82,112.67 |
$41,840.00 |
$160,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,200 | LF |
$1.60 |
$1.56 |
$1.75 |
$1.29 |
$1.29 |
$1.43 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 637 | LF |
$7.25 |
$11.45 |
$7.85 |
$6.85 |
$6.85 |
$7.57 |
$9.00 |
| 7 | 221(K) 0600 |
TEMPORARY FIBER LOG | 14,500 | LF |
$4.50 |
$1.83 |
$3.10 |
$2.95 |
$2.95 |
$3.26 |
$3.25 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 1,238 | LF |
$2.50 |
$2.66 |
$2.37 |
$2.25 |
$2.25 |
$2.49 |
$2.50 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 70,121 | SY |
$1.35 |
$1.49 |
$1.35 |
$1.26 |
$1.26 |
$1.39 |
$1.30 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 14.49 | AC |
$300.00 |
$235.23 |
$209.00 |
$199.00 |
$199.00 |
$220.00 |
$220.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 14.49 | AC |
$200.00 |
$119.00 |
$125.00 |
$119.00 |
$199.00 |
$131.00 |
$120.00 |
| 12 | 241 2832 |
MOWING | 29 | AC |
$50.00 |
$46.10 |
$31.00 |
$39.00 |
$39.00 |
$43.00 |
$55.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,382 | CY |
$40.00 |
$36.39 |
$35.40 |
$27.00 |
$40.91 |
$37.34 |
$46.00 |
| 14 | 307(D) 4230 |
LIME | 359 | TON |
$160.00 |
$180.58 |
$165.24 |
$162.00 |
$159.50 |
$176.40 |
$170.00 |
| 15 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 19,925 | SY |
$3.50 |
$3.40 |
$2.25 |
$5.60 |
$7.45 |
$5.28 |
$6.00 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 21,290 | SY |
$1.50 |
$1.09 |
$1.72 |
$1.35 |
$2.52 |
$0.7100 |
$1.50 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,676 | TON |
$25.00 |
$18.03 |
$17.40 |
$15.00 |
$24.35 |
$22.05 |
$21.00 |
| 18 | 407(B) 0250 |
TACK COAT | 5,006 | GAL |
$3.00 |
$2.82 |
$2.85 |
$2.70 |
$2.70 |
$2.91 |
$3.50 |
| 19 | 408 5774 |
PRIME COAT | 15,776 | GAL |
$6.50 |
$0.5000 |
$4.40 |
$4.18 |
$4.18 |
$4.51 |
$0.7500 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,613 | TON |
$85.00 |
$74.59 |
$69.69 |
$66.37 |
$66.37 |
$71.56 |
$65.00 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,151 | TON |
$75.00 |
$64.28 |
$60.00 |
$56.72 |
$56.72 |
$64.01 |
$65.00 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,058 | TON |
$90.00 |
$87.76 |
$85.90 |
$81.77 |
$81.77 |
$88.16 |
$75.00 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,856 | TON |
$88.00 |
$67.48 |
$69.81 |
$66.49 |
$66.49 |
$71.69 |
$65.00 |
| 24 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 95 | CY |
$20.00 |
$41.37 |
$12.00 |
$100.00 |
$18.78 |
$63.24 |
$50.00 |
| 25 | 509(A) 0319 |
CLASS AA CONCRETE | 228 | CY |
$500.00 |
$551.24 |
$440.00 |
$400.00 |
$365.54 |
$297.37 |
$800.00 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 223 | CY |
$300.00 |
$330.68 |
$300.00 |
$400.00 |
$274.62 |
$339.16 |
$500.00 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 35,953 | LB |
$1.50 |
$1.04 |
$1.00 |
$0.7500 |
$0.8300 |
$0.7800 |
$1.30 |
| 28 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 95 | LF |
$20.00 |
$59.10 |
$35.00 |
$35.00 |
$25.43 |
$24.28 |
$60.00 |
| 29 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 6 | SY |
$30.00 |
$591.02 |
$102.00 |
$200.00 |
$128.14 |
$80.46 |
$200.00 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 452 | LF |
$30.00 |
$45.80 |
$29.20 |
$22.75 |
$36.40 |
$59.34 |
$50.00 |
| 31 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 196 | LF |
$42.00 |
$51.50 |
$30.85 |
$29.25 |
$36.31 |
$65.68 |
$75.00 |
| 32 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 60 | LF |
$65.00 |
$84.33 |
$56.25 |
$44.00 |
$79.81 |
$94.76 |
$90.00 |
| 33 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 116 | LF |
$50.00 |
$82.48 |
$29.00 |
$35.50 |
$55.38 |
$60.11 |
$85.00 |
| 34 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 252 | LF |
$13.50 |
$15.15 |
$17.00 |
$25.00 |
$26.40 |
$24.69 |
$20.00 |
| 35 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 84 | LF |
$15.00 |
$23.82 |
$17.00 |
$40.00 |
$26.40 |
$33.21 |
$20.00 |
| 36 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$400.00 |
$420.78 |
$900.00 |
$320.00 |
$578.39 |
$188.00 |
$500.00 |
| 37 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$300.00 |
$341.59 |
$802.00 |
$355.00 |
$559.58 |
$197.00 |
$600.00 |
| 38 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$400.00 |
$1,328.52 |
$1,500.00 |
$1,200.00 |
$529.64 |
$1,395.00 |
$1,200.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$21,593.30 |
$18,000.00 |
$5,000.00 |
$1,189.98 |
$18,774.00 |
$60,000.00 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 20,078 | SY |
$3.00 |
$2.91 |
$3.50 |
$3.50 |
$1.77 |
$2.56 |
$5.00 |
| 41 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 160 | LF |
$2.00 |
$29.55 |
$8.00 |
$5.00 |
$4.00 |
$4.29 |
$10.00 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 2,048 | LF |
$3.14 |
$2.90 |
$4.00 |
$6.00 |
$1.85 |
$5.40 |
$5.00 |
| 43 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 750 | LF |
$17.00 |
$20.69 |
$18.50 |
$14.00 |
$14.00 |
$16.20 |
$15.00 |
| 44 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,600.49 |
$2,300.00 |
$2,200.00 |
$2,200.00 |
$2,253.00 |
$2,500.00 |
| 45 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,979.92 |
$1,775.00 |
$1,750.00 |
$1,750.00 |
$1,475.00 |
$2,000.00 |
| 46 | 624(A) 4281 |
FENCE-STYLE WWF | 1,246 | LF |
$7.00 |
$2.80 |
$4.60 |
$7.59 |
$5.00 |
$5.36 |
$6.00 |
| 47 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 1 | EA |
$900.00 |
$1,004.73 |
$950.00 |
$250.00 |
$800.00 |
$322.00 |
$1,000.00 |
| 48 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,292 | LF |
$7.00 |
$7.33 |
$3.80 |
$3.66 |
$3.75 |
$4.02 |
$4.00 |
| 49 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,041 | LF |
$8.00 |
$6.03 |
$4.15 |
$7.04 |
$4.00 |
$4.29 |
$5.00 |
| 50 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$86.00 |
$354.61 |
$125.00 |
$75.00 |
$310.36 |
$131.00 |
$400.00 |
| 51 | 629(C) 4960 |
MAILBOX | 3 | EA |
$55.00 |
$354.61 |
$75.00 |
$50.00 |
$114.91 |
$38.00 |
$400.00 |
| 52 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$20.00 |
$354.61 |
$50.00 |
$50.00 |
$310.36 |
$27.00 |
$400.00 |
| 53 | 616(B) 5218 |
2" POLYVINYL CHLORIDE (PVC) PIPE | 760 | LF |
$2.25 |
$17.73 |
$3.00 |
$3.00 |
$13.83 |
$0.7100 |
$12.00 |
| 54 | 616(B) 5223 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 925 | LF |
$5.76 |
$23.64 |
$7.50 |
$7.00 |
$16.12 |
$3.94 |
$28.00 |
| 55 | 616(D) 0775 |
2" BLOW OFF VALVE | 1 | EA |
$1,500.00 |
$886.53 |
$2,000.00 |
$1,500.00 |
$2,410.26 |
$536.40 |
$1,000.00 |
| 56 | 616(D) 1050 |
2" GATE VALVE | 2 | EA |
$500.00 |
$531.92 |
$750.00 |
$820.00 |
$811.26 |
$321.84 |
$1,000.00 |
| 57 | 616(D) 1070 |
6" GATE VALVE | 4 | EA |
$750.00 |
$1,122.94 |
$950.00 |
$1,100.00 |
$1,490.95 |
$590.04 |
$1,500.00 |
| 58 | 616(D) 7051 |
STANDARD VALVE BOX | 6 | EA |
$40.00 |
$177.31 |
$60.00 |
$150.00 |
$394.67 |
$59.00 |
$150.00 |
| 59 | 616(E) 0879 |
1" CORPORATION STOPS | 4 | EA |
$35.00 |
$177.31 |
$50.00 |
$75.00 |
$378.48 |
$53.64 |
$65.00 |
| 60 | 616(F) 5204 |
METER INSTALLATION 5/8" | 4 | EA |
$100.00 |
$413.72 |
$200.00 |
$400.00 |
$751.73 |
$2,145.62 |
$300.00 |
| 61 | 616(I) 0075 |
4" STEEL CASING | 174 | LF |
$25.00 |
$59.10 |
$40.00 |
$120.00 |
$76.44 |
$9.25 |
$130.00 |
| 62 | 616(M) 0150 |
INSTALL WATER LINE | 1 | LSUM |
$31,000.00 |
$118.20 |
$35,000.00 |
$19,500.00 |
$0.0100 |
$19,310.55 |
$36,000.00 |
| 63 | 616(N) 0098 |
WET CONNECTION (6") | 5 | EA |
$1,000.00 |
$1,182.04 |
$1,200.00 |
$2,000.00 |
$1,605.39 |
$1,072.81 |
$1,000.00 |
| 64 | 616(O) 0160 |
2" 90 DEGREE FITTING | 1 | EA |
$87.00 |
$177.31 |
$200.00 |
$450.00 |
$544.63 |
$21.46 |
$140.00 |
| 65 | 616(O) 0200 |
6" 45 DEGREE FITTING | 8 | EA |
$500.00 |
$413.71 |
$700.00 |
$600.00 |
$625.21 |
$120.69 |
$200.00 |
| 66 | 616(P) 0050 |
1" POLYETHYLENE TUBING | 200 | LF |
$2.50 |
$11.82 |
$4.00 |
$6.00 |
$10.08 |
$0.3800 |
$11.00 |
| 67 | 616(V) 0100 |
HYDROSTATIC PRESSURE TESTING & DISINFECTION | 1 | LSUM |
$1,500.00 |
$1,182.04 |
$2,500.00 |
$4,000.00 |
$6,565.05 |
$1,072.81 |
$8,000.00 |
| 68 | 616(W) 0200 |
(PL) VENT PIPE | 2 | EA |
$500.00 |
$295.51 |
$800.00 |
$500.00 |
$712.86 |
$32.18 |
$300.00 |
| 69 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 228 | CY |
$25.00 |
$37.84 |
$12.00 |
$35.00 |
$29.50 |
$29.64 |
$25.00 |
| 70 | 501(G) 6309 |
CLSM BACKFILL | 213 | CY |
$140.00 |
$125.75 |
$125.00 |
$130.00 |
$157.47 |
$132.46 |
$110.00 |
| 71 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 900 | LF |
$230.00 |
$221.43 |
$186.00 |
$300.00 |
$245.33 |
$220.00 |
$250.00 |
| 72 | 504(A) 1304 |
APPROACH SLAB | 318.6 | SY |
$200.00 |
$117.27 |
$152.00 |
$200.00 |
$157.57 |
$127.02 |
$180.00 |
| 73 | 504(B) 1305 |
SAW-CUT GROOVING | 1,022.4 | SY |
$4.50 |
$11.03 |
$4.10 |
$3.85 |
$3.85 |
$4.72 |
$4.40 |
| 74 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47.8 | LF |
$350.00 |
$256.87 |
$235.00 |
$300.00 |
$357.15 |
$186.64 |
$260.00 |
| 75 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 502.7 | LF |
$85.00 |
$95.70 |
$81.00 |
$90.00 |
$99.46 |
$116.64 |
$85.00 |
| 76 | 506(A) 1322 |
STRUCTURAL STEEL | 1,560 | LB |
$3.50 |
$1.76 |
$1.90 |
$10.00 |
$3.00 |
$1.48 |
$4.00 |
| 77 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$991.24 |
$970.00 |
$1,500.00 |
$1,565.58 |
$794.00 |
$2,500.00 |
| 78 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,000.00 |
$1,263.95 |
$970.00 |
$1,500.00 |
$1,866.63 |
$1,380.00 |
$2,500.00 |
| 79 | 509(A) 1326 |
CLASS AA CONCRETE | 220 | CY |
$550.00 |
$555.00 |
$650.00 |
$540.00 |
$812.55 |
$550.00 |
$900.00 |
| 80 | 509(B) 1328 |
CLASS A CONCRETE | 197 | CY |
$575.00 |
$419.20 |
$625.00 |
$540.00 |
$494.64 |
$770.00 |
$900.00 |
| 81 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$600.00 |
$118.20 |
$250.00 |
$540.00 |
$1,916.70 |
$504.22 |
$650.00 |
| 82 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 67,710 | LB |
$1.10 |
$1.00 |
$1.10 |
$1.00 |
$1.08 |
$0.7700 |
$1.00 |
| 83 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 104 | LF |
$40.00 |
$35.98 |
$28.15 |
$40.00 |
$41.68 |
$30.04 |
$30.00 |
| 84 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 414 | LF |
$40.00 |
$41.65 |
$34.00 |
$50.00 |
$52.39 |
$37.98 |
$40.00 |
| 85 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 104 | LF |
$20.00 |
$143.65 |
$18.00 |
$30.00 |
$34.08 |
$124.82 |
$20.00 |
| 86 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 414 | LF |
$20.00 |
$34.22 |
$12.00 |
$40.00 |
$30.86 |
$73.33 |
$20.00 |
| 87 | 514(K) 6260 |
(PL)PILOT HOLES | 518 | LF |
$150.00 |
$187.94 |
$265.00 |
$210.00 |
$214.39 |
$215.80 |
$250.00 |
| 88 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 89 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 983.4 | SY |
$4.00 |
$4.55 |
$3.75 |
$3.50 |
$3.50 |
$1.64 |
$4.00 |
| 90 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 84 | LF |
$750.00 |
$843.73 |
$2,207.00 |
$1,275.00 |
$1,028.02 |
$660.22 |
$1,100.00 |
| 91 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,500.00 |
$7,683.26 |
$2,500.00 |
$7,500.00 |
$1,635.00 |
$1,073.00 |
$7,500.00 |
| 92 | 523(A) 6550 |
SEALER CRACK PREPARATION | 144 | LF |
$4.00 |
$7.09 |
$5.00 |
$4.00 |
$4.00 |
$14.90 |
$5.50 |
| 93 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$118.20 |
$200.00 |
$100.00 |
$100.00 |
$536.00 |
$110.00 |
| 94 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$8,000.00 |
$1,418.45 |
$5,000.00 |
$15,000.00 |
$8,118.59 |
$2,467.00 |
$7,500.00 |
| 95 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,080 | TON |
$40.00 |
$34.92 |
$30.00 |
$35.00 |
$36.63 |
$30.99 |
$45.00 |
| 96 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 146 | TON |
$35.00 |
$52.77 |
$28.00 |
$30.00 |
$35.50 |
$33.07 |
$40.00 |
| 97 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 95 | LF |
$30.00 |
$17.41 |
$50.00 |
$40.00 |
$29.38 |
$23.71 |
$20.00 |
| 98 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$28.00 |
$25.39 |
$20.00 |
$40.00 |
$37.99 |
$30.04 |
$20.00 |
| 99 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$23,784.27 |
$42,000.00 |
$60,000.00 |
$32,930.62 |
$30,000.00 |
$80,924.54 |
| 100 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,000 | LF |
$0.1500 |
$0.3000 |
$0.2700 |
$0.2500 |
$0.2500 |
$0.2700 |
$0.2800 |
| 101 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,000 | EA |
$0.7500 |
$0.8900 |
$0.8000 |
$0.7500 |
$0.7500 |
$0.8000 |
$0.8300 |
| 102 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,200 | LF |
$0.2000 |
$0.5900 |
$0.5500 |
$0.5000 |
$1.50 |
$0.5400 |
$0.5500 |
| 103 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 490 | SD |
$10.00 |
$1.18 |
$2.00 |
$1.00 |
$3.00 |
$1.07 |
$1.10 |
| 104 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,400 | LF |
$20.00 |
$31.53 |
$12.75 |
$30.00 |
$16.16 |
$18.62 |
$25.00 |
| 105 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,450 | SD |
$0.3000 |
$2.36 |
$2.10 |
$2.00 |
$0.1000 |
$2.15 |
$2.20 |
| 106 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,675 | SD |
$0.6000 |
$2.36 |
$2.10 |
$2.00 |
$0.1000 |
$2.15 |
$2.20 |
| 107 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,330 | SD |
$1.50 |
$0.1200 |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1500 |
| 108 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,165 | SD |
$1.00 |
$0.1200 |
$0.2000 |
$0.1000 |
$0.0200 |
$0.1100 |
$0.1500 |
| 109 | 880(C) 8848 |
WING BARRICADES | 980 | SD |
$1.00 |
$1.18 |
$1.10 |
$1.00 |
$8.00 |
$1.07 |
$1.10 |
| 110 | 880(D) 8854 |
VERTICAL PANELS | 8,575 | SD |
$0.1000 |
$0.2400 |
$0.2500 |
$0.2000 |
$0.0200 |
$0.2100 |
$0.2500 |
| 111 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,210 | SD |
$0.2000 |
$0.1200 |
$0.1500 |
$0.1000 |
$0.0200 |
$0.1100 |
$0.1000 |
| 112 | 880(F) 8878 |
DRUMS | 22,050 | SD |
$0.2000 |
$0.1200 |
$0.1500 |
$0.1000 |
$0.0300 |
$0.1100 |
$0.1500 |
| 113 | 880(G) 8890 |
CHANNELIZER CONES | 12,250 | SD |
$0.2500 |
$0.2400 |
$0.2500 |
$0.2000 |
$0.0200 |
$0.2100 |
$0.2500 |
| 114 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 518 | SD |
$13.00 |
$5.91 |
$5.25 |
$5.00 |
$25.00 |
$5.36 |
$5.50 |
| 115 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 16,000 | LF |
$0.5000 |
$0.5400 |
$0.5000 |
$0.4600 |
$1.25 |
$0.4900 |
$0.5000 |
| 116 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$17,730.59 |
$50,000.00 |
$10,900.00 |
$38,109.98 |
$13,855.00 |
$50,000.00 |
| 117 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,500.00 |
$1,200.00 |
$5,000.00 |
$5,000.00 |
$19,083.00 |
$1,073.00 |
$8,000.00 |
| 118 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$1,000.00 |
$1,000.00 |
$2,500.00 |
$5,000.00 |
$6,820.38 |
$11,801.00 |
$7,500.00 |
| 119 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$210,000.00 |
$185,000.00 |
$200,000.00 |
$269,720.00 |
$231,049.08 |
$225,000.00 |
$260,000.00 |