| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 628.1 | CY |
$12.60 |
$35.00 |
$20.00 |
$16.00 |
$11.04 |
$17.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 126.8 | CY |
$21.50 |
$45.00 |
$30.00 |
$26.00 |
$19.32 |
$28.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,020 | LF |
$2.10 |
$4.00 |
$2.75 |
$1.64 |
$1.96 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 120 | LF |
$8.80 |
$15.00 |
$8.00 |
$11.34 |
$13.60 |
$11.00 |
| 5 | 221(K) 0600 |
TEMPORARY FIBER LOG | 350 | LF |
$4.50 |
$10.00 |
$5.00 |
$8.28 |
$9.93 |
$6.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,020 | SY |
$3.00 |
$5.50 |
$3.20 |
$5.00 |
$4.29 |
$6.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,704.62 | CY |
$47.50 |
$32.00 |
$41.00 |
$51.75 |
$16.83 |
$55.00 |
| 8 | 307(K) 4300 |
STABILIZED SUBGRADE | 6,020 | SY |
$8.60 |
$8.00 |
$6.00 |
$5.47 |
$7.24 |
$8.00 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 6,371 | SY |
$1.60 |
$1.00 |
$1.15 |
$1.44 |
$0.6900 |
$2.00 |
| 10 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 640 | SY |
$3.60 |
$2.00 |
$3.40 |
$3.17 |
$1.67 |
$5.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 14 | TON |
$39.20 |
$20.00 |
$35.00 |
$33.35 |
$16.83 |
$55.00 |
| 12 | 407(B) 0250 |
TACK COAT | 1,912 | GAL |
$3.30 |
$3.00 |
$5.50 |
$2.25 |
$4.83 |
$2.50 |
| 13 | 408 5774 |
PRIME COAT | 1,593 | GAL |
$5.60 |
$1.00 |
$1.00 |
$4.00 |
$7.59 |
$4.00 |
| 14 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 904 | TON |
$82.90 |
$65.00 |
$73.00 |
$92.00 |
$96.58 |
$88.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,170 | TON |
$80.00 |
$55.00 |
$65.00 |
$86.25 |
$82.09 |
$82.00 |
| 16 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 902 | TON |
$99.30 |
$73.00 |
$85.00 |
$97.75 |
$126.93 |
$88.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 959 | TON |
$87.10 |
$71.00 |
$70.00 |
$98.00 |
$115.89 |
$88.00 |
| 18 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 50 | TON |
$159.40 |
$50.00 |
$285.00 |
$260.00 |
$165.56 |
$250.00 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 7,739 | SY |
$3.30 |
$2.00 |
$3.00 |
$10.90 |
$4.14 |
$10.00 |
| 20 | 610(A) 0604 |
5" CONCRETE SIDEWALK | 227 | SY |
$60.00 |
$55.00 |
$55.00 |
$89.00 |
$93.13 |
$55.00 |
| 21 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,676.20 |
$5,000.00 |
$3,000.00 |
$3,445.00 |
$2,083.04 |
$3,800.00 |
| 22 | 611(L) 0487 |
JUNCTION BOXES | 151.58 | CF |
$78.90 |
$75.00 |
$35.00 |
$112.00 |
$41.39 |
$35.00 |
| 23 | 612(B) 0750 |
CONNECT TO EXISTING MANHOLE | 2 | EA |
$1,000.00 |
$3,500.00 |
$1,770.00 |
$1,685.00 |
$2,545.51 |
$1,500.00 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,338 | LF |
$56.90 |
$65.00 |
$50.00 |
$55.00 |
$18.29 |
$60.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$13,089.20 |
$5,000.00 |
$5,700.00 |
$4,500.00 |
$3,449.19 |
$10,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,299 | SY |
$6.20 |
$12.00 |
$5.35 |
$12.54 |
$7.45 |
$11.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,196 | LF |
$8.00 |
$4.00 |
$2.35 |
$4.50 |
$5.52 |
$4.00 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 2,629 | LF |
$5.00 |
$4.00 |
$3.00 |
$5.40 |
$4.14 |
$5.50 |
| 29 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 762.5 | LF |
$20.00 |
$25.00 |
$24.50 |
$18.50 |
$21.03 |
$16.00 |
| 30 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,371.40 |
$2,500.00 |
$2,350.00 |
$2,900.00 |
$3,414.70 |
$2,600.00 |
| 31 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$1,988.80 |
$2,000.00 |
$1,550.00 |
$2,575.00 |
$3,029.77 |
$2,300.00 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$171.10 |
$90.00 |
$105.00 |
$225.00 |
$368.37 |
$150.00 |
| 33 | 504(A) 1304 |
APPROACH SLAB | 199.3 | SY |
$165.70 |
$165.00 |
$155.00 |
$285.00 |
$265.93 |
$200.00 |
| 34 | 504(B) 1305 |
SAW-CUT GROOVING | 899.5 | SY |
$4.30 |
$5.00 |
$4.75 |
$5.06 |
$6.35 |
$5.00 |
| 35 | 504(C) 6250 |
SEALED EXPANSION JOINT | 50.2 | LF |
$246.40 |
$215.00 |
$200.00 |
$315.00 |
$255.24 |
$275.00 |
| 36 | 504(E) 6190 |
42" F-SHAPED PARAPET | 320.1 | LF |
$74.50 |
$65.00 |
$60.00 |
$112.00 |
$112.24 |
$140.00 |
| 37 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 138,920 | LB |
$1.60 |
$1.50 |
$2.10 |
$2.02 |
$2.76 |
$2.25 |
| 38 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 14 | EA |
$1,797.30 |
$1,500.00 |
$1,700.00 |
$1,600.00 |
$1,394.58 |
$1,800.00 |
| 39 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 28 | EA |
$1,689.80 |
$1,500.00 |
$1,700.00 |
$1,600.00 |
$1,394.58 |
$1,800.00 |
| 40 | 509(A) 1326 |
CLASS AA CONCRETE | 206.8 | CY |
$535.80 |
$700.00 |
$600.00 |
$675.00 |
$848.50 |
$650.00 |
| 41 | 509(B) 1328 |
CLASS A CONCRETE | 254.9 | CY |
$667.60 |
$600.00 |
$450.00 |
$690.00 |
$1,146.51 |
$825.00 |
| 42 | 510(C) 6138 |
SLOPE WALL (5") | 445.7 | SY |
$179.00 |
$70.00 |
$130.00 |
$127.00 |
$103.75 |
$120.00 |
| 43 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 87,850 | LB |
$1.00 |
$1.00 |
$1.10 |
$1.07 |
$1.35 |
$1.25 |
| 44 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$285.60 |
$200.00 |
$100.00 |
$475.00 |
$620.86 |
$300.00 |
| 45 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,501 | LF |
$35.00 |
$30.00 |
$31.00 |
$40.60 |
$23.32 |
$18.00 |
| 46 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,501 | LF |
$17.00 |
$15.00 |
$25.00 |
$17.40 |
$34.49 |
$35.00 |
| 47 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 48 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 595 | SY |
$4.00 |
$5.00 |
$4.10 |
$4.40 |
$5.52 |
$5.00 |
| 49 | 523(A) 6550 |
SEALER CRACK PREPARATION | 52.2 | LF |
$5.40 |
$6.00 |
$6.50 |
$6.60 |
$8.28 |
$5.00 |
| 50 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$137.30 |
$165.00 |
$155.00 |
$165.00 |
$206.95 |
$55.00 |
| 51 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$90,000.00 |
$112,500.00 |
$266,000.00 |
$118,000.00 |
$52,427.76 |
$181,000.00 |
| 52 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$171.10 |
$90.00 |
$105.00 |
$225.00 |
$368.37 |
$150.00 |
| 53 | 504(A) 1304 |
APPROACH SLAB | 195.6 | SY |
$165.70 |
$165.00 |
$155.00 |
$285.00 |
$265.79 |
$200.00 |
| 54 | 504(B) 1305 |
SAW-CUT GROOVING | 900.4 | SY |
$4.30 |
$5.00 |
$4.75 |
$5.06 |
$6.35 |
$5.00 |
| 55 | 504(C) 6250 |
SEALED EXPANSION JOINT | 50.2 | LF |
$246.40 |
$215.00 |
$175.00 |
$315.00 |
$255.24 |
$275.00 |
| 56 | 504(E) 6190 |
42" F-SHAPED PARAPET | 330.2 | LF |
$74.50 |
$65.00 |
$60.00 |
$112.00 |
$112.37 |
$140.00 |
| 57 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 138,920 | LB |
$1.60 |
$1.50 |
$1.98 |
$2.02 |
$2.76 |
$2.25 |
| 58 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 14 | EA |
$1,797.30 |
$1,500.00 |
$1,250.00 |
$1,600.00 |
$1,394.58 |
$1,800.00 |
| 59 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 28 | EA |
$1,689.80 |
$1,500.00 |
$1,250.00 |
$1,600.00 |
$1,394.58 |
$1,800.00 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 206.8 | CY |
$535.80 |
$700.00 |
$500.00 |
$675.00 |
$848.50 |
$650.00 |
| 61 | 509(B) 1328 |
CLASS A CONCRETE | 244.9 | CY |
$667.60 |
$600.00 |
$450.00 |
$690.00 |
$1,146.51 |
$825.00 |
| 62 | 510(C) 6138 |
SLOPE WALL (5") | 445.7 | SY |
$179.00 |
$70.00 |
$130.00 |
$127.00 |
$103.75 |
$120.00 |
| 63 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 86,112 | LB |
$1.00 |
$1.00 |
$1.00 |
$1.07 |
$1.35 |
$1.25 |
| 64 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$285.60 |
$200.00 |
$100.00 |
$475.00 |
$620.86 |
$300.00 |
| 65 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,076 | LF |
$35.00 |
$30.00 |
$30.00 |
$40.60 |
$23.32 |
$18.00 |
| 66 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,076 | LF |
$17.00 |
$15.00 |
$22.00 |
$17.40 |
$27.59 |
$35.00 |
| 67 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 68 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 596.8 | SY |
$4.00 |
$5.00 |
$4.10 |
$4.40 |
$5.52 |
$5.00 |
| 69 | 523(A) 6550 |
SEALER CRACK PREPARATION | 52.2 | LF |
$5.40 |
$6.00 |
$6.50 |
$6.60 |
$8.28 |
$5.00 |
| 70 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$137.30 |
$165.00 |
$155.00 |
$165.00 |
$206.95 |
$55.00 |
| 71 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$105,000.00 |
$112,500.00 |
$128,000.00 |
$118,000.00 |
$52,427.76 |
$181,000.00 |
| 72 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 1 | EA |
$3,855.10 |
$5,617.86 |
$7,225.00 |
$15,000.00 |
$6,898.39 |
$8,000.00 |
| 73 | 808 3107 |
PIER MOUNTED POLE BRACKET | 1 | EA |
$3,500.00 |
$9,000.00 |
$9,800.00 |
$12,500.00 |
$11,727.26 |
$9,000.00 |
| 74 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 11,193 | LF |
$0.9000 |
$0.8000 |
$0.8000 |
$0.7700 |
$0.9500 |
$0.7000 |
| 75 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 4,000 | LF |
$1.10 |
$1.00 |
$1.05 |
$1.09 |
$1.38 |
$1.00 |
| 76 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 31,070 | LF |
$0.7000 |
$0.6500 |
$0.6000 |
$1.02 |
$1.20 |
$0.9000 |
| 77 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 15,193 | LF |
$0.2000 |
$0.3000 |
$0.2700 |
$0.3000 |
$0.3600 |
$0.2700 |
| 78 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,400 | LF |
$20.00 |
$10.00 |
$30.00 |
$30.00 |
$32.95 |
$26.00 |
| 79 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 3,400 | LF |
$5.00 |
$6.00 |
$2.00 |
$4.50 |
$5.86 |
$6.00 |
| 80 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 33,100 | SD |
$0.1000 |
$0.1100 |
$0.1100 |
$0.0400 |
$0.0700 |
$0.0500 |
| 81 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$2.80 |
$1.10 |
$1.05 |
$1.20 |
$1.38 |
$1.00 |
| 82 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$0.8000 |
$1.10 |
$1.05 |
$0.0500 |
$0.0700 |
$0.0500 |
| 83 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 23,260 | SD |
$2.00 |
$0.0600 |
$0.0600 |
$0.0400 |
$0.0700 |
$0.0500 |
| 84 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,800 | SD |
$1.30 |
$2.20 |
$2.05 |
$6.15 |
$6.90 |
$5.00 |
| 85 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.6000 |
$3.30 |
$3.10 |
$0.2700 |
$27.59 |
$0.2600 |
| 86 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.40 |
$1.10 |
$1.05 |
$12.00 |
$11.04 |
$0.2500 |
| 87 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,060 | SD |
$0.8000 |
$0.2500 |
$0.2700 |
$0.1500 |
$0.1400 |
$8.00 |
| 88 | 880(F) 8878 |
DRUMS | 22,710 | SD |
$0.5000 |
$0.2500 |
$0.2600 |
$0.1200 |
$0.1400 |
$0.1100 |
| 89 | 880(G) 8884 |
TUBE CHANNELIZERS | 1,790 | SD |
$2.00 |
$1.10 |
$1.05 |
$0.0800 |
$0.1400 |
$0.1100 |
| 90 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 300 | HOUR |
$80.00 |
$35.00 |
$68.00 |
$85.00 |
$89.68 |
$70.00 |
| 91 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,200 | SD |
$8.90 |
$5.50 |
$6.00 |
$7.00 |
$8.28 |
$7.00 |
| 92 | 509(A) 0319 |
CLASS AA CONCRETE | 2 | CY |
$535.80 |
$1,100.00 |
$305.00 |
$1,000.00 |
$1,103.74 |
$1,000.00 |
| 93 | 509(D) 0325 |
CLASS C CONCRETE | 12 | CY |
$359.40 |
$400.00 |
$475.00 |
$815.00 |
$1,103.74 |
$1,000.00 |
| 94 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 1,426 | LF |
$7.50 |
$10.00 |
$7.50 |
$12.00 |
$4.30 |
$4.00 |
| 95 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,426 | LF |
$20.00 |
$25.00 |
$18.50 |
$20.00 |
$5.38 |
$5.00 |
| 96 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,426 | LF |
$20.00 |
$25.00 |
$11.00 |
$22.00 |
$9.98 |
$8.00 |
| 97 | 628(C) 5110 |
END ANCHORS | 4 | EA |
$4,000.00 |
$5,000.00 |
$2,000.00 |
$8,000.00 |
$9,657.75 |
$9,000.00 |
| 98 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$3,000.00 |
$5,000.00 |
$3,750.00 |
$5,000.00 |
$4,828.87 |
$5,000.00 |
| 99 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$15,000.00 |
$22,200.00 |
$22,000.00 |
$21,247.04 |
$15,000.00 |
| 100 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,145.60 |
$7,500.00 |
$1,659.00 |
$8,000.00 |
$2,069.52 |
$8,000.00 |
| 101 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$175,000.00 |
$191,204.00 |
$170,000.00 |
$95,000.00 |
$288,760.00 |