Bid tab 140099

Let May 15, 2014 · Division 6 · Harper Sign up free

‹ May 2014 results

BRIDGE AND APPROACHES SH -149: OVER BEAVER RIVER , 2.44 MILES EAST OF US -283. PROJECT LENGTH = 0.436 MILES

Let date
Thursday, May 15, 2014
Contract
140099
J/P numbers
10448(04)
District
Division 6
County
Harper
Highway
Limits
BRIDGE AND APPROACHES SH -149: OVER BEAVER RIVER , 2.44 MILES EAST OF US -283. PROJECT LENGTH = 0.436 MILES
Project number
STPY-030C(105)

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,187,027
1 Bridges, Inc. DBA Scudder Bridge Co. Low bidder $3,198,694 +0.4%
2 SEWELL BROS., INC. $3,378,702 +6.0% +5.6%
3 B & B BRIDGE COMPANY, LLC $3,415,754 +7.2% +6.8%
4 OBC, INC. $3,534,692 +10.9% +10.5%
5 IHC Scott, INC. $3,675,152 +15.3% +14.9%

Bid tab: unit prices 75 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Bridges, Inc. D…#2 SEWELL BROS., I…#3 B & B BRIDGE CO…#4 OBC, INC.#5 IHC Scott, INC.
1201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $5,000.00 $10,000.00 $2,572.50 $3,240.13 $6,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION14,801CY $7.50 $5.00 $8.00 $5.08 $6.41 $5.50
3202(D) 0184 UNCLASSIFIED BORROW4,806CY $9.00 $6.00 $10.00 $11.43 $14.40 $6.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $45,000.00 $5,100.00 $35,000.00 $24,120.86 $30,380.80 $7,000.00
5221(C) 2801 TEMPORARY SILT FENCE6,483LF $2.00 $1.28 $1.40 $1.28 $1.47 $1.60
6221(F) 0100 TEMPORARY SILT DIKE196LF $9.00 $9.50 $10.50 $9.50 $10.93 $9.00
7221(K) 0600 TEMPORARY FIBER LOG800LF $3.00 $3.20 $3.50 $3.20 $3.68 $2.00
8229 4318 DITCH LINER PROTECTION2,371LF $2.00 $1.65 $1.80 $1.65 $1.90 $2.20
9230(A) 2806 SOLID SLAB SODDING21,892SY $1.75 $1.78 $1.95 $1.78 $2.05 $2.60
10230(D) 2810 BROADCAST SPRIGGING (METHOD A)7,661SY $0.2000 $0.8300 $0.9000 $0.8300 $0.9600 $1.60
11230(F) 2812 WATERING1,182KGAL $10.00 $18.00 $20.00 $18.00 $20.70 $5.20
12232(A) 2813 SEEDING METHOD A7.68AC $700.00 $750.00 $825.00 $750.00 $862.50 $1,050.00
13233(A) 2817 VEGETATIVE MULCHING7.68AC $700.00 $500.00 $525.00 $500.00 $575.00 $1,050.00
14241 2832 MOWING19.38AC $90.00 $85.00 $95.00 $85.00 $97.75 $160.00
15307(A) 4200 FLY ASH532TON $65.00 $85.00 $85.00 $85.00 $74.75 $90.00
16307(K) 4300 STABILIZED SUBGRADE9,836SY $6.00 $3.25 $3.25 $3.25 $4.60 $3.50
17407(B) 0250 TACK COAT1,661GAL $3.50 $4.05 $4.45 $4.05 $4.66 $3.60
18408 5774 PRIME COAT4,357GAL $6.75 $5.00 $5.50 $5.00 $5.75 $3.60
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)3,633TON $90.00 $106.00 $120.00 $106.00 $121.90 $120.00
20411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,306TON $100.00 $118.00 $140.00 $118.00 $135.70 $120.00
21412 5267 COLD MILLING PAVEMENT534SY $10.00 $8.00 $10.00 $8.00 $12.65 $12.00
22509(D) 0325 CLASS C CONCRETE476CY $275.00 $425.00 $330.00 $400.00 $566.14 $370.00
23613(B) 0690 24" CORR. GALV. STEEL PIPE150LF $38.00 $31.00 $30.00 $35.00 $36.43 $45.00
24613(H) 0500 8" PERFORATED PIPE UNDERDRAIN ROUND150LF $45.00 $50.00 $30.00 $60.00 $38.48 $40.00
25613(I) 1097 8" NON-PERF.PIPE UNDERDRAIN RND.50LF $45.00 $50.00 $35.00 $65.00 $38.48 $40.00
26613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $750.00 $400.00 $225.00 $410.00 $495.97 $650.00
27613(Q) 5946 OUTLET LATERAL HEADWALL8EA $1,000.00 $1,150.00 $1,000.00 $1,250.00 $821.48 $770.00
28619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $25,000.00 $2,000.00 $2,500.00 $525.00 $6,411.25 $2,000.00
29619(B) 4728 REMOVAL OF ASPHALT PAVEMENT6,393SY $7.00 $2.00 $3.00 $2.00 $3.45 $3.80
30619(B) 4780 REMOVAL OF GUARDRAIL614LF $6.00 $3.50 $3.00 $2.10 $2.65 $5.00
31619(C) 0924 SAWING PAVEMENT461LF $3.00 $3.00 $5.00 $10.00 $4.60 $3.00
32623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE537.5LF $17.00 $15.75 $17.35 $15.75 $18.11 $19.00
33623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,150.00 $2,050.00 $2,255.00 $2,250.00 $3,357.50 $2,100.00
34623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,500.00 $1,395.00 $1,535.00 $1,395.00 $1,604.25 $1,900.00
35853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)18EA $20.00 $10.00 $12.00 $10.00 $11.50 $12.00
36501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON216CY $20.00 $18.00 $15.00 $35.00 $16.50 $29.00
37501(G) 6309 CLSM BACKFILL132.6CY $175.00 $200.00 $175.00 $185.00 $170.52 $200.00
38503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,473.34LF $255.00 $295.00 $220.00 $285.00 $237.62 $240.00
39504(A) 1304 APPROACH SLAB318.4SY $200.00 $180.00 $220.00 $225.00 $177.87 $200.00
40504(B) 1305 SAW-CUT GROOVING1,963.3SY $5.00 $4.75 $4.20 $3.80 $4.18 $5.00
41504(C) 6250 SEALED EXPANSION JOINT97.37LF $275.00 $285.00 $255.00 $185.00 $291.58 $250.00
42504(D) 6245 CONCRETE RAIL (TR4)883.5LF $75.00 $68.00 $90.00 $75.00 $99.17 $85.00
43506(A) 1322 STRUCTURAL STEEL2,740LB $4.00 $4.75 $2.50 $4.00 $2.65 $4.00
44507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY16EA $2,000.00 $2,000.00 $2,000.00 $2,000.00 $1,696.15 $2,000.00
45507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY24EA $2,000.00 $2,000.00 $2,000.00 $2,000.00 $1,696.15 $2,000.00
46509(A) 1326 CLASS AA CONCRETE408CY $600.00 $525.00 $600.00 $600.00 $605.80 $700.00
47509(B) 1328 CLASS A CONCRETE303.5CY $615.00 $560.00 $650.00 $600.00 $628.61 $580.00
48509(D) 1331 CLASS C CONCRETE7.25CY $470.00 $600.00 $400.00 $975.00 $552.53 $880.00
49511(A) 0332 REINFORCING STEEL380LB $1.20 $1.40 $2.00 $3.50 $0.9700 $1.20
50511(B) 6010 EPOXY COATED REINFORCING STEEL157,300LB $1.20 $1.05 $1.00 $1.10 $1.05 $1.10
51514(A) 6010 PILES, FURNISHED (HP 10X42)288LF $35.00 $40.00 $30.00 $37.00 $43.70 $30.00
52514(A) 6011 PILES, FURNISHED (HP 12X53)957LF $40.00 $47.00 $35.00 $41.50 $50.95 $35.00
53514(B) 6292 PILES, DRIVEN (HP 10X42)288LF $15.00 $10.00 $15.00 $30.00 $16.50 $25.00
54514(B) 6294 PILES, DRIVEN (HP 12X53)957LF $17.00 $10.00 $15.00 $22.75 $16.50 $30.00
55515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,897.5SY $4.00 $3.50 $3.50 $3.50 $3.52 $5.00
56516(A) 6096 DRILLED SHAFTS 60" DIAMETER496LF $725.00 $950.00 $925.00 $850.00 $918.49 $930.00
57516(C) 6200 CROSSHOLE SONIC LOGGING8EA $1,500.00 $1,250.00 $7,500.00 $2,000.00 $1,980.00 $1,400.00
58523(A) 6550 SEALER CRACK PREPARATION194.7LF $3.50 $4.00 $5.00 $4.00 $4.40 $4.00
59523(B) 6560 SEALER RESIN2GAL $200.00 $100.00 $250.00 $100.00 $110.00 $200.00
60601(B) 1353 TYPE I-A PLAIN RIPRAP710TON $50.00 $62.00 $58.00 $67.18 $57.02 $89.00
61601(C) 1355 TYPE I-A FILTER BLANKET140TON $45.00 $50.00 $50.00 $58.40 $48.98 $100.00
62613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND96LF $25.00 $17.00 $25.00 $40.00 $29.33 $30.00
63613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.72LF $30.00 $17.00 $25.00 $40.00 $29.94 $30.00
64619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $60,000.00 $50,000.00 $30,000.00 $37,125.00 $146,000.00
65880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF16,500SD $0.3000 $0.2500 $0.2800 $0.2500 $0.2800 $0.6000
66880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,850SD $1.00 $1.00 $1.50 $1.00 $1.10 $1.10
67880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF600SD $1.80 $3.00 $3.20 $3.00 $3.30 $1.10
68880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,800SD $0.5000 $0.7500 $0.8500 $0.7500 $0.8300 $1.60
69880(E) 8860 WARNING LIGHTS(TYPE A)3,600SD $0.1500 $1.00 $1.05 $1.00 $1.10 $0.3500
70850(A) 8110 SHEET ALUMINUM SIGNS30SF $17.55 $30.00 $31.00 $30.00 $33.00 $50.00
71851(C) 8324 2" SQUARE TUBE POST64LF $8.50 $16.00 $17.00 $16.00 $17.60 $6.00
72854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)13,600LF $0.2000 $0.2500 $0.2800 $0.2500 $0.2800 $0.2000
73642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $12,675.00 $14,000.00 $15,000.00 $13,942.50 $57,000.00
74220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,500.00 $4,500.00 $6,000.00 $3,300.00 $5,500.00
75641 1399 MOBILIZATION1LSUM $175,000.00 $98,000.00 $150,000.00 $280,000.00 $201,822.65 $310,000.00