| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$28,000.00 |
$47,752.68 |
$40,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 125,041 | CY |
$5.00 |
$4.25 |
$4.25 |
$7.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 52,239 | CY |
$10.00 |
$8.05 |
$8.05 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$39,147.32 |
$33,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,300 | LF |
$2.00 |
$2.50 |
$1.18 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.50 |
$9.00 |
$7.88 |
$9.00 |
| 7 | 221(K) 0600 |
TEMPORARY FIBER LOG | 6,800 | LF |
$3.00 |
$2.50 |
$1.88 |
$2.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 50,950 | SY |
$1.75 |
$1.50 |
$1.40 |
$1.54 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 6.06 | AC |
$500.00 |
$625.00 |
$612.00 |
$675.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 16.59 | AC |
$530.00 |
$600.00 |
$584.00 |
$645.00 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 5.1 | TON |
$720.00 |
$800.00 |
$788.00 |
$865.00 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 40,650 | SY |
$1.25 |
$0.4000 |
$0.4000 |
$1.80 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 448 | TON |
$40.00 |
$50.00 |
$35.30 |
$37.00 |
| 14 | 407(B) 0250 |
TACK COAT | 7,120 | GAL |
$3.05 |
$2.50 |
$2.25 |
$6.30 |
| 15 | 408 5774 |
PRIME COAT | 14,235 | GAL |
$4.30 |
$3.50 |
$3.25 |
$6.30 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 16,560 | TON |
$84.00 |
$84.00 |
$93.00 |
$100.00 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,465 | TON |
$95.00 |
$97.00 |
$121.00 |
$142.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 500 | TON |
$95.00 |
$87.00 |
$102.00 |
$155.00 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 81 | CY |
$20.00 |
$5.00 |
$35.00 |
$20.00 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 167.1 | CY |
$490.00 |
$475.00 |
$415.00 |
$400.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 200 | CY |
$310.00 |
$400.00 |
$270.00 |
$300.00 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 24,690 | LB |
$0.9000 |
$0.9000 |
$0.8500 |
$1.00 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 20 | TON |
$60.00 |
$75.00 |
$52.58 |
$100.00 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 70 | LF |
$50.00 |
$53.82 |
$53.82 |
$51.00 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 172 | LF |
$30.00 |
$42.00 |
$42.00 |
$25.00 |
| 26 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 66 | LF |
$50.00 |
$43.76 |
$43.76 |
$31.00 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,600.00 |
$1,500.00 |
$1,050.00 |
| 28 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$2,000.00 |
$1,800.00 |
$1,100.00 |
| 29 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 4 | EA |
$1,600.00 |
$2,700.00 |
$2,000.00 |
$1,200.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$2,700.00 |
$12,700.00 |
$5,000.00 |
| 31 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,000.00 |
$2,000.00 |
$1,500.00 |
$1,500.00 |
| 32 | 619(B) 4725 |
REMOVAL OF FENCE | 7,324 | LF |
$2.50 |
$0.7500 |
$0.9000 |
$1.00 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 25,315 | SY |
$3.00 |
$5.00 |
$5.00 |
$4.00 |
| 34 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,350 | LF |
$2.50 |
$2.25 |
$3.00 |
$2.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 2,470 | LF |
$2.55 |
$3.00 |
$3.00 |
$4.00 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,200 | LF |
$15.00 |
$16.50 |
$16.50 |
$18.15 |
| 37 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,100.00 |
$2,000.00 |
$2,000.00 |
$2,200.00 |
| 38 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,300.00 |
$1,550.00 |
$1,550.00 |
$1,705.00 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,343 | LF |
$4.00 |
$4.00 |
$3.10 |
$4.25 |
| 40 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 30 | EA |
$10.00 |
$20.00 |
$20.00 |
$22.00 |
| 41 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$17.00 |
$14.50 |
$14.50 |
$20.00 |
| 42 | 501(G) 6309 |
CLSM BACKFILL | 206 | CY |
$140.00 |
$161.06 |
$161.06 |
$200.00 |
| 43 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 957 | LF |
$220.00 |
$258.00 |
$258.00 |
$217.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$175.00 |
$146.00 |
$146.00 |
$180.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 1,340.8 | SY |
$4.30 |
$4.05 |
$4.05 |
$4.25 |
| 46 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$275.00 |
$240.00 |
$240.00 |
$260.00 |
| 47 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 603.4 | LF |
$72.00 |
$52.00 |
$52.00 |
$70.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$3.00 |
$1.65 |
$1.65 |
$4.00 |
| 49 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,500.00 |
$1,491.42 |
$1,491.42 |
$1,800.00 |
| 50 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,513.13 |
$1,513.13 |
$1,800.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 283.9 | CY |
$495.00 |
$480.00 |
$480.00 |
$600.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 194.69 | CY |
$545.00 |
$410.00 |
$410.00 |
$650.00 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 1,100 | LB |
$0.9500 |
$0.9000 |
$0.9000 |
$1.00 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 96,190 | LB |
$1.10 |
$0.9200 |
$0.9200 |
$1.00 |
| 55 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 296 | LF |
$32.00 |
$29.72 |
$29.72 |
$30.00 |
| 56 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 988 | LF |
$38.00 |
$37.51 |
$37.51 |
$35.00 |
| 57 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 296 | LF |
$15.00 |
$6.25 |
$6.25 |
$15.00 |
| 58 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 988 | LF |
$14.00 |
$6.25 |
$6.25 |
$15.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,140.8 | SY |
$4.50 |
$3.65 |
$3.65 |
$3.50 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 243 | LF |
$680.00 |
$735.00 |
$735.00 |
$850.00 |
| 61 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$4.50 |
$4.00 |
$4.00 |
$6.00 |
| 62 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$100.00 |
$100.00 |
$500.00 |
| 63 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,300 | TON |
$48.00 |
$54.00 |
$54.00 |
$50.00 |
| 64 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 950 | TON |
$40.00 |
$38.50 |
$38.50 |
$38.00 |
| 65 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$24.00 |
$24.00 |
$24.00 |
$25.00 |
| 66 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 84 | LF |
$25.00 |
$22.00 |
$22.00 |
$25.00 |
| 67 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$24,000.00 |
$39,000.00 |
$40,000.00 |
| 68 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,500.00 |
$100.00 |
$100.00 |
$125.00 |
| 69 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 161.5 | SF |
$17.00 |
$15.00 |
$15.00 |
$15.25 |
| 70 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 240 | LF |
$10.00 |
$10.00 |
$10.00 |
$10.25 |
| 71 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 23,350 | LF |
$0.4000 |
$0.6500 |
$0.6500 |
$0.6700 |
| 72 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 24,000 | LF |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1100 |
| 73 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,280 | EA |
$0.6500 |
$0.4500 |
$0.4500 |
$0.4700 |
| 74 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,100 | LF |
$0.2500 |
$0.2000 |
$0.2000 |
$0.2200 |
| 75 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,360 | SD |
$0.3500 |
$0.4500 |
$0.4500 |
$0.4600 |
| 76 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,800 | SD |
$0.6000 |
$1.00 |
$1.00 |
$1.10 |
| 77 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,920 | SD |
$1.90 |
$2.00 |
$2.00 |
$2.10 |
| 78 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,360 | SD |
$1.60 |
$0.5000 |
$0.5000 |
$0.5500 |
| 79 | 880(C) 8848 |
WING BARRICADES | 3,360 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0400 |
| 80 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,720 | SD |
$0.1800 |
$0.1000 |
$0.1000 |
$0.1200 |
| 81 | 880(F) 8878 |
DRUMS | 8,400 | SD |
$0.3000 |
$0.3500 |
$0.3500 |
$0.3700 |
| 82 | 880(G) 8884 |
TUBE CHANNELIZERS | 33,600 | SD |
$0.1500 |
$0.0500 |
$0.0500 |
$0.0700 |
| 83 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 560 | SD |
$15.00 |
$22.00 |
$22.00 |
$24.00 |
| 84 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$22,000.00 |
$26,000.00 |
$25,800.00 |
$31,500.00 |
| 85 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$18,000.00 |
$12,000.00 |
$8,000.00 |
| 86 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$270,000.00 |
$266,500.00 |
$275,000.00 |
$250,000.00 |
| 87 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$10,000.00 |
$33,000.00 |
$35,000.00 |
$8,800.00 |