| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$31,500.00 |
$35,000.00 |
$100,000.00 |
$125,000.00 |
$150,255.00 |
$35,000.00 |
$12,304.70 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 37,435 | CY |
$6.50 |
$4.50 |
$5.15 |
$7.00 |
$8.13 |
$8.21 |
$7.72 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 112,758 | CY |
$8.00 |
$5.50 |
$5.15 |
$7.00 |
$9.39 |
$9.52 |
$8.65 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,839.00 |
$18,000.00 |
$55,922.88 |
$40,000.00 |
$37,537.50 |
$38,073.75 |
$26,864.01 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,137 | LF |
$2.50 |
$2.10 |
$3.48 |
$1.00 |
$1.15 |
$1.13 |
$1.06 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 126 | LF |
$8.00 |
$8.00 |
$8.95 |
$9.00 |
$9.40 |
$10.53 |
$9.89 |
| 7 | 221(K) 0600 |
TEMPORARY FIBER LOG | 2,472 | LF |
$5.00 |
$5.00 |
$3.89 |
$3.00 |
$3.10 |
$4.24 |
$3.98 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 47,149 | SY |
$1.50 |
$1.25 |
$1.48 |
$1.40 |
$1.41 |
$1.45 |
$1.19 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 11.88 | AC |
$300.00 |
$155.00 |
$155.00 |
$250.00 |
$261.45 |
$159.75 |
$150.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.88 | AC |
$300.00 |
$410.00 |
$400.00 |
$200.00 |
$204.75 |
$423.87 |
$398.00 |
| 11 | 241 2832 |
MOWING | 42.96 | AC |
$55.00 |
$60.00 |
$73.12 |
$60.00 |
$61.95 |
$62.83 |
$59.00 |
| 12 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$23,000.00 |
$2,500.00 |
$1,749.45 |
$2,500.00 |
$15,750.00 |
$2,643.49 |
$3,928.77 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,294 | CY |
$45.00 |
$41.00 |
$45.66 |
$37.00 |
$39.89 |
$40.46 |
$45.00 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 25,274 | SY |
$6.00 |
$5.85 |
$4.59 |
$6.00 |
$7.22 |
$7.33 |
$5.50 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 19,569 | SY |
$1.50 |
$1.20 |
$1.02 |
$1.00 |
$1.27 |
$1.29 |
$1.55 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,432 | TON |
$25.00 |
$23.00 |
$23.03 |
$18.00 |
$22.12 |
$21.34 |
$22.55 |
| 17 | 407(B) 0250 |
TACK COAT | 3,618 | GAL |
$3.00 |
$3.35 |
$4.57 |
$2.00 |
$3.41 |
$3.46 |
$2.85 |
| 18 | 408 5774 |
PRIME COAT | 14,506 | GAL |
$2.00 |
$5.05 |
$6.00 |
$0.8000 |
$5.25 |
$5.33 |
$4.80 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,315 | TON |
$78.00 |
$65.00 |
$71.24 |
$50.00 |
$66.78 |
$67.73 |
$78.75 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,042 | TON |
$72.00 |
$57.00 |
$64.16 |
$45.00 |
$58.80 |
$59.64 |
$64.40 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 862 | TON |
$89.00 |
$79.00 |
$88.87 |
$60.00 |
$80.85 |
$82.01 |
$96.35 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,881 | TON |
$82.00 |
$73.50 |
$70.02 |
$55.00 |
$74.55 |
$75.62 |
$80.05 |
| 23 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 50 | TON |
$110.00 |
$124.00 |
$125.00 |
$190.00 |
$126.00 |
$127.80 |
$200.00 |
| 24 | 514(J) 6390 |
TEMPORARY SHEET PILING | 1 | LSUM |
$75,000.00 |
$50,000.00 |
$40,015.04 |
$40,000.00 |
$89,250.00 |
$121,176.67 |
$80,000.00 |
| 25 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 113 | LF |
$40.00 |
$30.00 |
$29.45 |
$20.00 |
$40.70 |
$23.69 |
$50.00 |
| 26 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 1,671 | LF |
$40.00 |
$17.00 |
$29.45 |
$20.00 |
$40.70 |
$22.11 |
$50.00 |
| 27 | 610(A) 0604 |
5" CONCRETE SIDEWALK | 667 | SY |
$50.00 |
$40.00 |
$40.74 |
$50.00 |
$79.70 |
$51.83 |
$100.00 |
| 28 | 610(A) 0652 |
5" DECORATIVE CONCRETE SIDEWALK | 267 | SY |
$100.00 |
$40.00 |
$91.48 |
$75.00 |
$112.74 |
$102.62 |
$125.00 |
| 29 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 7 | SY |
$150.00 |
$160.00 |
$74.36 |
$400.00 |
$94.60 |
$90.53 |
$125.00 |
| 30 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 20 | SF |
$60.00 |
$50.00 |
$24.78 |
$60.00 |
$67.45 |
$19.17 |
$50.00 |
| 31 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$3,000.00 |
$6,300.00 |
$3,345.54 |
$3,500.00 |
$4,725.00 |
$4,792.50 |
$6,271.32 |
| 32 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$3,600.00 |
$4,300.00 |
$5,033.93 |
$4,000.00 |
$6,510.00 |
$6,603.00 |
$7,354.36 |
| 33 | 611(G) 5117 |
INLET CI DES. 2 (2B) | 1 | EA |
$5,000.00 |
$4,700.00 |
$4,844.84 |
$4,500.00 |
$6,210.75 |
$6,299.48 |
$7,050.59 |
| 34 | 611(G) 5121 |
INLET CI DES. 3 (B) | 1 | EA |
$5,700.00 |
$5,300.00 |
$6,378.85 |
$6,000.00 |
$7,003.50 |
$7,103.55 |
$7,843.04 |
| 35 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 238 | LF |
$70.00 |
$45.00 |
$65.12 |
$65.00 |
$56.11 |
$56.91 |
$52.56 |
| 36 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 96 | LF |
$80.00 |
$52.00 |
$71.93 |
$75.00 |
$67.96 |
$68.93 |
$64.51 |
| 37 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 96 | LF |
$100.00 |
$65.00 |
$101.68 |
$95.00 |
$81.97 |
$83.14 |
$74.30 |
| 38 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 48 | LF |
$110.00 |
$75.00 |
$112.43 |
$105.00 |
$99.36 |
$100.78 |
$91.01 |
| 39 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 58 | LF |
$190.00 |
$105.00 |
$228.70 |
$195.00 |
$154.36 |
$156.57 |
$157.82 |
| 40 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 108 | LF |
$250.00 |
$220.00 |
$320.19 |
$250.00 |
$215.68 |
$218.76 |
$208.55 |
| 41 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 648 | LF |
$33.00 |
$32.00 |
$32.00 |
$50.00 |
$30.09 |
$30.52 |
$40.81 |
| 42 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 220 | LF |
$50.00 |
$37.00 |
$38.17 |
$55.00 |
$40.66 |
$41.24 |
$45.47 |
| 43 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 88 | LF |
$60.00 |
$42.00 |
$135.22 |
$60.00 |
$50.39 |
$51.11 |
$52.09 |
| 44 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 58 | LF |
$80.00 |
$47.00 |
$139.82 |
$65.00 |
$62.98 |
$63.88 |
$57.27 |
| 45 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 152 | LF |
$170.00 |
$77.23 |
$160.96 |
$95.00 |
$98.43 |
$99.83 |
$148.71 |
| 46 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 48 | LF |
$45.00 |
$33.00 |
$43.67 |
$60.00 |
$35.33 |
$35.84 |
$41.93 |
| 47 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,200 | LF |
$10.00 |
$12.50 |
$6.60 |
$7.00 |
$10.50 |
$12.78 |
$15.00 |
| 48 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 35 | LF |
$10.00 |
$12.50 |
$10.00 |
$7.00 |
$16.80 |
$26.63 |
$20.00 |
| 49 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$2,500.00 |
$3,900.00 |
$4,373.76 |
$3,400.00 |
$3,013.50 |
$3,056.55 |
$2,531.98 |
| 50 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$700.00 |
$750.00 |
$804.64 |
$700.00 |
$1,076.25 |
$1,091.63 |
$930.34 |
| 51 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$750.00 |
$775.00 |
$787.09 |
$800.00 |
$1,103.55 |
$1,119.32 |
$960.79 |
| 52 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,200.00 |
$650.00 |
$751.19 |
$1,000.00 |
$1,680.00 |
$1,704.00 |
$1,137.40 |
| 53 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,500.00 |
$1,625.00 |
$1,244.75 |
$1,400.00 |
$1,622.25 |
$1,645.43 |
$1,478.43 |
| 54 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,000.00 |
$2,400.00 |
$3,042.59 |
$2,200.00 |
$2,215.50 |
$2,247.15 |
$2,056.97 |
| 55 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$900.00 |
$325.00 |
$527.03 |
$1,200.00 |
$1,260.00 |
$977.36 |
$2,000.00 |
| 56 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 66 | CY |
$60.00 |
$32.00 |
$12.00 |
$50.00 |
$45.15 |
$45.80 |
$60.00 |
| 57 | 613(V) 1180 |
TRENCH EXCAVATION | 29 | CY |
$12.00 |
$15.00 |
$5.00 |
$20.00 |
$10.37 |
$10.52 |
$20.00 |
| 58 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$100,000.00 |
$20,000.00 |
$12,052.17 |
$85,000.00 |
$14,805.00 |
$35,000.00 |
$10,724.25 |
| 59 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 16,774 | SY |
$4.00 |
$2.50 |
$3.86 |
$3.00 |
$4.73 |
$5.00 |
$3.84 |
| 60 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,767 | LF |
$6.00 |
$2.50 |
$3.10 |
$3.00 |
$2.10 |
$2.66 |
$2.00 |
| 61 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 675 | LF |
$20.00 |
$19.50 |
$19.52 |
$15.00 |
$16.54 |
$16.77 |
$13.65 |
| 62 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,350.00 |
$2,683.36 |
$1,900.00 |
$2,273.25 |
$2,305.73 |
$1,750.00 |
| 63 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,950.00 |
$1,735.19 |
$1,400.00 |
$1,470.00 |
$1,491.00 |
$1,300.00 |
| 64 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$900.00 |
$950.00 |
$929.56 |
$880.00 |
$840.00 |
$852.00 |
$750.00 |
| 65 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,295 | LF |
$5.00 |
$8.50 |
$4.34 |
$9.00 |
$8.82 |
$6.27 |
$3.50 |
| 66 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$13.00 |
$10.50 |
$12.39 |
$16.50 |
$10.50 |
$10.65 |
$15.00 |
| 67 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 250 | DAY |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
$475.00 |
| 68 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 980 | CY |
$25.00 |
$40.00 |
$15.74 |
$41.75 |
$23.76 |
$19.93 |
$10.00 |
| 69 | 501(G) 6309 |
CLSM BACKFILL | 787 | CY |
$160.00 |
$115.00 |
$157.92 |
$85.00 |
$122.95 |
$113.90 |
$130.00 |
| 70 | 504(A) 1304 |
APPROACH SLAB | 656 | SY |
$180.00 |
$145.00 |
$188.59 |
$145.00 |
$244.16 |
$129.56 |
$200.00 |
| 71 | 504(B) 1305 |
SAW-CUT GROOVING | 2,731 | SY |
$5.00 |
$4.10 |
$4.96 |
$4.40 |
$4.32 |
$4.26 |
$5.00 |
| 72 | 504(C) 6250 |
SEALED EXPANSION JOINT | 161.5 | LF |
$300.00 |
$215.00 |
$226.19 |
$210.00 |
$285.39 |
$178.26 |
$250.00 |
| 73 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,380.4 | LF |
$90.00 |
$65.00 |
$85.55 |
$75.00 |
$132.80 |
$147.77 |
$100.00 |
| 74 | 506(A) 1322 |
STRUCTURAL STEEL | 1,580,140 | LB |
$1.80 |
$1.43 |
$1.35 |
$1.40 |
$1.40 |
$1.72 |
$1.54 |
| 75 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$2,000.00 |
$2,500.00 |
$2,636.66 |
$3,000.00 |
$2,907.55 |
$1,714.61 |
$3,500.00 |
| 76 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$2,000.00 |
$2,500.00 |
$2,636.66 |
$3,000.00 |
$2,907.55 |
$1,714.78 |
$3,800.00 |
| 77 | 509(A) 1326 |
CLASS AA CONCRETE | 640.9 | CY |
$600.00 |
$465.00 |
$625.43 |
$700.00 |
$489.16 |
$650.00 |
$600.00 |
| 78 | 509(B) 1328 |
CLASS A CONCRETE | 625.3 | CY |
$600.00 |
$500.00 |
$684.94 |
$600.00 |
$540.80 |
$550.00 |
$500.00 |
| 79 | 509(D) 1331 |
CLASS C CONCRETE | 12 | CY |
$600.00 |
$575.00 |
$483.38 |
$500.00 |
$458.57 |
$1,836.06 |
$1,000.00 |
| 80 | 510(C) 6138 |
SLOPE WALL (5") | 3,438 | SY |
$112.00 |
$90.00 |
$58.53 |
$72.00 |
$75.20 |
$111.91 |
$125.00 |
| 81 | 510(D) 6341 |
MSE RETAINING WALL | 855 | SY |
$650.00 |
$625.00 |
$704.62 |
$650.00 |
$636.22 |
$715.07 |
$850.00 |
| 82 | 511(A) 1332 |
REINFORCING STEEL | 2,070 | LB |
$1.00 |
$1.50 |
$0.8500 |
$1.00 |
$1.12 |
$0.9000 |
$1.50 |
| 83 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 303,260 | LB |
$1.10 |
$1.00 |
$0.9700 |
$1.00 |
$1.01 |
$1.10 |
$1.00 |
| 84 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 150 | SY |
$400.00 |
$375.00 |
$295.00 |
$500.00 |
$562.09 |
$251.90 |
$700.00 |
| 85 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 368 | LF |
$32.00 |
$33.00 |
$25.50 |
$25.00 |
$29.78 |
$22.41 |
$32.00 |
| 86 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,944 | LF |
$35.00 |
$35.00 |
$32.06 |
$30.00 |
$35.60 |
$27.85 |
$39.00 |
| 87 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 368 | LF |
$20.00 |
$10.00 |
$24.86 |
$20.00 |
$15.12 |
$26.72 |
$5.00 |
| 88 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,944 | LF |
$20.00 |
$10.00 |
$26.20 |
$20.00 |
$10.80 |
$23.21 |
$5.00 |
| 89 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 90 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,872 | SY |
$5.00 |
$3.60 |
$4.34 |
$4.00 |
$3.78 |
$3.73 |
$3.50 |
| 91 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 92 | LF |
$2,000.00 |
$2,100.00 |
$1,795.53 |
$1,100.00 |
$1,405.50 |
$1,230.63 |
$1,750.00 |
| 92 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$2,000.00 |
$2,045.05 |
$6,500.00 |
$11,664.00 |
$852.00 |
$1,500.00 |
| 93 | 523(A) 6550 |
SEALER CRACK PREPARATION | 320 | LF |
$4.00 |
$4.10 |
$4.96 |
$4.40 |
$4.32 |
$4.26 |
$4.00 |
| 94 | 523(B) 6560 |
SEALER RESIN | 2.2 | GAL |
$150.00 |
$105.00 |
$123.94 |
$110.00 |
$108.00 |
$106.50 |
$100.00 |
| 95 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 646 | LF |
$20.00 |
$18.00 |
$15.75 |
$20.00 |
$24.45 |
$16.85 |
$20.00 |
| 96 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$18.00 |
$10.55 |
$20.00 |
$24.45 |
$19.52 |
$22.00 |
| 97 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 70 | CY |
$55.00 |
$42.00 |
$46.31 |
$25.00 |
$27.00 |
$57.65 |
$40.00 |
| 98 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$50,000.00 |
$144,817.22 |
$175,000.00 |
$216,000.00 |
$133,261.52 |
$80,000.00 |
| 99 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 18,080 | LF |
$0.8500 |
$0.6200 |
$0.7400 |
$0.6500 |
$0.6300 |
$0.6400 |
$0.5000 |
| 100 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 370 | SD |
$20.00 |
$1.05 |
$1.24 |
$1.10 |
$1.05 |
$1.07 |
$5.00 |
| 101 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,660 | SD |
$0.5500 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1100 |
$0.2500 |
| 102 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,700 | SD |
$1.55 |
$2.05 |
$2.48 |
$2.20 |
$2.10 |
$2.13 |
$1.50 |
| 103 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,290 | SD |
$1.00 |
$0.2600 |
$0.3100 |
$0.3000 |
$0.2600 |
$0.2700 |
$2.00 |
| 104 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,440 | SD |
$1.50 |
$1.05 |
$1.24 |
$1.10 |
$1.05 |
$1.07 |
$0.5000 |
| 105 | 880(C) 8848 |
WING BARRICADES | 1,480 | SD |
$1.25 |
$0.2600 |
$0.3100 |
$0.3000 |
$0.2600 |
$0.2700 |
$3.00 |
| 106 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,550 | SD |
$0.2500 |
$1.05 |
$1.24 |
$1.10 |
$1.05 |
$1.07 |
$0.4500 |
| 107 | 880(F) 8878 |
DRUMS | 12,950 | SD |
$0.2500 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1100 |
$0.3500 |
| 108 | 880(G) 8890 |
CHANNELIZER CONES | 4,810 | SD |
$0.2500 |
$0.2600 |
$0.3100 |
$0.3000 |
$0.2600 |
$0.2700 |
$0.3500 |
| 109 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 768 | SD |
$11.00 |
$5.15 |
$6.20 |
$5.50 |
$5.25 |
$5.33 |
$10.00 |
| 110 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 77.25 | SF |
$20.00 |
$25.50 |
$30.98 |
$26.00 |
$26.25 |
$26.62 |
$15.00 |
| 111 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 180 | LF |
$10.00 |
$8.30 |
$9.91 |
$8.80 |
$8.40 |
$8.52 |
$10.00 |
| 112 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,600 | LF |
$0.4700 |
$0.4500 |
$0.5200 |
$0.4600 |
$0.4400 |
$0.4500 |
$0.6500 |
| 113 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$110,000.00 |
$32,000.00 |
$77,711.93 |
$42,641.00 |
$39,900.00 |
$29,500.50 |
$27,700.00 |
| 114 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,000.00 |
$3,098.56 |
$10,000.00 |
$5,243.00 |
$660.36 |
$36,750.00 |
| 115 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$455,000.00 |
$388,300.00 |
$341,116.37 |
$410,000.00 |
$394,136.56 |
$500,000.00 |
$792,000.00 |