| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 78,140 | CY |
$8.00 |
$14.00 |
$10.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,300 | CY |
$15.00 |
$6.00 |
$20.00 |
| 3 | 221(K) 0600 |
TEMPORARY FIBER LOG | 50,888 | LF |
$2.00 |
$7.70 |
$3.14 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 25,808 | SY |
$2.75 |
$3.53 |
$3.20 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 29,209 | CY |
$52.00 |
$45.31 |
$36.59 |
| 6 | 307(K) 4300 |
STABILIZED SUBGRADE | 156,314 | SY |
$5.40 |
$4.81 |
$3.54 |
| 7 | 317 4270 |
CEMENT TREATED BASE | 118,272 | SY |
$12.00 |
$13.40 |
$10.57 |
| 8 | 325 5271 |
SEPARATOR FABRIC | 168,960 | SY |
$1.00 |
$1.15 |
$1.18 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 36,734 | TON |
$22.00 |
$22.11 |
$28.01 |
| 10 | 408 5774 |
PRIME COAT | 93,256 | GAL |
$2.00 |
$1.00 |
$1.00 |
| 11 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 44,198 | SY |
$13.00 |
$14.96 |
$24.98 |
| 12 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 84,480 | SY |
$19.00 |
$22.97 |
$35.19 |
| 13 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 40,509 | CY |
$118.00 |
$108.17 |
$125.00 |
| 14 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,260 | LF |
$25.00 |
$21.86 |
$70.00 |
| 15 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,800 | LF |
$15.00 |
$11.89 |
$8.06 |
| 16 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 600 | LF |
$20.00 |
$5.82 |
$8.70 |
| 17 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 50,688 | LF |
$11.00 |
$7.49 |
$6.82 |
| 18 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 669 | LF |
$12.00 |
$17.71 |
$7.63 |
| 19 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,370.00 |
$1,509.36 |
$6,000.00 |
| 20 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 86 | EA |
$800.00 |
$375.05 |
$340.49 |
| 21 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 3,481 | SY |
$10.00 |
$4.51 |
$3.58 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 115,800 | SY |
$4.00 |
$3.52 |
$5.00 |
| 23 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,950 | LF |
$3.75 |
$4.70 |
$6.00 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 44,153 | LF |
$4.00 |
$0.7900 |
$1.00 |
| 25 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,679 | LF |
$22.00 |
$20.72 |
$18.11 |
| 26 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$825.00 |
$1,218.88 |
$852.00 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$4,083.90 |
$2,603.93 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$2,000.00 |
$3,688.72 |
$1,837.13 |
| 29 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 45 | EA |
$15.00 |
$16.68 |
$18.11 |
| 30 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 88,636 | LF |
$0.6500 |
$0.4400 |
$0.3600 |
| 31 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 88,636 | LF |
$0.7500 |
$1.05 |
$0.8700 |
| 32 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,950 | EA |
$0.5500 |
$0.6400 |
$0.5300 |
| 33 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 88,636 | LF |
$0.1500 |
$0.2600 |
$0.2100 |
| 34 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 750 | SD |
$15.00 |
$6.42 |
$5.33 |
| 35 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 24,000 | LF |
$25.00 |
$19.64 |
$34.99 |
| 36 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 64,728 | LF |
$3.00 |
$2.18 |
$2.62 |
| 37 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 552,000 | SD |
$0.1000 |
$0.0300 |
$0.0200 |
| 38 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 500 | SD |
$4.50 |
$1.28 |
$1.07 |
| 39 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,500 | SD |
$0.3500 |
$1.28 |
$1.07 |
| 40 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,000 | SD |
$0.5500 |
$0.3200 |
$0.2700 |
| 41 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 11,500 | SD |
$1.45 |
$0.3900 |
$0.3200 |
| 42 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 8,750 | SD |
$0.7500 |
$0.0600 |
$0.0500 |
| 43 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$1.75 |
$1.28 |
$1.07 |
| 44 | 880(D) 8854 |
VERTICAL PANELS | 63,500 | SD |
$0.1500 |
$0.0300 |
$0.0200 |
| 45 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 23,000 | SD |
$0.3500 |
$0.0600 |
$0.0500 |
| 46 | 880(F) 8878 |
DRUMS | 38,210 | SD |
$0.2000 |
$1.22 |
$1.01 |
| 47 | 880(G) 8890 |
CHANNELIZER CONES | 42,000 | SD |
$0.3000 |
$0.0300 |
$0.0200 |
| 48 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 2,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
| 49 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 4,160 | SD |
$15.00 |
$25.02 |
$20.77 |
| 50 | 882 8384 |
(SP) LITE SMART WORKZONE SYSTEM-PTS | 2,500 | SD |
$5.00 |
$5.13 |
$4.26 |
| 51 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,056 | SD |
$15.00 |
$12.83 |
$10.65 |
| 52 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 55,000 | LF |
$0.2500 |
$0.3100 |
$0.2600 |
| 53 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$75.00 |
$449.06 |
$372.75 |
| 54 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 28 | EA |
$200.00 |
$699.26 |
$580.43 |
| 55 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$23.00 |
$35.92 |
$29.82 |
| 56 | 851(C) 8324 |
2" SQUARE TUBE POST | 13 | LF |
$11.00 |
$10.27 |
$8.52 |
| 57 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,050 | LF |
$2.45 |
$2.57 |
$2.13 |
| 58 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 104,000 | LF |
$1.30 |
$1.90 |
$1.58 |
| 59 | 856(A) 8562 |
RECESSED TRAF STRIPE(MULTI-POLY)(8" W) | 2,850 | LF |
$1.75 |
$3.34 |
$2.77 |
| 60 | 858(A) 8896 |
PAVEMENT MARKERS CLASS A TYPE 1-A | 45 | EA |
$8.40 |
$20.52 |
$17.04 |
| 61 | 509(A) 0319 |
CLASS AA CONCRETE | 38.92 | CY |
$400.00 |
$384.91 |
$319.50 |
| 62 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 2,150 | LF |
$3.50 |
$6.19 |
$5.13 |
| 63 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 2,150 | LF |
$25.00 |
$5.13 |
$4.26 |
| 64 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$2,000.00 |
$5,581.20 |
$4,632.75 |
| 65 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$40,701.06 |
$40,000.00 |
| 66 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$3,207.59 |
$25,000.00 |
| 67 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$12,000.00 |
$19,245.51 |
$20,000.00 |
| 68 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$750,000.00 |
$748,589.53 |
$796,000.00 |