| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$120,000.00 |
$142,352.50 |
$116,243.29 |
$110,722.39 |
$285,000.00 |
$275,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 184,226 | CY |
$8.50 |
$5.35 |
$9.41 |
$6.45 |
$8.25 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,000 | CY |
$10.00 |
$1.05 |
$10.90 |
$0.7500 |
$1.00 |
$4.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$65,000.00 |
$107,802.50 |
$201,614.43 |
$135,437.48 |
$180,000.00 |
$300,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 17,767 | LF |
$1.45 |
$1.15 |
$1.55 |
$3.56 |
$1.03 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,032 | LF |
$7.50 |
$7.30 |
$6.47 |
$8.21 |
$5.99 |
$11.00 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 6 | CY |
$175.00 |
$105.75 |
$106.69 |
$356.68 |
$100.00 |
$200.00 |
| 8 | 221(K) 0600 |
TEMPORARY FIBER LOG | 2,954 | LF |
$2.50 |
$2.45 |
$3.46 |
$5.06 |
$2.95 |
$3.30 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 403,090 | SY |
$1.04 |
$1.05 |
$1.01 |
$1.14 |
$0.9800 |
$1.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 83 | AC |
$250.00 |
$205.00 |
$202.88 |
$228.34 |
$298.00 |
$220.00 |
| 11 | 241 2832 |
MOWING | 166 | AC |
$50.00 |
$50.50 |
$49.96 |
$56.22 |
$60.00 |
$55.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 48,237 | CY |
$45.00 |
$49.90 |
$38.20 |
$43.20 |
$46.50 |
$42.00 |
| 13 | 307(A) 4200 |
FLY ASH | 12,070 | TON |
$50.00 |
$51.50 |
$80.54 |
$65.00 |
$35.00 |
$50.00 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 223,277 | SY |
$2.40 |
$2.15 |
$2.33 |
$1.36 |
$5.00 |
$6.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 244,437 | SY |
$0.9800 |
$0.8000 |
$0.7700 |
$0.8500 |
$1.10 |
$1.00 |
| 16 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 4,340 | SY |
$1.64 |
$1.70 |
$3.76 |
$2.03 |
$1.90 |
$2.30 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 36,402 | TON |
$17.43 |
$25.20 |
$18.32 |
$18.51 |
$20.25 |
$20.00 |
| 18 | 407(B) 0250 |
TACK COAT | 29,406 | GAL |
$2.50 |
$3.30 |
$2.24 |
$3.47 |
$3.00 |
$3.00 |
| 19 | 408 5774 |
PRIME COAT | 140,927 | GAL |
$2.75 |
$3.10 |
$2.70 |
$2.75 |
$1.85 |
$1.50 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 17,698 | TON |
$70.00 |
$56.56 |
$62.93 |
$72.86 |
$67.00 |
$60.00 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 57,254 | TON |
$65.00 |
$50.75 |
$58.81 |
$65.92 |
$63.00 |
$54.00 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,841 | TON |
$80.00 |
$69.25 |
$72.57 |
$77.09 |
$73.00 |
$66.00 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,544 | TON |
$75.00 |
$56.52 |
$67.34 |
$69.34 |
$69.00 |
$60.00 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 373 | SY |
$8.00 |
$41.85 |
$16.73 |
$11.57 |
$40.00 |
$5.00 |
| 25 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 585 | CY |
$25.00 |
$15.45 |
$20.39 |
$14.45 |
$15.00 |
$35.00 |
| 26 | 509(A) 0319 |
CLASS AA CONCRETE | 1,570 | CY |
$365.00 |
$375.25 |
$477.12 |
$562.72 |
$305.00 |
$700.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 428 | CY |
$280.00 |
$363.15 |
$367.03 |
$293.94 |
$205.00 |
$500.00 |
| 28 | 511(A) 0332 |
REINFORCING STEEL | 239,126 | LB |
$0.9500 |
$1.05 |
$0.4500 |
$0.9200 |
$0.8500 |
$1.10 |
| 29 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 3,395 | TON |
$60.00 |
$46.35 |
$46.12 |
$33.18 |
$33.57 |
$50.00 |
| 30 | 613(A) 0400 |
12" R.C.PIPE CLASS III | 10 | LF |
$200.00 |
$63.50 |
$52.80 |
$61.71 |
$61.63 |
$100.00 |
| 31 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 112 | LF |
$60.24 |
$54.25 |
$51.92 |
$67.78 |
$52.68 |
$100.00 |
| 32 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 92 | LF |
$75.00 |
$79.40 |
$65.93 |
$77.73 |
$77.08 |
$105.00 |
| 33 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 304 | LF |
$110.00 |
$122.20 |
$102.61 |
$117.89 |
$118.64 |
$135.00 |
| 34 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 2,578 | LF |
$25.00 |
$16.80 |
$49.07 |
$37.59 |
$16.29 |
$45.00 |
| 35 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 2,882 | LF |
$27.50 |
$28.40 |
$39.95 |
$41.98 |
$27.57 |
$50.00 |
| 36 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 824 | LF |
$30.00 |
$32.75 |
$44.22 |
$46.05 |
$31.80 |
$55.00 |
| 37 | 613(B) 0695 |
54" CORR. GALV. STEEL PIPE | 28 | LF |
$100.00 |
$74.50 |
$117.59 |
$290.01 |
$72.30 |
$110.00 |
| 38 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 114 | LF |
$30.00 |
$36.40 |
$43.61 |
$44.09 |
$35.33 |
$70.00 |
| 39 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 104 | LF |
$40.00 |
$34.60 |
$41.75 |
$41.99 |
$33.57 |
$55.00 |
| 40 | 613(B) 5717 |
15" CORR. GALV. STEEL PIPE | 156 | LF |
$50.00 |
$26.55 |
$37.31 |
$39.88 |
$25.79 |
$50.00 |
| 41 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$12.50 |
$25.75 |
$61.17 |
$16.16 |
$14.00 |
$10.00 |
| 42 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 132 | EA |
$1,000.00 |
$824.00 |
$1,070.49 |
$820.97 |
$1,000.00 |
$1,200.00 |
| 43 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 48 | EA |
$1,100.00 |
$927.00 |
$1,223.42 |
$1,059.62 |
$1,100.00 |
$1,500.00 |
| 44 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,854.00 |
$1,580.26 |
$1,496.06 |
$1,850.00 |
$1,800.00 |
| 45 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$1,750.00 |
$2,060.00 |
$1,682.20 |
$1,671.79 |
$2,000.00 |
$2,000.00 |
| 46 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$120,000.00 |
$28,428.00 |
$111,496.42 |
$48,218.50 |
$27,600.00 |
$130,000.00 |
| 47 | 619(B) 0291 |
REMOVAL OF HEADWALL | 8 | EA |
$1,000.00 |
$824.00 |
$611.71 |
$2,319.95 |
$1,000.00 |
$2,000.00 |
| 48 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 117,000 | SY |
$3.00 |
$2.20 |
$2.28 |
$4.39 |
$4.25 |
$3.00 |
| 49 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 731 | LF |
$3.15 |
$4.10 |
$10.20 |
$4.59 |
$4.00 |
$7.00 |
| 50 | 619(C) 0924 |
SAWING PAVEMENT | 4,285 | LF |
$2.75 |
$4.75 |
$4.08 |
$1.32 |
$5.00 |
$2.00 |
| 51 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$17.14 |
$17.50 |
$17.60 |
$19.51 |
$17.00 |
$18.00 |
| 52 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,121.34 |
$2,318.00 |
$1,293.80 |
$1,434.29 |
$1,250.00 |
$2,500.00 |
| 53 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,500.00 |
$2,010.00 |
$2,225.34 |
$2,466.98 |
$2,150.00 |
$2,500.00 |
| 54 | 624(A) 4281 |
FENCE-STYLE WWF | 2,125 | LF |
$4.50 |
$4.45 |
$4.45 |
$5.45 |
$4.85 |
$4.50 |
| 55 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$1,000.00 |
$772.50 |
$776.28 |
$688.47 |
$350.00 |
$1,000.00 |
| 56 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 15,235 | LF |
$5.00 |
$3.75 |
$3.78 |
$4.02 |
$3.03 |
$4.00 |
| 57 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 4,138 | LF |
$8.00 |
$4.00 |
$3.98 |
$4.30 |
$3.26 |
$4.50 |
| 58 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 210 | LF |
$20.00 |
$23.70 |
$23.81 |
$17.21 |
$25.00 |
$25.00 |
| 59 | 624(E) 4290 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 335 | LF |
$25.00 |
$33.00 |
$33.12 |
$20.66 |
$50.00 |
$35.00 |
| 60 | 624(F) 5851 |
GATES-STYLE CLF (4'HIGH X 16'LONG) | 1 | EA |
$900.00 |
$1,030.00 |
$1,035.05 |
$2,065.39 |
$1,100.00 |
$1,500.00 |
| 61 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 44 | EA |
$100.00 |
$77.25 |
$77.24 |
$86.06 |
$75.00 |
$80.00 |
| 62 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 11 | EA |
$150.00 |
$103.00 |
$102.98 |
$114.74 |
$100.00 |
$110.00 |
| 63 | 629(C) 4960 |
MAILBOX | 67 | EA |
$50.00 |
$25.75 |
$25.75 |
$28.69 |
$25.00 |
$27.00 |
| 64 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 67 | EA |
$40.00 |
$5.15 |
$5.15 |
$5.74 |
$5.00 |
$100.00 |
| 65 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$12.00 |
$15.45 |
$15.53 |
$17.21 |
$15.00 |
$20.00 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$16.96 |
$15.45 |
$87.19 |
$14.45 |
$18.16 |
$100.00 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$139.07 |
$206.00 |
$153.86 |
$145.75 |
$144.47 |
$100.00 |
| 68 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 523.34 | LF |
$233.47 |
$247.20 |
$287.21 |
$210.27 |
$304.14 |
$255.00 |
| 69 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$200.00 |
$195.70 |
$194.89 |
$205.57 |
$175.46 |
$170.00 |
| 70 | 504(B) 1305 |
SAW-CUT GROOVING | 682.3 | SY |
$5.29 |
$4.65 |
$5.13 |
$5.16 |
$4.50 |
$5.00 |
| 71 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 307 | LF |
$91.28 |
$77.25 |
$76.93 |
$88.14 |
$80.08 |
$100.00 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$3.39 |
$2.58 |
$3.08 |
$4.28 |
$3.00 |
$5.00 |
| 73 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$758.28 |
$2,060.00 |
$769.32 |
$409.83 |
$749.97 |
$1,500.00 |
| 74 | 509(A) 1326 |
CLASS AA CONCRETE | 159.2 | CY |
$544.94 |
$669.50 |
$871.89 |
$569.20 |
$709.91 |
$750.00 |
| 75 | 509(B) 1328 |
CLASS A CONCRETE | 60.2 | CY |
$648.85 |
$669.50 |
$1,641.21 |
$709.90 |
$742.54 |
$750.00 |
| 76 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$849.31 |
$824.00 |
$487.24 |
$289.64 |
$747.56 |
$500.00 |
| 77 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 38,130 | LB |
$1.18 |
$1.15 |
$1.33 |
$0.8700 |
$1.00 |
$1.00 |
| 78 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 460 | LF |
$36.21 |
$36.05 |
$56.42 |
$29.21 |
$42.09 |
$30.00 |
| 79 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 460 | LF |
$14.29 |
$18.55 |
$15.39 |
$29.91 |
$8.21 |
$15.00 |
| 80 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 81 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 483 | SY |
$4.19 |
$4.64 |
$4.10 |
$4.36 |
$3.80 |
$6.00 |
| 82 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,200 | TON |
$38.32 |
$46.35 |
$49.24 |
$34.92 |
$66.00 |
$40.00 |
| 83 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 285 | TON |
$33.49 |
$46.35 |
$46.16 |
$25.08 |
$50.78 |
$35.00 |
| 84 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$24.68 |
$72.10 |
$20.52 |
$16.16 |
$27.25 |
$40.00 |
| 85 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.48 |
$72.10 |
$20.52 |
$9.73 |
$27.70 |
$40.00 |
| 86 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$34,809.69 |
$41,200.00 |
$20,515.17 |
$2,830.91 |
$26,000.00 |
$48,821.81 |
| 87 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 119,550 | LF |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1100 |
| 88 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 119,700 | LF |
$0.3700 |
$0.2800 |
$0.2800 |
$0.3100 |
$0.2700 |
$0.3000 |
| 89 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 7,240 | EA |
$0.4500 |
$0.5200 |
$0.5200 |
$0.5700 |
$0.5000 |
$0.5500 |
| 90 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 119,700 | LF |
$0.0800 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0600 |
| 91 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,412 | SD |
$4.97 |
$3.10 |
$3.09 |
$3.44 |
$3.00 |
$3.30 |
| 92 | 871(C) 8709 |
(SP) RELOCATION OF IMPACT ATTENUATOR | 2 | EA |
$1,500.00 |
$1,030.00 |
$1,029.82 |
$1,147.43 |
$1,000.00 |
$1,100.00 |
| 93 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,475 | LF |
$14.90 |
$42.40 |
$25.49 |
$18.20 |
$30.00 |
$10.00 |
| 94 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 350 | LF |
$2.74 |
$10.60 |
$15.29 |
$2.76 |
$10.00 |
$10.00 |
| 95 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 365 | SD |
$8.71 |
$1.05 |
$1.03 |
$1.15 |
$1.00 |
$1.10 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,146 | SD |
$0.3700 |
$1.05 |
$1.03 |
$1.15 |
$1.00 |
$1.05 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 34,094 | SD |
$0.5700 |
$0.2500 |
$0.2100 |
$0.2300 |
$0.2000 |
$0.2000 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,926 | SD |
$1.62 |
$5.15 |
$5.15 |
$5.74 |
$5.00 |
$5.50 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 53,000 | SD |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 100 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$2.12 |
$5.15 |
$5.15 |
$5.74 |
$5.00 |
$5.50 |
| 101 | 880(D) 8854 |
VERTICAL PANELS | 78,000 | SD |
$0.3000 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 115,000 | SD |
$0.1100 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
$0.0300 |
| 103 | 880(F) 8878 |
DRUMS | 81,000 | SD |
$0.1100 |
$0.2500 |
$0.2600 |
$0.2900 |
$0.2500 |
$0.2600 |
| 104 | 880(G) 8890 |
CHANNELIZER CONES | 1,000 | SD |
$0.1000 |
$0.3500 |
$0.3600 |
$0.4000 |
$0.3500 |
$0.3900 |
| 105 | 880(I) 8902 |
FLAGGER | 200 | SD |
$62.87 |
$89.00 |
$152.53 |
$189.32 |
$225.00 |
$150.00 |
| 106 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 2,300 | SD |
$10.07 |
$5.15 |
$5.15 |
$5.74 |
$5.00 |
$5.50 |
| 107 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 39,552 | LF |
$0.2500 |
$0.0900 |
$0.2900 |
$0.1000 |
$0.0900 |
$0.3000 |
| 108 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 79,012 | LF |
$0.1200 |
$0.0900 |
$0.2900 |
$0.1000 |
$0.0900 |
$0.2000 |
| 109 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 250.31 | SF |
$18.50 |
$14.45 |
$14.42 |
$16.07 |
$14.00 |
$15.00 |
| 110 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 399 | LF |
$9.53 |
$8.25 |
$8.24 |
$9.18 |
$8.00 |
$9.00 |
| 111 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 123,998 | LF |
$0.2800 |
$0.3300 |
$0.3300 |
$0.3700 |
$0.3200 |
$0.3300 |
| 112 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 168 | LF |
$3.60 |
$3.10 |
$3.11 |
$3.44 |
$3.00 |
$3.30 |
| 113 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 170 | LF |
$9.92 |
$10.30 |
$10.35 |
$11.48 |
$10.00 |
$11.00 |
| 114 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 4 | EA |
$127.50 |
$206.00 |
$207.01 |
$229.49 |
$200.00 |
$220.00 |
| 115 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$125,000.00 |
$125,000.00 |
$85,347.22 |
$96,384.54 |
$85,000.00 |
$85,000.00 |
| 116 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$25,000.00 |
$36,900.00 |
$3,058.55 |
$2,868.59 |
$5,500.00 |
$15,000.00 |
| 117 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$13,250.00 |
$41,798.69 |
$13,769.22 |
$21,000.00 |
$10,000.00 |
| 118 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$700,000.00 |
$830,000.00 |
$650,000.00 |
$700,969.37 |
$777,550.00 |
$785,000.00 |