| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$36,000.00 |
$10,000.00 |
$12,450.00 |
$21,200.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,466.43 | CY |
$8.50 |
$5.50 |
$11.30 |
$6.35 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,883.03 | CY |
$11.00 |
$7.25 |
$12.97 |
$9.55 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.00 |
$2.00 |
$2.50 |
$1.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 350 | LF |
$7.30 |
$8.50 |
$7.00 |
$8.50 |
| 6 | 221(K) 0600 |
TEMPORARY FIBER LOG | 80 | LF |
$4.10 |
$5.00 |
$4.50 |
$4.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 47,100 | SY |
$1.50 |
$1.25 |
$1.03 |
$1.10 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.73 | AC |
$330.00 |
$50.00 |
$50.00 |
$53.00 |
| 9 | 307(C) 4220 |
PORTLAND CEMENT | 830.75 | TON |
$190.00 |
$128.00 |
$141.00 |
$156.90 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 57,681.88 | SY |
$3.75 |
$2.00 |
$1.90 |
$2.75 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 852.8 | TON |
$58.00 |
$50.00 |
$41.50 |
$42.50 |
| 12 | 407(B) 0250 |
TACK COAT | 2,690.77 | GAL |
$3.85 |
$1.75 |
$2.65 |
$3.35 |
| 13 | 408 5774 |
PRIME COAT | 20,386.41 | GAL |
$3.00 |
$2.00 |
$2.65 |
$3.30 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,000.16 | TON |
$78.00 |
$60.00 |
$63.71 |
$71.35 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,135.29 | TON |
$83.00 |
$65.00 |
$69.00 |
$79.00 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 51,232.7 | SY |
$5.70 |
$1.25 |
$0.9300 |
$2.85 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 110 | CY |
$25.11 |
$20.00 |
$11.27 |
$26.65 |
| 18 | 501(G) 6315 |
CLSM BACKFILL | 110 | CY |
$151.31 |
$150.00 |
$119.86 |
$160.40 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$360.00 |
$400.00 |
$397.20 |
$381.60 |
| 20 | 610(G) 0617 |
ASPHALT DRIVEWAY | 16.4 | TON |
$265.00 |
$75.00 |
$125.00 |
$159.00 |
| 21 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,500.00 |
$2,250.00 |
$1,800.00 |
$2,650.00 |
| 22 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 3 | EA |
$5,200.00 |
$3,220.00 |
$2,850.00 |
$5,512.00 |
| 23 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$125.00 |
$86.06 |
$75.76 |
$111.30 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 120 | LF |
$97.00 |
$96.34 |
$79.77 |
$137.80 |
| 25 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 50 | LF |
$144.00 |
$108.19 |
$95.56 |
$152.65 |
| 26 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 125 | LF |
$188.00 |
$162.50 |
$128.50 |
$185.50 |
| 27 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$42.00 |
$24.10 |
$27.22 |
$26.50 |
| 28 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 170 | LF |
$33.00 |
$28.00 |
$32.50 |
$35.00 |
| 29 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 62 | LF |
$50.00 |
$33.76 |
$44.45 |
$53.00 |
| 30 | 613(EE) 5600 |
(SP) 12" CORRUGATED POLYPROPYLENE PIPE | 87 | LF |
$19.00 |
$25.74 |
$30.24 |
$20.25 |
| 31 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 96 | LF |
$47.00 |
$23.78 |
$37.15 |
$50.00 |
| 32 | 613(EE) 5630 |
(SP) 30" CORRUGATED POLYPROPYLENE PIPE | 57 | LF |
$77.00 |
$32.80 |
$36.11 |
$81.65 |
| 33 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 288 | LF |
$87.00 |
$48.03 |
$62.59 |
$92.25 |
| 34 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$440.00 |
$180.00 |
$184.29 |
$466.50 |
| 35 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,370.00 |
$2,360.00 |
$1,484.00 |
$1,453.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 17 | EA |
$1,410.00 |
$3,070.00 |
$1,571.00 |
$1,495.00 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$2,300.00 |
$3,550.00 |
$1,994.00 |
$2,438.00 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$2,600.00 |
$4,540.00 |
$2,474.00 |
$2,756.00 |
| 39 | 619(B) 0291 |
REMOVAL OF HEADWALL | 15 | EA |
$1,500.00 |
$200.00 |
$650.00 |
$530.00 |
| 40 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 49 | SY |
$6.50 |
$10.00 |
$4.00 |
$7.00 |
| 41 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,194 | LF |
$5.70 |
$5.00 |
$3.00 |
$5.30 |
| 42 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 20 | LF |
$4.50 |
$20.00 |
$6.00 |
$4.75 |
| 43 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 385 | LF |
$8.50 |
$2.50 |
$7.00 |
$9.00 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 150 | LF |
$3.50 |
$7.00 |
$2.00 |
$5.30 |
| 45 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,725 | LF |
$16.68 |
$16.85 |
$15.53 |
$17.85 |
| 46 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,460.00 |
$1,500.00 |
$1,950.00 |
$1,590.00 |
| 47 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 10 | EA |
$2,300.00 |
$2,200.00 |
$2,250.00 |
$2,332.00 |
| 48 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 55.33 | SF |
$37.00 |
$37.00 |
$15.00 |
$39.25 |
| 49 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,396.77 | LF |
$1.25 |
$0.4700 |
$0.8500 |
$0.5000 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$22,000.00 |
$4,000.00 |
$11,000.00 |
$4,240.00 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$35,000.00 |
$30,000.00 |
$33,920.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,500.00 |
$15,000.00 |
$6,000.00 |
$6,890.00 |
| 53 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$157,000.00 |
$125,000.00 |
$114,000.00 |
$137,800.00 |