Bid tab 130395

Let Nov 21, 2013 · Division 8 · Osage Sign up free

‹ Nov 2013 results

GRADE, DRAIN, SURFACE , AND BRIDGE US-60: FROM 2.0 MILES EAST OF SH -99, EXTEND EAST. PROJECT LENGTH = 5.821 MILES

Let date
Thursday, November 21, 2013
Contract
130395
J/P numbers
24287(04)
District
Division 8
County
Osage
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE US-60: FROM 2.0 MILES EAST OF SH -99, EXTEND EAST. PROJECT LENGTH = 5.821 MILES
Project number
NHPPY-257N(020)SS

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$43,721,903
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $36,982,702 -15.4%
2 KOSS CONST. CO. & SUB./BOB BERGKAMP CONST. CO., INC. $40,585,360 -7.2% +9.7%
3 MANHATTAN ROAD & BRIDGE CO. /MJE, LLC $42,657,766 -2.4% +15.3%
4 KOLB GRADING, LLC $44,437,895 +1.6% +20.2%
5 Ebert Construction CO., INC. $48,565,781 +11.1% +31.3%

Bid tab: unit prices 149 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 KOSS CONST. CO.…#3 MANHATTAN ROAD …#4 KOLB GRADING, L…#5 Ebert Construct…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $500,000.00 $500,000.00 $207,000.00 $407,310.00 $300,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,781,033CY $3.95 $3.50 $3.75 $4.76 $4.45 $4.17
3202(C) 0182 ROCK EXCAVATION308,825CY $10.00 $13.00 $5.35 $8.00 $7.50 $10.34
4202(D) 0184 UNCLASSIFIED BORROW348,862CY $5.00 $0.2500 $5.70 $1.10 $1.00 $2.00
5202(L) 6100 (SP) VIBRATING WIRE PIEZOMETERS30EA $1,000.00 $2,466.48 $624.80 $3,000.00 $5,000.00 $683.71
6202(L) 6105 (SP) VIBRATING WIRE TERMINAL BOXES30EA $1,000.00 $102.88 $624.80 $1,600.00 $5,000.00 $815.83
7202(L) 6110 (SP) VIBRATING WIRE READOUT AND DATA COLLECTOR30EA $1,000.00 $985.50 $624.80 $160.00 $3,200.00 $1,586.67
8202(L) 6115 (SP) SUPERVISING AND MAINTAINING INSTRUMENTS1LSUM $50,000.00 $39,872.47 $62,460.00 $23,105.00 $45,000.00 $128,620.00
9202(L) 6120 (SP) SETTLEMENT PLATE56EA $1,000.00 $665.14 $470.00 $1,000.00 $2,500.00 $2,248.66
10205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $634,000.00 $350,000.00 $450,000.00 $206,459.06
11221(C) 2801 TEMPORARY SILT FENCE127,194LF $1.75 $2.16 $1.75 $1.77 $1.75 $1.50
12221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $75.00 $230.57 $55.00 $60.00 $55.00 $495.00
13221(F) 0100 TEMPORARY SILT DIKE1,218LF $8.00 $8.45 $6.85 $7.00 $6.85 $8.95
14221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 2115CY $65.00 $68.38 $100.00 $130.00 $100.00 $85.00
15221(K) 0600 TEMPORARY FIBER LOG12,000LF $1.75 $3.64 $6.00 $3.00 $2.95 $1.55
16229 4318 DITCH LINER PROTECTION25,944LF $1.60 $0.5200 $0.4200 $0.4500 $1.50 $1.50
17230(A) 2806 SOLID SLAB SODDING687,573SY $1.20 $1.35 $1.26 $1.30 $1.75 $1.50
18232(A) 2813 SEEDING METHOD A162.72AC $300.00 $245.66 $199.00 $145.00 $199.00 $550.00
19233(A) 2817 VEGETATIVE MULCHING162.72AC $500.00 $146.90 $119.00 $120.00 $119.00 $550.00
20241 2832 MOWING1,167.82AC $50.00 $48.14 $39.00 $40.00 $39.00 $55.00
21303(A) 2100 AGGREGATE BASE TYPE A53,364CY $36.00 $23.38 $41.00 $37.00 $32.95 $34.40
22307(K) 4300 STABILIZED SUBGRADE200,505SY $4.50 $5.30 $2.10 $5.75 $3.45 $10.97
23325 5271 SEPARATOR FABRIC193,292SY $1.15 $0.9600 $3.00 $1.10 $0.8500 $0.8100
24402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E299,465TON $18.00 $7.45 $10.70 $12.25 $8.75 $22.91
25407(B) 0250 TACK COAT26,329GAL $2.50 $4.40 $2.50 $2.85 $2.71 $2.71
26408 5774 PRIME COAT149,498GAL $4.00 $4.76 $1.56 $7.40 $7.27 $7.27
27411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)58,436TON $65.00 $55.00 $75.50 $67.50 $64.72 $64.72
28411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)19,710TON $75.00 $67.00 $84.00 $86.00 $82.68 $82.68
29501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED906CY $8.00 $12.00 $12.00 $50.00 $50.00 $33.00
30509(A) 0319 CLASS AA CONCRETE2,146CY $300.00 $439.12 $365.00 $350.00 $320.00 $352.00
31509(D) 0325 CLASS C CONCRETE4,917CY $275.00 $281.05 $205.00 $200.00 $350.00 $390.00
32511(A) 0332 REINFORCING STEEL325,122LB $0.9000 $0.8200 $0.8500 $0.8500 $0.9000 $0.8000
33601(A) 0297 TYPE I PLAIN RIPRAP4,655TON $25.00 $30.96 $18.00 $30.40 $30.00 $32.69
34611(G) 6002 INLET (SMD-TYPE 2)2EA $4,500.00 $1,632.73 $3,000.00 $4,620.00 $500.00 $2,686.48
35611(H) 5196 ADDITIONAL DEPTH IN INLET11VF $300.00 $13.74 $200.00 $840.00 $450.00 $295.16
36613(A) 0492 24" R.C.PIPE CLASS III1,397LF $60.00 $70.42 $71.00 $60.00 $70.00 $54.52
37613(A) 0494 36" R.C.PIPE CLASS III147LF $80.00 $125.55 $72.00 $100.00 $135.00 $85.30
38613(A) 0496 48" R.C.PIPE CLASS III240LF $110.00 $172.08 $118.00 $135.00 $167.00 $112.87
39613(A) 0583 24" R.C.PIPE CLASS IV592LF $60.00 $69.84 $73.00 $55.00 $90.00 $58.01
40613(A) 0585 36" R.C.PIPE CLASS IV338LF $100.00 $171.86 $99.00 $106.00 $142.00 $92.28
41613(A) 0597 36" R.C.PIPE CLASS V338LF $275.00 $171.81 $104.00 $115.00 $150.00 $99.46
42613(B) 0689 18" CORR. GALV. STEEL PIPE1,681LF $30.00 $48.31 $46.00 $44.00 $68.00 $35.43
43613(B) 0690 24" CORR. GALV. STEEL PIPE452LF $45.00 $63.40 $51.00 $55.00 $88.00 $38.95
44613(B) 0694 48" CORR. GALV. STEEL PIPE44LF $80.00 $152.25 $67.00 $130.00 $120.00 $100.54
45613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND36EA $900.00 $449.14 $800.00 $815.00 $900.00 $663.54
46613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND10EA $1,250.00 $751.06 $1,200.00 $1,325.00 $1,500.00 $1,074.72
47613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND4EA $2,000.00 $1,152.59 $1,600.00 $2,050.00 $2,000.00 $1,587.59
48613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B657CY $20.00 $9.87 $20.00 $38.55 $64.00 $25.29
49613(V) 1180 TRENCH EXCAVATION1,438CY $6.00 $2.47 $5.00 $12.45 $50.00 $18.11
50619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $150,000.00 $22,019.36 $112,000.00 $13,200.00 $75,000.00 $86,225.42
51619(B) 4728 REMOVAL OF ASPHALT PAVEMENT68,262SY $2.00 $1.90 $4.00 $3.75 $3.61 $3.61
52619(B) 4780 REMOVAL OF GUARDRAIL634LF $3.00 $7.41 $10.00 $3.50 $10.00 $4.00
53619(C) 0924 SAWING PAVEMENT1,771LF $2.50 $3.98 $3.00 $4.00 $7.00 $6.75
54619(F) 8710 PLUG OIL WELL11EA $10,000.00 $3,086.10 $11,000.00 $20,000.00 $15,000.00 $52,500.00
55623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,650LF $16.00 $23.76 $15.00 $20.00 $19.25 $15.00
56623(G) 8571 GUARDRAIL END TREATMENT (GET)8EA $2,100.00 $2,345.43 $2,030.00 $2,350.00 $1,900.00 $2,030.00
57623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A8EA $1,500.00 $1,234.44 $1,215.00 $1,675.00 $1,900.00 $1,215.00
58624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)40,761LF $4.00 $4.94 $3.85 $4.75 $3.85 $3.85
59853 9033 DELINEATORS(TYPE 2, CODE 1)48EA $11.00 $24.68 $20.00 $17.50 $20.00 $20.00
60202(A) 1301 UNCLASSIFIED EXCAVATION3,300CY $6.00 $6.17 $20.00 $6.50 $15.00 $7.00
61501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED588CY $15.00 $13.58 $12.00 $50.00 $35.00 $18.00
62509(A) 1326 CLASS AA CONCRETE1,446.6CY $500.00 $396.02 $365.00 $325.00 $307.35 $357.00
63511(A) 1332 REINFORCING STEEL154,520LB $0.9000 $0.7900 $0.8500 $0.8000 $0.9000 $0.8000
64513(B) 6019 CLASS B BRIDGE DECK REPAIR30SY $350.00 $185.16 $325.00 $750.00 $700.00 $469.00
65513(C) 6020 CLASS C BRIDGE DECK REPAIR30SY $400.00 $246.89 $360.00 $900.00 $700.00 $473.00
66619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $13,400.28 $25,000.00 $9,000.00 $25,000.00 $23,000.00
67501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON190CY $15.00 $18.10 $14.80 $50.00 $12.87 $12.87
68501(G) 6309 CLSM BACKFILL225CY $150.00 $136.09 $146.90 $130.00 $128.50 $128.50
69503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,693.33LF $225.00 $199.27 $245.20 $190.00 $214.50 $214.50
70504(A) 1304 APPROACH SLAB281.2SY $175.00 $156.04 $164.60 $160.00 $144.00 $144.00
71504(B) 1305 SAW-CUT GROOVING1,690SY $5.00 $5.00 $4.70 $4.00 $4.05 $4.05
72504(C) 6250 SEALED EXPANSION JOINT43.17LF $275.00 $245.24 $315.50 $255.00 $276.00 $276.00
73504(D) 6245 CONCRETE RAIL (TR4)803.4LF $75.00 $59.34 $59.50 $60.00 $52.00 $52.00
74506(A) 1322 STRUCTURAL STEEL2,470LB $5.00 $3.48 $2.20 $3.00 $1.86 $1.86
75507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,500.00 $2,002.66 $950.00 $2,000.00 $831.21 $831.21
76507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY30EA $2,500.00 $2,002.66 $2,039.00 $2,000.00 $1,784.04 $1,784.04
77509(A) 1326 CLASS AA CONCRETE407.3CY $500.00 $554.20 $493.80 $400.00 $432.00 $432.00
78509(B) 1328 CLASS A CONCRETE272.3CY $450.00 $546.70 $432.00 $500.00 $378.00 $378.00
79509(D) 1331 CLASS C CONCRETE10CY $400.00 $367.87 $525.80 $700.00 $460.00 $460.00
80511(A) 1332 REINFORCING STEEL2,200LB $0.9000 $0.9500 $1.10 $2.00 $0.9000 $0.9000
81511(B) 6010 EPOXY COATED REINFORCING STEEL139,900LB $1.10 $1.01 $1.10 $1.15 $0.9000 $0.9000
82513(B) 6019 CLASS B BRIDGE DECK REPAIR30SY $350.00 $185.16 $371.50 $750.00 $325.00 $325.00
83513(C) 6020 CLASS C BRIDGE DECK REPAIR30SY $400.00 $246.89 $411.50 $900.00 $360.00 $360.00
84514(A) 6010 PILES, FURNISHED (HP 10X42)206LF $30.00 $26.74 $31.70 $40.00 $27.66 $27.66
85514(A) 6011 PILES, FURNISHED (HP 12X53)820LF $35.00 $33.78 $40.80 $45.00 $35.67 $35.67
86514(B) 6292 PILES, DRIVEN (HP 10X42)206LF $15.00 $27.87 $7.90 $15.00 $6.85 $6.85
87514(B) 6294 PILES, DRIVEN (HP 12X53)820LF $15.00 $28.43 $8.30 $15.00 $7.25 $7.25
88515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,531SY $4.00 $4.50 $4.20 $4.00 $3.65 $3.65
89516(A) 6096 DRILLED SHAFTS 60" DIAMETER178LF $700.00 $809.24 $1,011.90 $1,250.00 $885.33 $885.33
90516(C) 6200 CROSSHOLE SONIC LOGGING6EA $1,500.00 $1,895.24 $1,111.50 $2,000.00 $972.50 $972.50
91523(A) 6550 SEALER CRACK PREPARATION84.33LF $5.00 $4.94 $4.60 $5.00 $4.00 $4.00
92523(B) 6560 SEALER RESIN0.84GAL $150.00 $123.44 $114.30 $150.00 $100.00 $100.00
93601(B) 1353 TYPE I-A PLAIN RIPRAP3,560TON $35.00 $37.59 $37.60 $28.00 $32.85 $32.85
94601(C) 1355 TYPE I-A FILTER BLANKET580TON $35.00 $25.22 $33.00 $25.00 $28.85 $28.85
95613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND85LF $25.00 $22.58 $27.50 $17.00 $24.00 $24.00
96613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $25.00 $14.92 $32.00 $17.00 $28.00 $28.00
97619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $30,000.00 $17,882.92 $23,867.50 $10,000.00 $95,000.00 $20,884.00
98501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON200CY $15.00 $18.10 $14.80 $50.00 $12.87 $12.87
99501(G) 6309 CLSM BACKFILL280CY $150.00 $136.09 $157.80 $130.00 $138.00 $138.00
100503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)3,116.67LF $275.00 $251.01 $324.80 $245.00 $284.20 $284.20
101504(A) 1304 APPROACH SLAB281.6SY $175.00 $155.97 $164.60 $160.00 $144.00 $144.00
102504(B) 1305 SAW-CUT GROOVING2,752.6SY $5.00 $5.00 $4.70 $4.00 $4.05 $4.05
103504(C) 6250 SEALED EXPANSION JOINT85LF $275.00 $232.56 $315.50 $255.00 $276.00 $276.00
104504(D) 6245 CONCRETE RAIL (TR4)1,373.4LF $75.00 $59.34 $62.30 $60.00 $54.50 $54.50
105506(A) 1322 STRUCTURAL STEEL6,240LB $5.00 $3.48 $2.20 $3.00 $1.86 $1.86
106507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY15EA $2,500.00 $2,421.58 $950.00 $2,100.00 $831.21 $831.21
107507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY35EA $2,500.00 $2,421.58 $2,039.00 $2,100.00 $1,784.04 $1,784.04
108509(A) 1326 CLASS AA CONCRETE852.2CY $500.00 $553.57 $440.00 $400.00 $385.00 $385.00
109509(B) 1328 CLASS A CONCRETE474.5CY $450.00 $604.42 $428.60 $500.00 $375.00 $375.00
110509(D) 1331 CLASS C CONCRETE8.2CY $400.00 $367.87 $525.80 $700.00 $460.00 $460.00
111511(A) 1332 REINFORCING STEEL4,430LB $0.9000 $0.9500 $1.10 $2.00 $0.9000 $0.9000
112511(B) 6010 EPOXY COATED REINFORCING STEEL299,870LB $1.10 $1.01 $1.10 $1.00 $0.9000 $0.9000
113514(A) 6010 PILES, FURNISHED (HP 10X42)142LF $30.00 $27.66 $33.50 $40.00 $29.30 $29.30
114514(A) 6011 PILES, FURNISHED (HP 12X53)644LF $35.00 $35.21 $43.10 $45.00 $37.64 $37.64
115514(B) 6292 PILES, DRIVEN (HP 10X42)142LF $15.00 $29.79 $9.40 $15.00 $8.15 $8.15
116514(B) 6294 PILES, DRIVEN (HP 12X53)644LF $15.00 $31.11 $9.90 $15.00 $8.58 $8.58
117515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)3,023SY $4.00 $4.50 $4.20 $4.00 $3.65 $3.65
118516(A) 6098 DRILLED SHAFTS 72" DIAMETER198LF $900.00 $1,075.94 $1,347.50 $1,325.00 $1,179.06 $1,179.06
119516(C) 6200 CROSSHOLE SONIC LOGGING8EA $1,500.00 $1,832.55 $1,111.50 $2,000.00 $972.50 $972.50
120523(A) 6550 SEALER CRACK PREPARATION81.6LF $5.00 $4.94 $4.60 $5.00 $4.00 $4.00
121523(B) 6560 SEALER RESIN1.5GAL $150.00 $123.44 $114.30 $150.00 $100.00 $100.00
122601(B) 1353 TYPE I-A PLAIN RIPRAP6,080TON $35.00 $37.59 $38.00 $28.00 $33.19 $33.19
123601(C) 1355 TYPE I-A FILTER BLANKET1,320TON $35.00 $25.22 $33.60 $25.00 $29.34 $29.34
124613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $25.00 $22.58 $27.50 $17.00 $24.00 $24.00
125613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $25.00 $14.92 $32.00 $17.00 $28.00 $28.00
126619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $11,574.78 $10,000.00 $7,000.00 $110,000.00 $50,000.00
127857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)36,000LF $0.1200 $0.1900 $0.1500 $0.1600 $0.1500 $0.1500
128857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-15,000EA $0.7700 $0.6800 $0.5000 $0.5200 $0.5000 $0.5000
129857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)5,000LF $0.1700 $0.6800 $0.5000 $0.5200 $0.5000 $0.5000
130877(A) 8483 PORTABLE LONGITUDINAL BARRIER475LF $33.41 $46.55 $48.25 $36.00 $48.25 $48.25
131880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF13,080SD $0.2200 $0.1900 $0.2500 $0.2600 $0.2500 $0.2500
132880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF65,400SD $0.8000 $0.3700 $0.1000 $0.1100 $0.1000 $0.1000
133880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF40,330SD $1.22 $0.6200 $1.00 $1.04 $1.00 $1.00
134880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)91,560SD $0.4100 $0.1900 $0.3500 $0.3600 $0.3500 $0.3500
135880(C) 8848 WING BARRICADES4,360SD $1.04 $2.47 $1.00 $1.03 $1.00 $1.00
136880(D) 8854 VERTICAL PANELS245,250SD $0.1000 $0.0600 $0.0300 $0.0400 $0.0500 $0.0500
137880(E) 8860 WARNING LIGHTS(TYPE A)210,370SD $0.1500 $0.0600 $0.0300 $0.0400 $0.0500 $0.0500
138880(F) 8878 DRUMS190,750SD $0.1100 $0.0600 $0.0500 $0.0400 $0.0500 $0.0500
139880(G) 8890 CHANNELIZER CONES81,750SD $0.1700 $0.1500 $0.1000 $0.1100 $0.1000 $0.1000
140882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN2,208SD $15.10 $14.81 $10.00 $10.25 $13.75 $10.00
141805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $500.00 $617.22 $1,000.00 $1,050.00 $1,000.00 $1,000.00
142805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $100.00 $308.61 $500.00 $520.00 $500.00 $500.00
143850(A) 8110 SHEET ALUMINUM SIGNS296.76SF $15.96 $12.34 $14.00 $14.50 $14.00 $14.00
144851(C) 8324 2" SQUARE TUBE POST481LF $6.72 $9.87 $7.00 $7.25 $7.00 $7.00
145856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)121,000LF $0.4100 $0.5600 $0.3500 $0.3600 $0.3500 $0.3500
146642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $300,000.00 $150,000.00 $275,000.00 $165,000.00 $250,000.00 $214,400.00
147220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $20,000.00 $5,000.00 $7,500.00 $5,000.00 $150,000.00 $39,150.00
148640(A) 1426 FIELD OFFICE1EA $10,000.00 $14,813.31 $58,000.00 $50,000.00 $50,000.00 $15,224.79
149641 1552 MOBILIZATION1LSUM $1,500,000.00