Bid tab 200281

Let Sep 17, 2020 · Division 5 · Kiowa Sign up free

‹ Sep 2020 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER UNNAMED CREEK, 1.8 MILES NORTH OF THE SH-9 JUNCTION NEAR GOTEBO. PROJECT LENGTH = 0.114 MILE

Let date
Thursday, September 17, 2020
Contract
200281
J/P numbers
30689(04)
District
Division 5
County
Kiowa
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER UNNAMED CREEK, 1.8 MILES NORTH OF THE SH-9 JUNCTION NEAR GOTEBO. PROJECT LENGTH = 0.114 MILE
Project number
STP-238D(073)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$556,330
1 SEWELL BROS., INC. Low bidder $487,898 -12.3%
2 BRIDGECO CONTRACTORS, INC. $499,263 -10.3% +2.3%
3 K & R BUILDERS, INC. $510,602 -8.2% +4.7%
4 HASKELL LEMON CONSTRUCTION CO. $519,544 -6.6% +6.5%
5 RRY SERVICES LLC $595,515 +7.0% +22.1%
6 Built Right Construction, LLC $658,460 +18.4% +35.0%

Bid tab: unit prices 39 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 BRIDGECO CONTRA…#3 K & R BUILDERS,…#4 HASKELL LEMON C…#5 RRY SERVICES LLC#6 Built Right Con…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $7,000.00 $11,500.00 $8,500.00 $11,715.00 $25,000.00 $10,000.00
20202(H) 0185 EARTHWORK1LSUM $30,000.00 $27,000.00 $29,911.20 $27,500.00 $36,340.00 $32,000.00 $10,000.00
30221(C) 2801 TEMPORARY SILT FENCE200LF $2.75 $3.80 $4.98 $3.75 $4.15 $4.00 $4.00
40221(F) 0100 TEMPORARY SILT DIKE350LF $10.00 $14.00 $8.18 $9.90 $6.50 $13.00 $15.00
50230(A) 2806 SOLID SLAB SODDING7,800SY $3.50 $3.25 $3.53 $3.41 $3.10 $3.00 $5.00
60233(A) 2817 VEGETATIVE MULCHING1.62AC $1,000.00 $900.00 $875.00 $500.00 $833.00 $925.00 $1,500.00
70311(A) 0151 PROCESSING EXISTING BASE & SURFACE, METHOD A512LF $7.50 $10.00 $30.00 $18.75 $21.30 $15.00 $30.00
80402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E449TON $40.00 $28.00 $25.31 $26.75 $23.40 $30.00 $45.00
90509(D) 0325 CLASS C CONCRETE10CY $350.00 $350.00 $275.00 $300.00 $486.00 $275.00 $500.00
100501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON199CY $16.00 $15.00 $10.00 $8.25 $15.20 $15.00 $20.00
110501(F) 6352 GRANULAR BACKFILL94CY $65.00 $65.00 $70.00 $62.00 $77.00 $75.00 $85.00
120503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)339LF $230.00 $220.00 $225.23 $227.00 $212.00 $285.00 $230.00
130504(D) 6239 CONCRETE RAIL (TR3)236.4LF $80.00 $80.00 $82.00 $80.00 $99.20 $95.00 $150.00
140506(A) 1322 STRUCTURAL STEEL350LB $3.75 $4.00 $4.06 $2.85 $5.60 $3.00 $13.00
150507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY4EA $1,000.00 $800.00 $883.00 $1,010.00 $1,353.00 $1,250.00 $1,800.00
160507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY4EA $1,000.00 $800.00 $883.00 $1,010.00 $1,353.00 $1,250.00 $1,800.00
170509(A) 1326 CLASS AA CONCRETE75.6CY $660.00 $700.00 $650.00 $695.00 $566.50 $740.00 $650.00
180509(B) 1328 CLASS A CONCRETE73.6CY $675.00 $700.00 $650.00 $712.50 $543.00 $725.00 $650.00
190511(A) 1332 REINFORCING STEEL27,790LB $1.05 $0.9500 $1.07 $1.00 $1.15 $1.15 $1.50
200514(A) 6010 PILES, FURNISHED (HP 10X42)152LF $35.00 $30.00 $23.60 $28.00 $38.50 $40.00 $45.00
210514(A) 6011 PILES, FURNISHED (HP 12X53)490LF $40.00 $35.00 $27.45 $31.50 $38.80 $45.00 $45.00
220514(B) 6292 PILES, DRIVEN (HP 10X42)152LF $15.00 $15.00 $12.00 $12.00 $27.20 $10.00 $35.00
230514(B) 6294 PILES, DRIVEN (HP 12X53)490LF $15.00 $15.00 $10.00 $13.50 $16.80 $10.00 $35.00
240514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
250601(B) 1353 TYPE I-A PLAIN RIPRAP1,412TON $50.00 $41.00 $38.35 $40.75 $43.20 $45.00 $65.00
260601(C) 1355 TYPE I-A FILTER BLANKET411TON $40.00 $30.00 $36.00 $29.75 $31.50 $40.00 $45.00
270613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND56LF $35.00 $35.00 $30.00 $29.00 $48.60 $35.00 $30.00
280613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.24LF $30.00 $35.00 $30.00 $49.00 $46.00 $35.00 $50.00
290619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $5,000.00 $12,000.00 $7,000.00 $11,050.00 $10,000.00 $10,000.00
300623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE87.5LF $25.00 $33.00 $31.00 $33.00 $31.40 $30.00 $35.00
310623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)2EA $2,200.00 $2,300.00 $1,860.00 $1,980.00 $1,886.00 $1,800.00 $2,500.00
320623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)2EA $2,800.00 $2,600.00 $2,140.00 $2,282.50 $2,175.00 $2,075.00 $2,500.00
330880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF180SD $0.3500 $2.10 $2.10 $2.20 $2.10 $2.15 $2.00
340880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF540SD $0.9500 $0.1200 $0.1200 $0.1100 $0.1000 $0.1500 $0.1000
350880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)900SD $0.5000 $1.05 $1.05 $1.10 $1.05 $1.10 $1.00
360880(E) 8860 WARNING LIGHTS(TYPE A)2,160SD $0.2000 $0.0800 $0.0700 $0.0600 $0.0500 $0.0500 $0.0500
370642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $7,500.00 $4,500.00 $5,400.00 $4,200.00 $5,281.00 $4,000.00 $6,000.00
380220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,000.00 $3,000.00 $1,900.00 $2,293.00 $1,275.00 $2,000.00
390641 1399 MOBILIZATION1LSUM $53,000.00 $27,500.00 $27,900.00 $46,000.00 $37,086.21 $58,000.00 $70,000.00