| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,000 | CY |
$18.00 |
$15.00 |
$2.10 |
$8.00 |
$25.30 |
$10.00 |
$17.50 |
$6.22 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$20.00 |
$15.00 |
$2.10 |
$10.00 |
$32.21 |
$15.00 |
$20.50 |
$10.57 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$56,700.00 |
$18,500.00 |
$12,201.91 |
$11,500.00 |
$7,200.00 |
$4,147.63 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,912 | LF |
$3.00 |
$1.70 |
$3.05 |
$1.20 |
$2.53 |
$3.48 |
$1.65 |
$1.61 |
| 50 | 221(F) 0100 |
TEMPORARY SILT DIKE | 160 | LF |
$17.00 |
$10.50 |
$11.34 |
$8.00 |
$18.85 |
$19.48 |
$10.10 |
$9.83 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 2,260 | SY |
$6.00 |
$2.00 |
$4.17 |
$1.98 |
$4.06 |
$5.25 |
$1.76 |
$1.71 |
| 70 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.24 | AC |
$2,000.00 |
$165.00 |
$10,937.50 |
$180.00 |
$4,067.30 |
$4,200.00 |
$159.75 |
$155.54 |
| 80 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 520 | TON |
$145.00 |
$133.00 |
$136.50 |
$149.50 |
$116.44 |
$171.50 |
$138.45 |
$175.57 |
| 90 | 412 5267 |
COLD MILLING PAVEMENT | 4,614 | SY |
$7.00 |
$5.50 |
$7.35 |
$7.50 |
$5.22 |
$8.80 |
$4.26 |
$5.32 |
| 100 | 509(D) 0325 |
CLASS C CONCRETE | 53 | CY |
$600.00 |
$400.00 |
$597.12 |
$600.00 |
$609.11 |
$450.00 |
$1,250.00 |
$409.57 |
| 110 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$6,300.00 |
$6,750.00 |
$17,366.86 |
$8,000.00 |
$11,000.00 |
$4,256.19 |
| 120 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,898 | LF |
$4.50 |
$5.00 |
$6.30 |
$3.99 |
$3.11 |
$3.50 |
$3.00 |
$4.67 |
| 130 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,175 | LF |
$25.00 |
$20.00 |
$18.90 |
$19.80 |
$16.83 |
$19.08 |
$19.17 |
$18.66 |
| 140 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$3,000.00 |
$2,585.00 |
$2,467.50 |
$2,585.00 |
$2,498.72 |
$2,500.00 |
$2,502.75 |
$2,436.74 |
| 150 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$3,000.00 |
$1,790.00 |
$1,706.25 |
$1,787.50 |
$2,345.74 |
$1,750.00 |
$1,730.63 |
$1,684.98 |
| 160 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 52 | EA |
$15.00 |
$16.00 |
$15.23 |
$15.95 |
$13.51 |
$15.50 |
$15.44 |
$15.04 |
| 170 | 501(G) 6309 |
CLSM BACKFILL | 124 | CY |
$250.00 |
$200.00 |
$179.97 |
$185.00 |
$209.46 |
$205.00 |
$200.00 |
$20.73 |
| 180 | 504(A) 1304 |
APPROACH SLAB | 220 | SY |
$300.00 |
$250.00 |
$221.76 |
$235.00 |
$230.65 |
$247.90 |
$275.00 |
$314.53 |
| 190 | 504(B) 1305 |
SAW-CUT GROOVING | 1,072 | SY |
$5.00 |
$4.65 |
$4.41 |
$4.62 |
$4.28 |
$4.75 |
$4.47 |
$5.59 |
| 200 | 504(C) 6250 |
SEALED EXPANSION JOINT | 65 | LF |
$350.00 |
$290.00 |
$253.71 |
$305.00 |
$250.04 |
$296.69 |
$320.00 |
$349.21 |
| 210 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 643 | LF |
$110.00 |
$100.00 |
$80.21 |
$91.50 |
$97.75 |
$91.00 |
$110.00 |
$112.41 |
| 220 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 540 | LF |
$30.00 |
$35.00 |
$21.00 |
$32.00 |
$9.47 |
$35.00 |
$26.63 |
$56.44 |
| 230 | 506(A) 1322 |
STRUCTURAL STEEL | 5,700 | LB |
$6.00 |
$6.85 |
$6.25 |
$6.60 |
$6.37 |
$5.50 |
$6.66 |
$7.76 |
| 240 | 509 5000 |
ELASTOMERIC COATING | 530 | SF |
$15.00 |
$17.00 |
$15.54 |
$16.28 |
$15.85 |
$13.64 |
$15.55 |
$34.58 |
| 250 | 509(A) 1326 |
CLASS AA CONCRETE | 217 | CY |
$1,000.00 |
$800.00 |
$855.99 |
$860.00 |
$749.49 |
$800.00 |
$950.00 |
$928.44 |
| 260 | 510(C) 6138 |
SLOPE WALL (5") | 69 | SY |
$500.00 |
$365.00 |
$121.17 |
$299.00 |
$360.96 |
$246.38 |
$300.00 |
$245.48 |
| 270 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 72,815 | LB |
$1.20 |
$1.25 |
$1.09 |
$1.16 |
$0.9900 |
$1.24 |
$1.51 |
$1.23 |
| 280 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$25,746.00 |
$26,972.00 |
$29,140.67 |
$29,000.00 |
$13,283.75 |
$34,131.29 |
| 290 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,890.00 |
$2,625.00 |
$2,750.00 |
$4,118.55 |
$6,500.00 |
$1,051.16 |
$6,023.18 |
| 300 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 542 | SY |
$5.00 |
$3.50 |
$4.20 |
$4.40 |
$4.08 |
$5.25 |
$4.26 |
$4.15 |
| 310 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$40.00 |
$36.75 |
$38.50 |
$37.48 |
$35.00 |
$39.14 |
$49.77 |
| 320 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$57.00 |
$52.50 |
$55.00 |
$53.54 |
$200.00 |
$55.92 |
$129.62 |
| 330 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 4 | SY |
$900.00 |
$935.00 |
$850.50 |
$891.00 |
$867.41 |
$1,150.00 |
$905.78 |
$739.11 |
| 340 | 523(A) 6550 |
SEALER CRACK PREPARATION | 129 | LF |
$5.00 |
$5.00 |
$4.20 |
$4.40 |
$4.08 |
$5.25 |
$4.26 |
$4.15 |
| 350 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$150.00 |
$157.50 |
$165.00 |
$152.98 |
$200.00 |
$159.75 |
$155.54 |
| 360 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 8 | SY |
$50.00 |
$55.00 |
$50.40 |
$53.00 |
$51.40 |
$188.00 |
$53.68 |
$75.71 |
| 370 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,005 | TON |
$55.00 |
$47.00 |
$43.86 |
$48.00 |
$48.90 |
$48.00 |
$50.00 |
$34.71 |
| 380 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 255 | TON |
$45.00 |
$37.00 |
$31.00 |
$37.00 |
$38.15 |
$40.00 |
$40.00 |
$27.43 |
| 390 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$75,000.00 |
$110,250.00 |
$89,333.00 |
$72,254.54 |
$135,000.00 |
$160,000.00 |
$186,208.17 |
| 400 | 501(G) 6309 |
CLSM BACKFILL | 120 | CY |
$250.00 |
$200.00 |
$179.97 |
$185.00 |
$212.04 |
$205.00 |
$225.00 |
$200.73 |
| 410 | 504(A) 1304 |
APPROACH SLAB | 231 | SY |
$300.00 |
$250.00 |
$221.47 |
$235.00 |
$284.39 |
$239.50 |
$275.00 |
$320.48 |
| 420 | 504(B) 1305 |
SAW-CUT GROOVING | 1,289 | SY |
$5.00 |
$4.65 |
$4.41 |
$4.62 |
$4.28 |
$4.75 |
$4.47 |
$5.59 |
| 430 | 504(C) 6250 |
SEALED EXPANSION JOINT | 73 | LF |
$350.00 |
$290.00 |
$253.71 |
$305.00 |
$271.06 |
$294.52 |
$320.00 |
$349.30 |
| 440 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 774 | LF |
$110.00 |
$100.00 |
$80.21 |
$91.50 |
$95.79 |
$87.00 |
$110.00 |
$112.82 |
| 450 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 700 | LF |
$30.00 |
$35.00 |
$26.25 |
$32.00 |
$9.61 |
$32.00 |
$26.63 |
$56.44 |
| 460 | 506(A) 1322 |
STRUCTURAL STEEL | 6,185 | LB |
$6.00 |
$4.00 |
$7.30 |
$6.60 |
$6.37 |
$5.50 |
$6.66 |
$7.76 |
| 470 | 509 5000 |
ELASTOMERIC COATING | 630 | SF |
$15.00 |
$17.00 |
$15.54 |
$16.28 |
$15.85 |
$1.00 |
$15.55 |
$29.26 |
| 480 | 509(A) 1326 |
CLASS AA CONCRETE | 268 | CY |
$900.00 |
$800.00 |
$812.55 |
$800.00 |
$705.63 |
$815.00 |
$850.00 |
$836.00 |
| 490 | 510(C) 6138 |
SLOPE WALL (5") | 72 | SY |
$500.00 |
$365.00 |
$121.17 |
$299.00 |
$363.03 |
$178.60 |
$300.00 |
$459.69 |
| 500 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 89,140 | LB |
$1.20 |
$1.25 |
$1.09 |
$1.16 |
$0.9900 |
$1.24 |
$1.51 |
$1.23 |
| 510 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,000.00 |
$41,000.00 |
$31,143.00 |
$33,000.00 |
$34,644.99 |
$35,500.00 |
$16,594.83 |
$34,131.29 |
| 520 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,890.00 |
$2,625.00 |
$2,750.00 |
$4,118.55 |
$7,500.00 |
$1,193.87 |
$4,695.64 |
| 530 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 664 | SY |
$5.00 |
$3.50 |
$4.20 |
$4.40 |
$4.08 |
$5.25 |
$4.26 |
$4.15 |
| 540 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 20 | LF |
$50.00 |
$40.00 |
$36.75 |
$38.50 |
$37.48 |
$6.50 |
$39.14 |
$49.77 |
| 550 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$150.00 |
$57.00 |
$52.50 |
$55.00 |
$53.54 |
$200.00 |
$55.92 |
$129.62 |
| 560 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 8 | SY |
$900.00 |
$935.00 |
$850.50 |
$891.00 |
$867.41 |
$1,050.00 |
$905.78 |
$739.11 |
| 570 | 523(A) 6550 |
SEALER CRACK PREPARATION | 144 | LF |
$5.00 |
$5.00 |
$4.20 |
$4.40 |
$4.08 |
$5.00 |
$4.26 |
$4.15 |
| 580 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$150.00 |
$157.50 |
$165.00 |
$152.98 |
$200.00 |
$159.75 |
$155.54 |
| 590 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 13 | SY |
$50.00 |
$55.00 |
$50.40 |
$53.00 |
$51.40 |
$188.00 |
$53.68 |
$25.92 |
| 600 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,315 | TON |
$55.00 |
$47.00 |
$43.86 |
$48.00 |
$48.71 |
$46.00 |
$50.00 |
$40.93 |
| 610 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 330 | TON |
$45.00 |
$37.00 |
$31.00 |
$37.00 |
$40.05 |
$41.00 |
$40.00 |
$32.61 |
| 620 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$100,000.00 |
$105,000.00 |
$107,667.00 |
$88,537.01 |
$157,500.00 |
$170,000.00 |
$214,565.01 |
| 630 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 27,360 | SD |
$0.5000 |
$0.1000 |
$0.0900 |
$0.0900 |
$0.0500 |
$0.0900 |
$0.0900 |
$0.0800 |
| 640 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$1.50 |
$3.05 |
$3.15 |
$3.60 |
$0.8200 |
$3.21 |
$3.20 |
$3.11 |
| 650 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,240 | SD |
$3.00 |
$2.05 |
$2.10 |
$2.20 |
$0.9200 |
$2.14 |
$2.13 |
$2.07 |
| 660 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,080 | SD |
$6.00 |
$2.05 |
$2.10 |
$2.20 |
$0.9200 |
$2.14 |
$2.13 |
$2.07 |
| 670 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,320 | SD |
$1.50 |
$0.3000 |
$0.2600 |
$0.2500 |
$1.22 |
$0.2700 |
$0.2700 |
$0.2600 |
| 680 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 8,640 | SD |
$0.5000 |
$0.3000 |
$0.2600 |
$0.3000 |
$0.5600 |
$0.2700 |
$0.2700 |
$0.2600 |
| 690 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 776 | SD |
$20.00 |
$6.00 |
$5.78 |
$6.00 |
$15.30 |
$5.89 |
$5.86 |
$5.70 |
| 700 | 805(A) 8720 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$1,000.00 |
$55.00 |
$52.50 |
$55.00 |
$407.95 |
$100.00 |
$53.25 |
$51.85 |
| 710 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 24 | SF |
$40.00 |
$27.00 |
$26.25 |
$27.50 |
$39.78 |
$27.00 |
$26.63 |
$25.92 |
| 720 | 851(C) 8324 |
2" SQUARE TUBE POST | 20 | LF |
$12.00 |
$14.00 |
$12.60 |
$13.20 |
$9.18 |
$14.84 |
$12.78 |
$12.44 |
| 730 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,630 | LF |
$2.00 |
$1.10 |
$1.05 |
$1.10 |
$1.02 |
$1.07 |
$1.07 |
$1.04 |
| 740 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 1 | EA |
$5,000.00 |
$800.00 |
$787.50 |
$825.00 |
$1,274.86 |
$825.00 |
$798.75 |
$777.68 |
| 750 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$9,460.00 |
$9,900.00 |
$9,000.00 |
$14,345.96 |
$9,750.00 |
$7,500.00 |
$9,310.41 |
| 760 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$140,000.00 |
$100,000.00 |
$122,427.67 |
$97,147.00 |
$249,475.27 |
$137,500.00 |
$117,200.00 |
$197,653.33 |