| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$8,900.00 |
| 20 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$38,500.00 |
| 30 | 221(C) 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$2.75 |
$9.00 |
$1.70 |
| 40 | 221(F) 0100 |
TEMPORARY SILT DIKE | 700 | LF |
$10.00 |
$11.50 |
$5.00 |
| 50 | 230(A) 2806 |
SOLID SLAB SODDING | 12,500 | SY |
$3.00 |
$3.00 |
$2.42 |
| 60 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.6 | AC |
$1,000.00 |
$1,000.00 |
$200.00 |
| 70 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 1,050 | LF |
$5.00 |
$5.00 |
$4.95 |
| 80 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 735 | TON |
$38.00 |
$40.00 |
$36.75 |
| 90 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$250.00 |
$250.00 |
| 100 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 130 | LF |
$43.00 |
$45.00 |
$48.00 |
| 110 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 4 | EA |
$1,400.00 |
$1,300.00 |
$1,470.00 |
| 120 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 320 | CY |
$20.00 |
$10.00 |
$10.00 |
| 130 | 501(F) 6352 |
GRANULAR BACKFILL | 280 | CY |
$65.00 |
$80.00 |
$68.00 |
| 140 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 299 | LF |
$231.61 |
$225.00 |
$219.00 |
| 150 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 260.5 | LF |
$95.00 |
$80.00 |
$78.00 |
| 160 | 506(A) 1322 |
STRUCTURAL STEEL | 660 | LB |
$4.00 |
$4.50 |
$4.75 |
| 170 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$850.00 |
$1,050.00 |
| 180 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$1,100.00 |
$850.00 |
$1,050.00 |
| 190 | 509(A) 1326 |
CLASS AA CONCRETE | 67.1 | CY |
$700.00 |
$600.00 |
$630.00 |
| 200 | 509(B) 1328 |
CLASS A CONCRETE | 172.6 | CY |
$675.00 |
$600.00 |
$630.00 |
| 210 | 511(A) 1332 |
REINFORCING STEEL | 38,760 | LB |
$1.10 |
$1.40 |
$1.22 |
| 220 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 200 | LF |
$36.00 |
$40.00 |
$42.00 |
| 230 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 672 | LF |
$45.00 |
$38.00 |
$46.90 |
| 240 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 200 | LF |
$18.00 |
$48.00 |
$18.00 |
| 250 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 672 | LF |
$20.00 |
$15.00 |
$20.10 |
| 260 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 270 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,587 | TON |
$48.00 |
$54.00 |
$53.00 |
| 280 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 435 | TON |
$40.00 |
$44.00 |
$41.25 |
| 290 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$30.00 |
$30.00 |
$30.00 |
| 300 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$33.00 |
$35.00 |
$35.00 |
| 310 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$7,000.00 |
| 320 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 118.75 | LF |
$25.00 |
$26.00 |
$25.20 |
| 330 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 2 | EA |
$2,000.00 |
$2,200.00 |
$3,675.00 |
| 340 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 2 | EA |
$2,800.00 |
$3,600.00 |
$3,675.00 |
| 350 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$0.4000 |
$2.10 |
$0.1100 |
| 360 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$0.9000 |
$2.10 |
$0.1100 |
| 370 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$0.5000 |
$1.60 |
$1.10 |
| 380 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,160 | SD |
$0.2000 |
$0.4000 |
$1.10 |
| 390 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$3,630.00 |
$7,000.00 |
| 400 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$1,750.00 |
| 410 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$63,500.00 |
$30,000.00 |
$62,050.21 |