Bid tab 210335

Let Nov 18, 2021 · Division 2 · Pittsburg Sign up free

‹ Nov 2021 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER UNNAMED CREEK, 1.4 MILES WEST OF US-69 NEAR CROWDER. PROJECT LENGTH = 0.113 MILE

Let date
Thursday, November 18, 2021
Contract
210335
J/P numbers
23886(04)
District
Division 2
County
Pittsburg
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER UNNAMED CREEK, 1.4 MILES WEST OF US-69 NEAR CROWDER. PROJECT LENGTH = 0.113 MILE
Project number
STP-161D(198)CI

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$506,524
1 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION Low bidder $444,969 -12.2%
2 H & H BRIDGE COMPANY $472,374 -6.7% +6.2%
3 Treas Construction Inc $474,683 -6.3% +6.7%
4 Robinson Construction, LLC $485,595 -4.1% +9.1%
5 RRY SERVICES LLC $496,158 -2.0% +11.5%
6 HUB Construction, Inc. $510,859 +0.9% +14.8%
7 Built Right Construction, LLC $546,085 +7.8% +22.7%
8 HASKELL LEMON CONSTRUCTION CO. $562,899 +11.1% +26.5%

Bid tab: unit prices 47 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIGHT LIGHTING…#2 H & H BRIDGE CO…#3 Treas Construct…#4 Robinson Constr…#5 RRY SERVICES LLC#6 HUB Constructio…#7 Built Right Con…#8 HASKELL LEMON C…
10201(A)1200 CLEARING AND GRUBBING1LSUM $14,000.00 $8,500.00 $25,000.00 $8,250.00 $10,000.00 $3,500.00 $9,000.00 $25,000.00 $13,655.00
20202(A)2200 UNCLASSIFIED EXCAVATION1,183CY $12.00 $12.46 $12.00 $14.30 $15.00 $10.00 $12.00 $30.00 $26.80
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $14,000.00 $10,300.00 $2,500.00 $4,400.00 $15,000.00 $3,000.00 $8,500.00 $15,000.00 $14,950.00
40221(B)2300 TEMPORARY SILT FENCE100LF $3.50 $2.25 $3.99 $1.98 $6.00 $15.00 $7.00 $4.00 $4.40
50221(E)2600 TEMPORARY SILT DIKE147LF $10.00 $6.50 $8.50 $19.25 $9.00 $12.50 $14.00 $25.00 $9.35
60230(A)7200 SOLID SLAB SODDING3,545SY $4.00 $4.00 $6.95 $4.33 $4.70 $4.20 $6.00 $6.00 $7.65
70233(A)0200 VEGETATIVE MULCHING1AC $450.00 $450.00 $100.00 $3,173.50 $3,000.00 $2,885.00 $1,000.00 $5,000.00 $110.00
80307(K)4200 STABILIZED SUBGRADE1,656SY $12.00 $11.00 $12.00 $13.75 $6.85 $18.00 $14.00 $12.00 $18.70
90402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E570TON $55.00 $31.00 $30.00 $44.00 $31.50 $46.00 $54.00 $50.00 $42.90
100613(A)5350 22" X 13" R.C.PIPE ARCH CLASS A-III92LF $78.00 $112.00 $100.00 $82.50 $105.00 $110.00 $123.00 $55.00 $117.00
110613(EE)5968 (SP) 18" CORRUGATED POLYPROPYLENE PIPE22LF $105.00 $60.00 $100.00 $49.50 $57.60 $90.00 $131.00 $25.00 $68.60
120613(L)6612 22" X 13" PREFAB. CULVERT END SEC., ARCH4EA $400.00 $1,500.00 $750.00 $1,540.00 $950.00 $1,600.00 $1,500.00 $1,500.00 $1,400.00
130613(L)6708 18" PREFAB. CULVERT END SEC., ROUND2EA $1,400.00 $800.00 $750.00 $1,540.00 $300.00 $500.00 $1,800.00 $1,000.00 $1,103.00
140619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $10,000.00 $5,000.00 $2,750.00 $10.00 $3,000.00 $5,000.00 $10,000.00 $12,715.00
150623(F)1748 GUARDRAIL ANCHOR UNIT (TYPE II)4EA $4,000.00 $4,000.00 $3,160.00 $4,620.00 $5,250.00 $4,200.00 $3,900.00 $4,500.00 $3,814.00
160501(B)1300 SUBSTRUCTURE EXCAVATION COMMON180CY $22.00 $22.00 $50.00 $33.00 $30.00 $25.00 $20.00 $30.00 $36.40
170501(G)1800 CLSM BACKFILL66CY $190.00 $180.00 $200.00 $283.03 $190.00 $200.00 $188.00 $350.00 $196.00
180503(A)4220 PRESTRESSED CONCRETE BEAMS (TYPE II)134LF $250.00 $238.00 $275.00 $299.66 $350.00 $260.00 $394.00 $265.00 $276.00
190504(B)5300 SAW-CUT GROOVING115.3SY $11.00 $20.00 $25.00 $23.10 $24.00 $20.00 $22.00 $25.00 $22.00
200504(D)5410 CONCRETE RAIL (TR3)146LF $95.00 $74.00 $45.00 $94.24 $95.00 $135.00 $123.00 $120.00 $133.50
210506(A)7200 STRUCTURAL STEEL500LB $7.00 $5.00 $10.00 $6.44 $6.90 $7.00 $5.00 $5.00 $10.90
220507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $1,500.00 $920.00 $1,000.00 $1,301.91 $950.00 $1,800.00 $1,122.00 $2,000.00 $1,823.00
230507(B)8310 WEATHERING STL EXP. BEARING ASSEMBLY3EA $2,000.00 $2,000.00 $1,000.00 $1,301.91 $950.00 $1,800.00 $1,122.00 $2,000.00 $1,823.00
240509(A)0210 CLASS AA CONCRETE37.9CY $1,000.00 $670.00 $1,000.00 $943.06 $925.00 $1,100.00 $875.00 $650.00 $1,041.00
250509(B)0320 CLASS A CONCRETE60.4CY $1,000.00 $530.00 $1,000.00 $943.06 $825.00 $950.00 $850.00 $650.00 $792.50
260511(A)2210 REINFORCING STEEL17,480LB $1.50 $1.00 $1.25 $1.48 $1.20 $1.75 $1.33 $1.50 $2.40
270514(A)5210 PILES, FURNISHED (HP 10X42)70LF $38.00 $38.00 $50.00 $53.83 $65.00 $75.00 $60.00 $50.00 $76.60
280514(A)5220 PILES, FURNISHED (HP 12X53)160LF $42.00 $42.00 $61.25 $71.61 $85.00 $90.00 $63.00 $50.00 $94.40
290514(B)5310 PILES, DRIVEN (HP 10X42)70LF $18.00 $18.00 $5.00 $27.50 $65.00 $10.00 $10.00 $50.00 $33.30
300514(B)5320 PILES, DRIVEN (HP 12X53)160LF $16.00 $16.00 $5.00 $22.00 $85.00 $10.00 $10.00 $50.00 $38.20
310514(K)6200 (PL)PILOT HOLES60LF $300.00 $300.00 $545.00 $327.80 $340.00 $325.00 $331.00 $300.00 $284.50
320514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
330601(B)1230 TYPE I-A PLAIN RIPRAP270TON $50.00 $52.00 $50.00 $54.94 $55.00 $70.00 $60.00 $75.00 $54.60
340601(C)1310 TYPE I-A FILTER BLANKET45TON $46.00 $50.00 $50.00 $45.33 $45.00 $50.00 $45.00 $50.00 $50.20
350613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $27.00 $27.00 $65.00 $33.00 $24.00 $40.00 $28.00 $30.00 $93.30
360613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $24.00 $24.00 $65.00 $33.00 $24.00 $40.00 $28.00 $30.00 $24.00
370619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $18,000.00 $12,000.00 $10,000.00 $8,354.50 $15,000.00 $10,000.00 $15,000.00 $25,000.00 $13,630.00
380850(A)1200 SHEET ALUMINUM SIGNS6SF $0.4000 $0.4000 $115.00 $38.50 $42.00 $35.00 $142.00 $50.00 $27.50
390851(C)2415 2" SQUARE TUBE POST22LF $0.7300 $0.7300 $6.00 $16.50 $18.00 $15.00 $7.86 $20.00 $11.00
400880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF1,980SD $1.25 $1.25 $1.50 $1.10 $1.20 $1.05 $1.90 $1.00 $0.5500
410880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF720SD $0.6600 $0.6600 $1.50 $2.20 $2.40 $2.15 $1.80 $2.00 $1.10
420880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF540SD $0.3500 $0.3500 $1.50 $2.20 $2.40 $2.15 $1.80 $2.00 $2.20
430880(C)6410 CONSTRUCTION BARRICADES(TYPE III)900SD $24.00 $24.00 $1.20 $1.10 $1.80 $1.10 $1.40 $1.00 $1.65
440880(E)6600 WARNING LIGHTS(TYPE A)2,340SD $1.00 $0.4400 $0.2500 $1.10 $1.20 $1.10 $0.3100 $1.00 $0.3800
450642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $14,000.00 $14,000.00 $5,200.00 $4,678.30 $5,500.00 $5,000.00 $10,000.00 $7,500.00 $11,370.00
460220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $5,000.00 $1,000.00 $2,750.00 $1,500.00 $1,500.00 $2,250.00 $3,000.00 $3,572.00
470641 2110 MOBILIZATION1LSUM $40,000.00 $60,000.00 $40,000.00 $39,564.94 $50,000.00 $50,000.00 $55,000.00 $50,000.00 $41,821.66