| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$3,000.00 |
$7,500.00 |
$12,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,088 | CY |
$8.50 |
$6.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,108 | CY |
$12.00 |
$10.00 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,500.00 |
$3,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,747 | LF |
$1.20 |
$4.99 |
$4.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$10.00 |
$39.00 |
$39.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,348 | SY |
$8.00 |
$8.95 |
$8.95 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 1.36 | AC |
$1,200.00 |
$5,950.00 |
$1,000.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.36 | AC |
$800.00 |
$5,950.00 |
$1,000.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,560 | TON |
$25.00 |
$19.00 |
$25.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$305.00 |
$300.00 |
$275.00 |
| 12 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 60 | LF |
$75.00 |
$40.00 |
$60.00 |
| 13 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,600.00 |
$1,750.00 |
| 14 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$1,000.00 |
$3,000.00 |
| 15 | 508 6359 |
PRECAST ARCH CULVERT | 30 | LF |
$3,800.00 |
$7,000.00 |
$8,200.00 |
| 16 | 509(A) 1326 |
CLASS AA CONCRETE | 12.1 | CY |
$1,000.00 |
$400.00 |
$850.00 |
| 17 | 510(A) 6334 |
RETAINING WALL | 153.7 | SY |
$800.00 |
$750.00 |
$700.00 |
| 18 | 511(A) 1332 |
REINFORCING STEEL | 1,680 | LB |
$1.40 |
$2.00 |
$1.10 |
| 19 | 542 4605 |
(PL)INSTALLATION OF BRIDGE ITEMS | 28 | EA |
$1,500.00 |
$235.00 |
$250.00 |
| 20 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,963 | TON |
$40.00 |
$45.00 |
$39.00 |
| 21 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 222 | TON |
$35.00 |
$38.00 |
$33.00 |
| 22 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$12,500.00 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 237.5 | LF |
$20.00 |
$23.90 |
$23.90 |
| 24 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$4,540.00 |
$4,540.00 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,480.00 |
$2,480.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$5,100.00 |
$6,960.00 |
| 27 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$1,250.00 |
$2,000.00 |
$1,275.00 |
| 28 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$60,350.00 |
$61,000.00 |