| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,295.00 |
$5,000.00 |
$8,687.29 |
$10,000.00 |
$4,500.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,715.7 | CY |
$11.17 |
$5.00 |
$5.99 |
$10.00 |
$9.00 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 421.9 | CY |
$15.35 |
$8.00 |
$7.79 |
$15.00 |
$6.00 |
$25.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,450 | LF |
$1.87 |
$3.50 |
$3.58 |
$4.00 |
$2.50 |
$2.99 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 32 | LF |
$11.58 |
$12.00 |
$41.94 |
$11.00 |
$6.25 |
$35.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 299 | SY |
$5.49 |
$5.00 |
$8.33 |
$3.00 |
$7.50 |
$6.95 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 1.01 | AC |
$338.40 |
$1,500.00 |
$5,931.33 |
$5,500.00 |
$5,050.00 |
$4,950.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.01 | AC |
$364.70 |
$1,500.00 |
$5,931.33 |
$2,500.00 |
$5,050.00 |
$4,950.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 416.6 | CY |
$55.90 |
$55.00 |
$23.55 |
$50.00 |
$40.00 |
$55.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 21 | TON |
$43.99 |
$35.00 |
$23.55 |
$48.00 |
$25.00 |
$30.00 |
| 11 | 407(B) 0250 |
TACK COAT | 370.4 | GAL |
$4.39 |
$1.03 |
$1.23 |
$1.40 |
$1.10 |
$1.03 |
| 12 | 408 5774 |
PRIME COAT | 1,156.3 | GAL |
$6.02 |
$1.21 |
$1.45 |
$1.60 |
$1.30 |
$1.21 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 566.6 | TON |
$100.81 |
$66.10 |
$98.38 |
$105.80 |
$69.10 |
$66.10 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 374.2 | TON |
$114.47 |
$76.85 |
$111.26 |
$129.00 |
$79.85 |
$76.85 |
| 15 | 613(EE) 5650 |
(SP) 42" CORRUGATED POLYPROPYLENE PIPE | 40 | LF |
$120.00 |
$90.00 |
$84.48 |
$204.50 |
$100.00 |
$135.00 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 36 | LF |
$8.72 |
$6.00 |
$3.59 |
$5.00 |
$3.25 |
$5.00 |
| 17 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$19.72 |
$22.00 |
$26.36 |
$22.00 |
$19.50 |
$18.50 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,570.70 |
$1,500.00 |
$1,797.37 |
$1,410.00 |
$1,700.00 |
$1,525.00 |
| 19 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,383.23 |
$2,750.00 |
$3,295.18 |
$2,200.00 |
$2,500.00 |
$2,350.00 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 168 | CY |
$20.60 |
$10.00 |
$14.98 |
$15.00 |
$21.00 |
$15.00 |
| 21 | 501(G) 6309 |
CLSM BACKFILL | 102.8 | CY |
$176.15 |
$175.00 |
$161.76 |
$148.50 |
$180.00 |
$150.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 114.8 | SY |
$202.85 |
$260.00 |
$217.66 |
$200.00 |
$180.00 |
$220.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 313.86 | SY |
$6.97 |
$9.00 |
$10.78 |
$12.00 |
$14.00 |
$9.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29 | LF |
$249.18 |
$200.00 |
$212.09 |
$200.00 |
$325.00 |
$40.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 208.4 | LF |
$87.97 |
$85.00 |
$73.51 |
$80.00 |
$97.00 |
$100.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 6,230 | LB |
$2.39 |
$2.00 |
$5.27 |
$3.25 |
$7.00 |
$5.50 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$842.14 |
$1,750.00 |
$1,199.45 |
$988.00 |
$850.00 |
$1,250.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,011.10 |
$1,750.00 |
$1,200.65 |
$988.00 |
$850.00 |
$1,250.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 56.9 | CY |
$792.83 |
$850.00 |
$493.68 |
$629.00 |
$650.00 |
$800.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 64.2 | CY |
$759.64 |
$850.00 |
$490.08 |
$573.00 |
$650.00 |
$800.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 22,068 | LB |
$1.01 |
$1.00 |
$0.8300 |
$1.00 |
$0.9500 |
$1.10 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 88.08 | LF |
$40.16 |
$35.00 |
$31.38 |
$42.50 |
$55.00 |
$40.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 186.86 | LF |
$46.59 |
$45.00 |
$39.60 |
$49.00 |
$55.00 |
$50.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 88.08 | LF |
$13.39 |
$15.00 |
$19.17 |
$10.00 |
$44.00 |
$10.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 186.86 | LF |
$13.39 |
$19.00 |
$19.17 |
$10.00 |
$44.00 |
$10.00 |
| 36 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 37 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$45,000.00 |
$37,000.00 |
$30,555.31 |
$30,000.00 |
$45,000.00 |
$40,000.00 |
| 38 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 658.7 | TON |
$45.20 |
$35.00 |
$36.61 |
$40.00 |
$44.00 |
$50.00 |
| 39 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 219.6 | TON |
$38.92 |
$22.00 |
$36.61 |
$28.50 |
$34.00 |
$36.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$11,067.24 |
$15,000.00 |
$17,973.71 |
$10,000.00 |
$5,000.00 |
$20,000.00 |
| 41 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,400 | LF |
$0.5000 |
$0.4000 |
$0.4800 |
$0.5300 |
$0.6000 |
$0.4000 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,831.00 |
$2,250.00 |
$2,696.06 |
$3,000.00 |
$3,500.00 |
$2,250.00 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,884.00 |
$6,000.00 |
$7,429.13 |
$6,650.00 |
$11,000.00 |
$7,700.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,576.00 |
$2,000.00 |
$1,797.37 |
$2,150.00 |
$3,500.00 |
$1,275.00 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$57,494.00 |
$50,000.00 |
$52,722.89 |
$35,000.00 |
$50,000.00 |
$55,000.00 |