| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$14,000.00 |
$8,000.00 |
$7,500.00 |
$24,500.00 |
$15,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 254 | CY |
$25.00 |
$15.00 |
$16.00 |
$12.00 |
$16.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 563 | CY |
$18.00 |
$15.00 |
$16.00 |
$13.50 |
$30.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,000.00 |
$8,500.00 |
$4,750.00 |
$2,850.00 |
$2,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,450 | LF |
$2.50 |
$2.80 |
$2.75 |
$4.50 |
$2.65 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 168 | LF |
$11.50 |
$14.50 |
$14.00 |
$18.00 |
$13.89 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 1,598 | SY |
$7.00 |
$5.85 |
$5.10 |
$7.50 |
$5.25 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.33 | AC |
$800.00 |
$3,450.00 |
$1,000.00 |
$3,150.00 |
$3,295.00 |
| 90 | 241 3100 |
MOWING | 0.66 | AC |
$200.00 |
$2,300.00 |
$150.00 |
$225.00 |
$2,195.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 345 | CY |
$65.00 |
$67.00 |
$63.25 |
$82.50 |
$82.55 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 2,267 | SY |
$15.00 |
$8.00 |
$10.50 |
$14.50 |
$16.00 |
| 120 | 325 0100 |
SEPARATOR FABRIC | 2,510 | SY |
$2.50 |
$2.00 |
$3.00 |
$3.75 |
$3.46 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 252 | TON |
$45.00 |
$33.50 |
$33.50 |
$35.70 |
$50.60 |
| 140 | 407(B)7300 |
TACK COAT | 158 | GAL |
$3.50 |
$4.20 |
$20.00 |
$5.00 |
$16.02 |
| 150 | 408 8100 |
PRIME COAT | 1,300 | GAL |
$4.00 |
$5.25 |
$6.00 |
$5.40 |
$6.08 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 359 | TON |
$150.00 |
$116.00 |
$128.50 |
$117.36 |
$117.44 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 235 | TON |
$175.00 |
$122.00 |
$133.50 |
$126.77 |
$119.48 |
| 180 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 65 | LF |
$45.00 |
$65.00 |
$72.00 |
$48.64 |
$90.00 |
| 190 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 36 | LF |
$40.00 |
$52.00 |
$64.00 |
$40.65 |
$67.00 |
| 200 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$1,200.00 |
$1,200.00 |
$1,250.00 |
$1,550.00 |
| 210 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,400.00 |
$1,200.00 |
$1,250.00 |
$1,750.00 |
| 220 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,125.00 |
$3,500.00 |
$2,500.00 |
| 230 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,505 | SY |
$6.00 |
$6.50 |
$4.00 |
$8.50 |
$10.11 |
| 240 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$2,000.00 |
$2,550.00 |
$2,400.00 |
$3,500.00 |
$3,200.00 |
| 250 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$2,550.00 |
$2,400.00 |
$3,500.00 |
$3,200.00 |
| 260 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$20.00 |
$15.00 |
$9.00 |
$14.00 |
$15.00 |
| 270 | 501(G)1800 |
CLSM BACKFILL | 104 | CY |
$250.00 |
$175.00 |
$174.00 |
$210.15 |
$190.00 |
| 280 | 503(A)4270 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 389 | LF |
$260.00 |
$295.00 |
$320.00 |
$322.80 |
$400.00 |
| 290 | 504(A)5200 |
APPROACH SLAB | 115 | SY |
$275.00 |
$240.00 |
$240.00 |
$291.30 |
$275.00 |
| 300 | 504(B)5300 |
SAW-CUT GROOVING | 496.6 | SY |
$10.00 |
$8.00 |
$7.30 |
$8.00 |
$7.25 |
| 310 | 504(D)5410 |
CONCRETE RAIL (TR3) | 336.6 | LF |
$95.00 |
$75.00 |
$81.00 |
$78.00 |
$95.00 |
| 320 | 506(A)7200 |
STRUCTURAL STEEL | 380 | LB |
$3.75 |
$3.00 |
$3.00 |
$3.62 |
$3.50 |
| 330 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,300.00 |
$620.00 |
$600.00 |
$750.00 |
$700.00 |
| 340 | 509(A)0210 |
CLASS AA CONCRETE | 140.4 | CY |
$750.00 |
$550.00 |
$652.00 |
$650.00 |
$750.00 |
| 350 | 509(B)0320 |
CLASS A CONCRETE | 48.2 | CY |
$800.00 |
$600.00 |
$672.00 |
$700.00 |
$750.00 |
| 360 | 511(A)2210 |
REINFORCING STEEL | 32,070 | LB |
$1.50 |
$1.40 |
$1.26 |
$1.29 |
$1.50 |
| 370 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 1,746 | LF |
$50.00 |
$50.00 |
$43.40 |
$48.67 |
$70.00 |
| 380 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 1,746 | LF |
$18.00 |
$11.00 |
$18.60 |
$12.00 |
$10.00 |
| 390 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 400 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 874 | TON |
$50.00 |
$48.00 |
$47.75 |
$47.00 |
$55.00 |
| 410 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 209 | TON |
$38.00 |
$36.00 |
$35.90 |
$44.00 |
$45.00 |
| 420 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$30.00 |
$30.00 |
$40.00 |
| 430 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$20.00 |
$30.00 |
$30.00 |
$25.00 |
$40.00 |
| 440 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$14,000.00 |
$22,500.00 |
$30,000.00 |
| 450 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 32 | EA |
$17.00 |
$16.00 |
$14.20 |
$24.00 |
$21.00 |
| 460 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,800 | LF |
$0.9000 |
$1.95 |
$1.87 |
$3.50 |
$3.25 |
| 470 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,600 | SD |
$0.4000 |
$0.0400 |
$0.0300 |
$0.2900 |
$0.2500 |
| 480 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$1.50 |
$0.0400 |
$0.0300 |
$1.07 |
$1.00 |
| 490 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 480 | SD |
$1.60 |
$2.50 |
$2.45 |
$2.14 |
$2.45 |
| 500 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$1.30 |
$2.50 |
$2.45 |
$1.63 |
$1.65 |
| 510 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$0.7500 |
$0.7500 |
$0.4900 |
$1.63 |
$1.65 |
| 520 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$5,500.00 |
$6,500.00 |
$6,250.00 |
$9,500.00 |
| 530 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,000.00 |
$3,000.00 |
$1,500.00 |
| 540 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$63,000.00 |
$40,000.00 |
$61,500.00 |
$51,500.00 |
$78,000.00 |