| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$22,000.00 |
$15,450.00 |
$15,000.00 |
$27,500.00 |
$16,500.00 |
$18,000.00 |
$15,000.00 |
$9,979.72 |
$24,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,934 | CY |
$9.62 |
$3.86 |
$5.50 |
$5.72 |
$4.13 |
$4.50 |
$5.00 |
$8.73 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 30,215 | CY |
$8.87 |
$4.89 |
$6.25 |
$6.75 |
$5.23 |
$5.70 |
$7.75 |
$9.98 |
$9.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,000.00 |
$14,935.00 |
$10,000.00 |
$11,500.00 |
$15,950.00 |
$2,900.00 |
$7,500.00 |
$6,237.32 |
$8,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,020 | LF |
$2.00 |
$2.06 |
$1.25 |
$3.10 |
$2.20 |
$2.93 |
$2.99 |
$3.73 |
$2.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 360 | LF |
$8.50 |
$15.45 |
$7.00 |
$18.50 |
$16.50 |
$15.19 |
$18.00 |
$22.45 |
$18.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 3,440 | SY |
$2.50 |
$4.12 |
$4.25 |
$4.04 |
$4.40 |
$6.58 |
$3.95 |
$4.93 |
$3.95 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 6.4 | AC |
$400.00 |
$1,545.00 |
$3,050.00 |
$2,975.00 |
$1,650.00 |
$1,200.00 |
$2,950.00 |
$623.73 |
$2,950.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 14.2 | AC |
$300.00 |
$824.00 |
$1,555.00 |
$1,475.00 |
$880.00 |
$750.00 |
$1,450.00 |
$1,808.82 |
$1,450.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,000 | TON |
$25.00 |
$23.93 |
$21.50 |
$27.20 |
$25.36 |
$27.55 |
$27.00 |
$30.56 |
$20.85 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$340.53 |
$515.00 |
$420.00 |
$250.00 |
$439.69 |
$277.00 |
$200.00 |
$254.48 |
$300.00 |
| 12 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 100 | TON |
$42.23 |
$46.38 |
$36.00 |
$42.75 |
$65.57 |
$49.00 |
$44.00 |
$40.54 |
$35.94 |
| 13 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 44 | LF |
$85.00 |
$51.90 |
$35.00 |
$68.61 |
$57.37 |
$60.00 |
$50.00 |
$78.90 |
$35.00 |
| 14 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 94 | LF |
$98.00 |
$61.35 |
$65.00 |
$89.73 |
$70.86 |
$69.70 |
$90.00 |
$133.29 |
$60.00 |
| 15 | 613(EE) 5660 |
(SP) 48" CORRUGATED POLYPROPYLENE PIPE | 236 | LF |
$154.00 |
$80.08 |
$120.00 |
$140.00 |
$101.66 |
$95.67 |
$110.00 |
$199.22 |
$80.00 |
| 16 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,333.14 |
$1,545.00 |
$2,100.00 |
$1,250.00 |
$1,361.15 |
$1,995.00 |
$1,500.00 |
$310.87 |
$1,500.00 |
| 17 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,774.63 |
$1,751.00 |
$2,300.00 |
$1,500.00 |
$2,093.78 |
$2,995.00 |
$2,250.00 |
$321.54 |
$2,000.00 |
| 18 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 6 | EA |
$2,200.00 |
$2,266.00 |
$3,100.00 |
$1,875.00 |
$2,484.85 |
$3,995.00 |
$2,900.00 |
$324.34 |
$2,500.00 |
| 19 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 325 | CY |
$54.28 |
$52.50 |
$55.00 |
$38.50 |
$47.65 |
$75.00 |
$50.00 |
$36.18 |
$39.14 |
| 20 | 613(V) 1180 |
TRENCH EXCAVATION | 650 | CY |
$13.34 |
$10.30 |
$4.00 |
$8.00 |
$11.00 |
$10.00 |
$5.00 |
$12.47 |
$20.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$3,090.00 |
$7,500.00 |
$3,500.00 |
$3,300.00 |
$3,600.00 |
$3,500.00 |
$1,247.46 |
$7,500.00 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 450 | LF |
$20.00 |
$17.00 |
$18.00 |
$17.10 |
$18.65 |
$20.34 |
$16.95 |
$24.95 |
$16.50 |
| 23 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,732.20 |
$2,188.75 |
$1,600.00 |
$2,450.00 |
$1,595.00 |
$1,560.00 |
$1,300.00 |
$3,118.66 |
$1,450.00 |
| 24 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,403.99 |
$1,493.50 |
$2,200.00 |
$1,750.00 |
$1,430.00 |
$2,750.00 |
$1,450.00 |
$1,871.20 |
$2,125.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$25.00 |
$25.75 |
$14.00 |
$10.00 |
$33.00 |
$25.00 |
$15.00 |
$7.48 |
$25.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$165.00 |
$181.21 |
$135.00 |
$146.00 |
$132.46 |
$152.64 |
$135.00 |
$152.19 |
$120.00 |
| 27 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$238.24 |
$225.17 |
$275.00 |
$233.48 |
$257.44 |
$275.00 |
$280.00 |
$245.75 |
$350.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 266.7 | SY |
$7.94 |
$13.39 |
$16.00 |
$12.72 |
$13.20 |
$14.40 |
$12.00 |
$14.97 |
$12.00 |
| 29 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$84.05 |
$75.99 |
$80.00 |
$73.00 |
$75.94 |
$73.33 |
$85.00 |
$78.15 |
$175.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 1,890 | LB |
$2.56 |
$2.43 |
$2.15 |
$2.50 |
$4.75 |
$2.75 |
$3.00 |
$4.34 |
$7.00 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$805.16 |
$770.73 |
$830.00 |
$550.00 |
$1,082.11 |
$1,275.00 |
$850.00 |
$607.71 |
$600.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$940.03 |
$770.73 |
$830.00 |
$550.00 |
$1,082.11 |
$1,275.00 |
$850.00 |
$607.71 |
$600.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 86.1 | CY |
$700.00 |
$473.37 |
$680.00 |
$535.00 |
$722.49 |
$675.00 |
$650.00 |
$674.88 |
$810.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$650.00 |
$473.37 |
$680.00 |
$535.00 |
$774.58 |
$675.00 |
$650.00 |
$421.64 |
$810.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 35,235 | LB |
$1.00 |
$0.9500 |
$0.8500 |
$1.00 |
$1.22 |
$1.55 |
$0.9500 |
$0.8000 |
$1.25 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 122 | LF |
$35.96 |
$26.50 |
$44.00 |
$29.15 |
$37.61 |
$38.20 |
$40.00 |
$26.46 |
$30.00 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 271 | LF |
$44.35 |
$32.08 |
$42.00 |
$32.11 |
$47.97 |
$48.20 |
$50.00 |
$33.39 |
$40.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 122 | LF |
$13.41 |
$15.45 |
$22.00 |
$14.00 |
$22.00 |
$15.00 |
$10.00 |
$24.95 |
$15.00 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 271 | LF |
$13.10 |
$15.45 |
$18.00 |
$14.00 |
$27.50 |
$15.00 |
$10.00 |
$24.95 |
$20.00 |
| 40 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 41 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,120 | TON |
$39.80 |
$43.29 |
$38.50 |
$40.75 |
$43.57 |
$44.67 |
$45.00 |
$41.17 |
$36.00 |
| 42 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 220 | TON |
$32.86 |
$33.18 |
$34.50 |
$35.40 |
$30.76 |
$34.67 |
$33.00 |
$31.81 |
$28.00 |
| 43 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$29.80 |
$30.90 |
$8.00 |
$30.00 |
$35.91 |
$27.75 |
$35.00 |
$14.35 |
$50.00 |
| 44 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 70 | LF |
$23.74 |
$30.90 |
$8.00 |
$25.00 |
$24.50 |
$25.00 |
$35.00 |
$14.35 |
$40.00 |
| 45 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$6,180.00 |
$5,500.00 |
$7,500.00 |
$6,600.00 |
$21,250.00 |
$10,000.00 |
$16,840.77 |
$20,000.00 |
| 46 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 57.5 | SF |
$20.00 |
$15.45 |
$16.00 |
$16.50 |
$30.80 |
$18.00 |
$15.00 |
$18.71 |
$15.00 |
| 47 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 146 | LF |
$20.00 |
$10.30 |
$12.00 |
$11.50 |
$6.60 |
$12.00 |
$10.00 |
$12.47 |
$10.00 |
| 48 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 36 | EA |
$12.13 |
$20.60 |
$17.00 |
$18.00 |
$15.40 |
$18.00 |
$15.00 |
$18.71 |
$50.00 |
| 49 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$25,235.00 |
$3,200.00 |
$3,000.00 |
$2,200.00 |
$2,880.00 |
$2,400.00 |
$2,993.92 |
$2,400.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$8,505.00 |
$11,000.00 |
$13,400.00 |
$9,900.00 |
$12,750.00 |
$9,000.00 |
$10,104.46 |
$8,200.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,090.00 |
$3,000.00 |
$2,500.00 |
$3,850.00 |
$3,750.00 |
$1,275.00 |
$1,871.20 |
$3,500.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$41,948.70 |
$40,000.00 |
$35,000.00 |
$71,315.08 |
$75,000.00 |
$75,000.00 |
$63,994.94 |
$114,150.00 |