| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$10,000.00 |
$12,500.00 |
| 20 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$60,000.00 |
$40,000.00 |
$30,000.00 |
$39,000.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 770 | LF |
$2.75 |
$3.00 |
$3.00 |
$2.00 |
| 40 | 221(E)2600 |
TEMPORARY SILT DIKE | 200 | LF |
$10.00 |
$12.00 |
$11.50 |
$10.00 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 4,700 | SY |
$3.00 |
$3.80 |
$3.65 |
$3.52 |
| 60 | 233(A)0200 |
VEGETATIVE MULCHING | 0.98 | AC |
$1,000.00 |
$785.00 |
$750.00 |
$250.00 |
| 70 | 303(A)1200 |
AGGREGATE BASE TYPE A | 726 | CY |
$90.00 |
$84.00 |
$80.00 |
$81.50 |
| 80 | 311(A)6200 |
PROCESS EXISTING BASE & SURFACE,METHOD A | 760 | LF |
$15.00 |
$16.50 |
$8.65 |
$24.00 |
| 90 | 326(B)1300 |
GEOGRID REINFORCEMENT | 2,019 | SY |
$2.00 |
$2.00 |
$4.50 |
$5.55 |
| 100 | 408 8100 |
PRIME COAT | 505 | GAL |
$7.12 |
$6.30 |
$6.00 |
$6.60 |
| 110 | 509(D)0500 |
CLASS C CONCRETE | 62 | CY |
$350.00 |
$400.00 |
$400.00 |
$425.00 |
| 120 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$16.00 |
$25.00 |
$15.00 |
$12.50 |
| 130 | 501(F)1700 |
GRANULAR BACKFILL | 80 | CY |
$72.00 |
$80.00 |
$100.00 |
$93.50 |
| 140 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 476 | LF |
$225.00 |
$260.00 |
$255.00 |
$256.00 |
| 150 | 504(D)5410 |
CONCRETE RAIL (TR3) | 296 | LF |
$85.00 |
$90.00 |
$90.00 |
$89.00 |
| 160 | 506(A)7200 |
STRUCTURAL STEEL | 1,100 | LB |
$3.75 |
$5.00 |
$5.00 |
$5.15 |
| 170 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,000.00 |
$1,350.00 |
$1,500.00 |
$1,472.00 |
| 180 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$1,100.00 |
$1,350.00 |
$1,500.00 |
$1,472.00 |
| 190 | 509(A)0210 |
CLASS AA CONCRETE | 119.8 | CY |
$650.00 |
$700.00 |
$725.00 |
$760.00 |
| 200 | 509(B)0320 |
CLASS A CONCRETE | 115.6 | CY |
$675.00 |
$700.00 |
$725.00 |
$760.00 |
| 210 | 511(A)2210 |
REINFORCING STEEL | 44,340 | LB |
$1.10 |
$1.40 |
$1.35 |
$1.40 |
| 220 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 92 | LF |
$34.00 |
$45.00 |
$60.00 |
$59.50 |
| 230 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 280 | LF |
$42.00 |
$55.00 |
$70.00 |
$70.00 |
| 240 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 92 | LF |
$16.00 |
$20.00 |
$8.00 |
$25.50 |
| 250 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 280 | LF |
$17.50 |
$20.00 |
$8.00 |
$30.00 |
| 260 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 270 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 64 | LF |
$850.00 |
$900.00 |
$900.00 |
$1,140.00 |
| 280 | 518(B)0300 |
SEALED EXPANSION JOINTS | 35.17 | LF |
$325.00 |
$360.00 |
$400.00 |
$375.00 |
| 290 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 1,658 | TON |
$50.00 |
$60.00 |
$65.00 |
$57.00 |
| 300 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$30.00 |
$35.00 |
$50.00 |
$40.00 |
| 310 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 46 | LF |
$28.00 |
$35.00 |
$50.00 |
$53.00 |
| 320 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$20,000.00 |
$27,800.00 |
| 330 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$3,000.00 |
$3,000.00 |
$4,070.00 |
| 340 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$3,900.00 |
$3,300.00 |
$3,740.00 |
| 350 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$1.00 |
$1.10 |
$2.15 |
$1.00 |
| 360 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$1.50 |
$1.10 |
$3.25 |
$1.00 |
| 370 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$0.7500 |
$2.05 |
$2.15 |
$2.00 |
| 380 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,640 | SD |
$0.4000 |
$1.05 |
$0.5500 |
$1.00 |
| 390 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,750.00 |
$6,100.00 |
$8,500.00 |
| 400 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,500.00 |
$1,675.00 |
$1,800.00 |
| 410 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$72,000.00 |
$50,000.00 |
$82,000.00 |
$77,000.00 |
| 420 | 407(B)7300 |
TACK COAT | 167 | GAL |
$5.00 |
$4.20 |
$4.00 |
$4.00 |
| 430 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 375 | TON |
$120.00 |
$122.00 |
$119.00 |
$123.00 |
| 440 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 247 | TON |
$140.00 |
$134.00 |
$127.00 |
$136.00 |
| 450 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 1,700 | LF |
$1.67 |
$4.00 |
$3.25 |
$4.12 |