| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$52,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,478 | CY |
$10.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,278 | CY |
$25.00 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$15,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 635 | LF |
$10.00 |
$6.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,774 | LF |
$4.00 |
$2.99 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 608 | LF |
$10.00 |
$18.95 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 37,446 | SY |
$3.00 |
$3.95 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.2 | AC |
$700.00 |
$2,950.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,807 | CY |
$50.00 |
$60.00 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 14,009 | SY |
$2.00 |
$1.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 402 | TON |
$40.00 |
$30.00 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,783 | TON |
$85.00 |
$90.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,864 | TON |
$90.00 |
$105.00 |
| 15 | 412 5267 |
COLD MILLING PAVEMENT | 4,269 | SY |
$10.00 |
$8.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$250.00 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 785 | TON |
$45.00 |
$40.00 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 356 | TON |
$40.00 |
$35.00 |
| 19 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 192 | LF |
$30.00 |
$45.00 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$1,400.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$47,000.00 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 260 | CY |
$30.00 |
$15.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 170 | CY |
$150.00 |
$135.00 |
| 24 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 578.67 | LF |
$305.00 |
$350.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 384.5 | LF |
$70.00 |
$90.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 1,120 | LB |
$5.00 |
$2.30 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$1,300.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$1,200.00 |
$1,300.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 160.1 | CY |
$650.00 |
$750.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 106.2 | CY |
$650.00 |
$750.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 50,150 | LB |
$1.05 |
$1.15 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 208 | LF |
$40.00 |
$35.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 833 | LF |
$50.00 |
$45.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 208 | LF |
$15.00 |
$10.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 833 | LF |
$20.00 |
$10.00 |
| 36 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
| 37 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 4,264 | TON |
$45.00 |
$38.00 |
| 38 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 1,033 | TON |
$40.00 |
$33.00 |
| 39 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$30.00 |
$35.00 |
| 40 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$35.00 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
| 42 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$1,400.00 |
| 43 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 40 | LF |
$25.00 |
$38.00 |
| 44 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,600.00 |
$2,600.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 18 | SF |
$50.00 |
$20.00 |
| 46 | 851(C) 8324 |
2" SQUARE TUBE POST | 28 | LF |
$20.00 |
$10.00 |
| 47 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 20,200 | LF |
$0.7000 |
$0.5000 |
| 48 | 880(C) 8845 |
BARRICADES(TYPE III) | 2 | EA |
$1,000.00 |
$750.00 |
| 49 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,500.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$23,599.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$500.00 |
| 52 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$1,200.00 |
| 53 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$120,844.00 |
$125,000.00 |