| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$12,500.00 |
$12,000.00 |
$30,000.00 |
$20,000.00 |
$5,000.00 |
$20,475.00 |
$8,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 5,798 | CY |
$9.00 |
$7.10 |
$12.00 |
$13.00 |
$17.00 |
$8.00 |
$9.17 |
$11.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 582 | CY |
$11.00 |
$23.00 |
$15.00 |
$18.00 |
$29.30 |
$15.00 |
$11.20 |
$22.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 286 | LF |
$3.00 |
$7.00 |
$7.30 |
$7.25 |
$6.95 |
$8.50 |
$7.30 |
$6.95 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 280 | LF |
$12.00 |
$12.99 |
$13.60 |
$17.50 |
$12.95 |
$15.00 |
$13.60 |
$12.95 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 12,496 | SY |
$3.00 |
$2.84 |
$3.00 |
$2.75 |
$2.58 |
$4.00 |
$2.71 |
$2.58 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 6.94 | AC |
$1,000.00 |
$250.00 |
$780.00 |
$745.00 |
$745.00 |
$1,100.00 |
$782.25 |
$745.00 |
| 80 | 307(K)4200 |
STABILIZED SUBGRADE | 3,551 | SY |
$10.00 |
$7.70 |
$15.00 |
$8.45 |
$7.00 |
$9.00 |
$7.64 |
$10.00 |
| 90 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 453 | TON |
$30.00 |
$43.50 |
$35.00 |
$50.00 |
$40.00 |
$45.00 |
$30.56 |
$40.00 |
| 100 | 408 8100 |
PRIME COAT | 1,309 | GAL |
$3.00 |
$6.00 |
$12.00 |
$10.00 |
$6.00 |
$6.00 |
$7.35 |
$10.00 |
| 110 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 756 | TON |
$150.00 |
$134.20 |
$145.00 |
$137.00 |
$122.00 |
$132.00 |
$136.50 |
$130.00 |
| 120 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 364 | TON |
$175.00 |
$181.50 |
$192.00 |
$180.00 |
$165.00 |
$175.00 |
$178.50 |
$170.00 |
| 130 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$300.00 |
$400.00 |
$350.00 |
$1,240.00 |
$500.00 |
$464.24 |
$750.00 |
| 140 | 613(B)5552 |
72" CORR. GALV. STEEL PIPE | 90 | LF |
$100.00 |
$285.00 |
$220.00 |
$300.00 |
$178.20 |
$225.00 |
$101.85 |
$190.00 |
| 150 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 162 | LF |
$40.00 |
$61.00 |
$50.00 |
$65.00 |
$98.00 |
$75.00 |
$40.74 |
$80.00 |
| 160 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 10 | EA |
$250.00 |
$375.00 |
$250.00 |
$435.00 |
$522.00 |
$250.00 |
$254.63 |
$210.00 |
| 170 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$4,400.00 |
$7,000.00 |
$2,000.00 |
$10,000.00 |
$5,000.00 |
$2,835.00 |
$4,500.00 |
| 180 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 964 | LF |
$9.00 |
$8.50 |
$9.25 |
$22.00 |
$15.80 |
$13.00 |
$16.59 |
$15.80 |
| 190 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$300.00 |
$500.00 |
$550.00 |
$500.00 |
$50.00 |
$500.00 |
$525.00 |
$500.00 |
| 200 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,270 | CY |
$10.00 |
$7.00 |
$12.00 |
$13.50 |
$10.00 |
$15.00 |
$11.27 |
$11.00 |
| 210 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 253 | CY |
$25.00 |
$13.25 |
$15.00 |
$16.00 |
$30.00 |
$15.00 |
$36.75 |
$20.00 |
| 220 | 509(A)0210 |
CLASS AA CONCRETE | 433.1 | CY |
$600.00 |
$485.00 |
$485.00 |
$615.00 |
$505.63 |
$720.00 |
$856.09 |
$895.00 |
| 230 | 511(A)2210 |
REINFORCING STEEL | 71,940 | LB |
$1.50 |
$1.39 |
$1.40 |
$1.30 |
$1.50 |
$1.40 |
$1.47 |
$1.50 |
| 240 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$25,500.00 |
$8,000.00 |
$5,000.00 |
$50,000.00 |
$5,000.00 |
$10,614.45 |
$100,000.00 |
| 250 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$85.00 |
$125.00 |
$135.00 |
$130.00 |
$50.00 |
$125.00 |
$131.25 |
$125.00 |
| 260 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$250.00 |
$350.00 |
$360.00 |
$370.00 |
$200.00 |
$400.00 |
$367.50 |
$350.00 |
| 270 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 100 | SD |
$150.00 |
$70.00 |
$72.00 |
$75.00 |
$325.00 |
$70.00 |
$73.50 |
$70.00 |
| 280 | 854(A)6200 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,711 | LF |
$0.2500 |
$0.4000 |
$0.4200 |
$0.4000 |
$1.00 |
$0.5000 |
$0.4200 |
$0.4000 |
| 290 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,000 | SD |
$1.00 |
$0.2500 |
$0.2700 |
$0.2500 |
$3.00 |
$0.2500 |
$0.2600 |
$0.2500 |
| 300 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 200 | SD |
$1.00 |
$8.00 |
$4.20 |
$4.25 |
$5.00 |
$4.00 |
$4.00 |
$4.00 |
| 340 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 800 | SD |
$1.00 |
$1.00 |
$1.05 |
$1.05 |
$1.50 |
$1.00 |
$1.00 |
$1.00 |
| 350 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,600 | SD |
$1.00 |
$4.00 |
$3.05 |
$3.15 |
$0.5000 |
$3.00 |
$3.00 |
$3.00 |
| 360 | 880(F)6700 |
DRUMS | 2,400 | SD |
$0.2500 |
$0.1000 |
$0.1200 |
$0.1000 |
$0.5500 |
$0.1000 |
$0.1100 |
$0.1000 |
| 310 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$14,450.00 |
$7,600.00 |
$6,900.00 |
$11,025.00 |
$8,000.00 |
$7,245.00 |
$10,000.00 |
| 320 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,950.00 |
$2,500.00 |
$1,650.00 |
$3,000.00 |
$2,500.00 |
$2,625.00 |
$2,000.00 |
| 330 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$64,500.00 |
$45,000.00 |
$70,000.00 |
$65,000.00 |
$100,000.00 |
$80,364.45 |
$89,000.00 |