22Let jobs
$224,635,633Total low bids
$183,139,819Total estimates
+22.7%Low bids vs estimates
Aug 2022 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 18, 2022 | 220268STP-267B(093)PM | Stp-167b(091)pm |
SEMINOLE GRADE, DRAIN, SURFACE , AND BRIDGE US-270: FROM 0.1 MILES WEST OF THE SH -270A JUNCTION, EXTEND SOUTHEAST NEAR SEMINOLE . PROJECT LENGTH = 7.628 MILES · | $43,336,577 | $56,954,722 | OVERLAND CORPORATION | +31.4% | 4 |
| Aug 18, 2022 | 210112STP-242C(079)PM | Logan Division 4 |
BRIDGE AND APPROACHES US-77/SH-51: US-77, OVER E BEAVER CREEK 0.2 MILES NORTH OF THE SH -51 JCT. SH-51, OVER E BEAVER CREEK 0.2 MILES W OF THE US -77 JCT, OVER BNSF RAILROAD 0.1 MILES E OF THE US -77 JCT AND OVER E BEAVER CREEK TRIBUTARY 0.6 MILES E OF TH · | $26,067,052 | $24,373,335 | SHERWOOD CONSTRUCTION CO., INC. | -6.5% | 2 |
| Aug 18, 2022 | 220254NHPP-245N(006)PM | Mccurtain Division 2 |
GRADE, DRAIN, SURFACE , AND BRIDGE SH-3: FROM 0.2 MILES NORTHWEST OF THE SH -98 JUNCTION, EXTEND SOUTHEAST NEAR BROKEN BOW . PROJECT LENGTH = 1.877 MILES · | $19,051,074 | $19,357,493 | BRIDGECO CONTRACTORS, INC. | +1.6% | 3 |
| Aug 18, 2022 | 220273NHPPI-2440-(038)3B | Nhppi-2440-(035)pm |
TULSA BRIDGE AND APPROACHES AND JOINT /SEAL REPAIR US-169/I-244: US-169, SW RAMP OVER I -244 1.0 MILE EAST OF THE SH -11 INTERCHANGE IN TULSA . I-244, OVER MINGO CREEK 0.7 MILES EAST OF THE SH -11 INTERCHANGE IN TULSA. PROJECT LENGTH = 0.548 MILE · | — | $19,205,650 | MANHATTAN ROAD & BRIDGE COMPANY, LLC | 2 | |
| Aug 18, 2022 | 220195NHPPI-4000-(152)PM | Custer Division 5 |
BRIDGE AND APPROACHES CITY STREET (AIRPORT ROAD ): OVER I-40, 5.0 MILES NORTH OF THE WASHITA COUNTY LINE IN WEATHERFORD. PROJECT LENGTH = 0.681 MILE · | $19,004,372 | $18,968,670 | Frontier Bridge, Inc. | -0.2% | 3 |
| Aug 18, 2022 | 220252STP-243C(042)PM | Love Division 7 |
GRADE, DRAIN, SURFACE , AND BRIDGE US-77: FROM 1.1 MILES NORTH OF THE SH -153 JUNCTION, EXTEND NORTH NEAR THACKERVILLE . PROJECT LENGTH = 1.843 MILES · | $16,196,174 | $15,773,915 | OVERLAND CORPORATION | -2.6% | 3 |
| Aug 18, 2022 | 220251STP-126C(088)PM | Grady Division 7 |
GRADE, DRAIN, SURFACE , AND BRIDGE US-277: FROM 1.5 MILES EAST OF THE CADDO COUNTY LINE , EXTEND EAST NEAR CEMENT . PROJECT LENGTH = 2.467 MILES · | $13,576,644 | $14,273,863 | OVERLAND CORPORATION | +5.1% | 2 |
| Aug 18, 2022 | 220262NHPP-256N(059)PM | Okmulgee Division 1 |
BRIDGE AND APPROACHES US-75: OVER SH-16, 7.3 MILES NORTH OF THE SH -56 JUNCTION NEAR BEGGS. PROJECT LENGTH = 0.302 MILE · | $12,500,190 | $11,385,925 | SHERWOOD CONSTRUCTION CO., INC. | -8.9% | 1 |
| Aug 18, 2022 | 220274STP-276B(064)PM | Woods Division 6 |
GRADE, DRAIN, SURFACE , AND BRIDGE US-281: FROM 4.3 MILES WEST OF THE SH -45 JUNCTION, EXTEND EAST NEAR WAYNOKA . PROJECT LENGTH = 3.550 MILES · | $9,101,625 | $9,960,483 | THE CUMMINS CONSTRUCTION CO., INC. | +9.4% | 1 |
| Aug 18, 2022 | 220249STP-211B(039)PM | Cherokee Division 1 |
WIDEN, RESURFACE , AND BRIDGE US-62: FROM 1.5 MILES EAST OF THE SH -10 JUNCTION, EXTEND EAST NEAR BRIGGS . PROJECT LENGTH = 2.558 MILES · | — | $8,926,047 | APAC-CENTRAL, INC. | 1 | |
| Aug 18, 2022 | 220265STP-258B(089)PM | Ottawa Division 8 |
INTERSECTION MODIFICATION SH-69A: AT THE INTERSECTION OF SH-10 IN MIAMI. PROJECT LENGTH = 0.509 MILE · | $2,632,367 | $3,657,000 | BECCO CONTRACTORS, INC. | +38.9% | 2 |
| Aug 18, 2022 | 220248NHPP-201N(052)PM | Adair Division 1 |
RESURFACE (ASPHALT ) US-59: FROM THE DELAWARE COUNTY LINE , EXTEND SOUTH NEAR WATTS . PROJECT LENGTH = 2.959 MILES · | $2,167,044 | $2,348,837 | APAC-CENTRAL, INC. | +8.4% | 3 |
| Aug 18, 2022 | 220263SSR-256C(068)SR | Okmulgee Division 1 |
RESURFACE (ASPHALT ) SH-16: FROM 0.9 MILES WEST OF THE US -75A JUNCTION, EXTEND EAST IN BEGGS . PROJECT LENGTH = 6.58 MILES · | $2,154,568 | $1,983,074 | APAC-CENTRAL, INC. | -8.0% | 5 |
| Aug 18, 2022 | 220258STP-251B(124)PM | Muskogee Division 1 |
BRIDGE AND APPROACHES SH-2: OVER UNNAMED CREEK, 1.3 MILES NORTH OF THE HASKELL COUNTY LINE NEAR BRIARTOWN. PROJECT LENGTH = 0.075 MILE · | $2,411,530 | $1,966,603 | BRIDGECO CONTRACTORS, INC. | -18.5% | 6 |
| Aug 18, 2022 | 220256SSP-246C(056)PM | Mcintosh Division 1 |
RESURFACE (ASPHALT ) US-266: FROM 0.3 MILES EAST OF US-69, EXTEND EAST IN CHECOTAH . PROJECT LENGTH = 1.701 MILES · | $1,323,774 | $1,509,236 | Rosscon, LLC | +14.0% | 3 |
| Aug 18, 2022 | 220253STP-244D(084)CI | Mcclain Division 3 |
BRIDGE AND APPROACHES COUNTY ROAD (LADD ROAD): OVER UNNAMED CREEK, 0.3 MILES EAST OF I -35 NEAR NOBLE. PROJECT LENGTH = 0.234 MILE · | $903,991 | $842,956 | K & R BUILDERS, INC. | -6.8% | 7 |
| Aug 18, 2022 | 220189CIRB-202D(065)RB | Alfalfa Division 6 |
BRIDGE AND APPROACHES COUNTY ROAD (EW-29): OVER WEST CLAY CREEK , 1.4 MILES EAST OF THE SH -8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.312 MILE · | $819,977 | $774,393 | SEWELL BROS., INC. | -5.6% | 5 |
| Aug 18, 2022 | 220259NHPP-251N(139)PM | Muskogee Division 1 |
RESURFACE (ASPHALT ) US-62B: FROM 0.8 MILES EAST OF THE US -64 J UNCTION, EXTEND SOUTHEAST IN MUSKOGEE . PROJECT LENGTH = 1.2 MILES · | — | $685,243 | Paragon Contractors, LLC | 3 | |
| Aug 18, 2022 | 220255STP-245F(074)3B | Mccurtain Division 2 |
JOINT SEAL /REPAIR US-70/SH-37: AT MULTIPLE LOCATIONS IN DIVISION II. PROJECT LENGTH = 0.00 MILE · | $677,086 | $599,124 | B & B CONSTRUCTION SERVICE J.T., INC. | -11.5% | 4 |
| Aug 18, 2022 | 220257STP-246F(057)3B | Mcintosh, Muskogee |
JOINT SEAL /REPAIR I-40/US-62/US-64 NB/US-69 SB: AT MULTIPLE LOCATIONS IN DIVISION I. PROJECT LENGTH = 0.00 MILE · | $425,712 | $445,741 | McGill Restoration | +4.7% | 4 |
| Aug 18, 2022 | 220250TAP-225F(101)TP | Garvin Division 3 |
PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) CITY STREET (N. MISSOURI STREET): FROM THE SH -29 JUNCTION, EXTEND NORTH IN ELMORE CITY . PROJECT LENGTH = 0.146 MILE · | $191,157 | $197,105 | RUDY CONSTRUCTION CO. | +3.1% | 2 |
| Aug 9, 2022 | 220276IN-MC-62E | Choctaw, Pushmataha |
CABLE BARRIER, TRAFFIC SIGNING AND STRIPING INDIAN NATION TURNPIKE : FROM MILE POST 0.00 TO MILE POST 16.00, BETWEEN HUGO AND ANTLERS . PROJECT LENGTH = 15.837 MILES · | $10,598,906 | $10,446,220 | Built Right Construction, LLC | -1.4% | 3 |
1–22 of 22
Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.