| 10 | 502(B)3310 |
FALSEWORK AND JACKING | 1 | LSUM |
$100,000.00 |
$52,000.00 |
$67,651.28 |
| 20 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 13.3 | LF |
$35.00 |
$31.50 |
$26.98 |
| 30 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$36.50 |
$52.75 |
| 40 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.75 | GAL |
$130.00 |
$155.00 |
$163.27 |
| 50 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$800.00 |
$835.00 |
$1,130.34 |
| 60 | 540 8116 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$6,500.00 |
$15,700.00 |
$7,919.33 |
| 70 | 545 0111 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 18 | EA |
$6,000.00 |
$5,220.00 |
$5,748.58 |
| 80 | 545 0121 |
(PL)REPLACE BRIDGE ITEM (TYPE B) | 18 | EA |
$3,500.00 |
$4,200.00 |
$4,828.61 |
| 90 | 502(B)3310 |
FALSEWORK AND JACKING | 1 | LSUM |
$100,000.00 |
$52,000.00 |
$63,936.13 |
| 100 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 753.4 | LF |
$35.00 |
$31.50 |
$32.72 |
| 110 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$36.50 |
$52.75 |
| 120 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.75 | GAL |
$130.00 |
$155.00 |
$163.27 |
| 130 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$800.00 |
$835.00 |
$1,130.34 |
| 140 | 540 8116 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$16,000.00 |
$15,700.00 |
$17,186.39 |
| 150 | 545 0131 |
(PL)REPLACE BRIDGE ITEM (TYPE C) | 16 | EA |
$6,000.00 |
$5,200.00 |
$5,753.31 |
| 160 | 545 0141 |
(PL)REPLACE BRIDGE ITEM (TYPE D) | 16 | EA |
$3,500.00 |
$4,200.00 |
$4,833.35 |
| 170 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 6,230 | LF |
$1.00 |
$1.55 |
$1.95 |
| 180 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 8,455 | LF |
$1.00 |
$0.5500 |
$0.6500 |
| 190 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 1,183 | EA |
$5.00 |
$5.20 |
$6.49 |
| 200 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 508 | EA |
$5.00 |
$5.20 |
$6.49 |
| 210 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 90 | SD |
$25.00 |
$105.00 |
$64.84 |
| 220 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 90 | SD |
$15.00 |
$10.40 |
$12.96 |
| 230 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 630 | SD |
$1.00 |
$2.10 |
$2.59 |
| 240 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 210 | SD |
$1.50 |
$2.10 |
$2.59 |
| 250 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,710 | SD |
$2.00 |
$2.10 |
$2.59 |
| 260 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 180 | SD |
$2.50 |
$5.20 |
$6.49 |
| 270 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,440 | SD |
$0.2500 |
$0.5500 |
$0.6500 |
| 280 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 7,500 | SD |
$0.1000 |
$0.5500 |
$0.6500 |
| 290 | 880(E)6625 |
(PL) WARNING LIGHTS (HIGH INTENSITY)(SEQUENTIAL FLASHING) | 2,940 | SD |
$0.5000 |
$1.05 |
$1.30 |
| 300 | 880(F)6700 |
DRUMS | 4,560 | SD |
$0.5000 |
$0.5500 |
$0.6500 |
| 310 | 880(G)6805 |
CHANNELIZER CONES | 1,620 | SD |
$0.2500 |
$1.05 |
$1.30 |
| 320 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$15.00 |
$26.00 |
$32.43 |
| 330 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 5,530 | LF |
$1.00 |
$2.40 |
$3.02 |
| 340 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 500 | LF |
$2.00 |
$4.15 |
$5.19 |
| 350 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 200 | LF |
$2.50 |
$5.20 |
$6.49 |
| 360 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$54,000.00 |
$115,000.00 |
$13,815.23 |
| 370 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 27,845 | CY |
$9.00 |
$14.00 |
$14.63 |
| 380 | 202(D)2500 |
UNCLASSIFIED BORROW | 12,771 | CY |
$20.00 |
$8.50 |
$0.1500 |
| 390 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$34,000.00 |
$22,000.00 |
$79,610.14 |
| 400 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,267 | LF |
$5.00 |
$2.50 |
$4.42 |
| 410 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$550.00 |
$410.00 |
$381.79 |
| 420 | 221(E)2600 |
TEMPORARY SILT DIKE | 42 | LF |
$19.00 |
$25.00 |
$15.30 |
| 430 | 230(A)7200 |
SOLID SLAB SODDING | 31,137 | SY |
$4.00 |
$2.50 |
$3.08 |
| 440 | 233(A)0200 |
VEGETATIVE MULCHING | 6.43 | AC |
$1,000.00 |
$900.00 |
$998.47 |
| 450 | 241 3100 |
MOWING | 68.16 | AC |
$225.00 |
$250.00 |
$312.72 |
| 460 | 303(A)1200 |
AGGREGATE BASE TYPE A | 2,598 | CY |
$70.00 |
$50.00 |
$46.15 |
| 470 | 307(K)4200 |
STABILIZED SUBGRADE | 14,877 | SY |
$8.00 |
$7.50 |
$6.13 |
| 480 | 325 0100 |
SEPARATOR FABRIC | 12,411 | SY |
$2.00 |
$2.65 |
$1.89 |
| 490 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,133 | TON |
$27.00 |
$26.00 |
$22.70 |
| 500 | 407(B)7300 |
TACK COAT | 398 | GAL |
$5.00 |
$5.50 |
$5.20 |
| 510 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,499 | TON |
$125.00 |
$132.00 |
$94.33 |
| 520 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 294 | TON |
$145.00 |
$175.00 |
$168.07 |
| 530 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 4,003 | SY |
$25.00 |
$27.00 |
$16.87 |
| 540 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 5,370 | SY |
$40.00 |
$32.00 |
$33.07 |
| 550 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 2,593 | CY |
$210.00 |
$210.00 |
$155.64 |
| 560 | 504(E)5520 |
42" F-SHAPED PARAPET | 2,702 | LF |
$110.00 |
$90.00 |
$100.52 |
| 570 | 509(D)0500 |
CLASS C CONCRETE | 100 | CY |
$360.00 |
$365.00 |
$275.89 |
| 580 | 510(C)1440 |
SLOPE WALL (5") | 475 | SY |
$108.00 |
$135.00 |
$104.13 |
| 590 | 511(A)2200 |
REINFORCING STEEL | 114,630 | LB |
$2.00 |
$1.60 |
$1.45 |
| 600 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 25 | TON |
$55.00 |
$60.00 |
$99.77 |
| 610 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,500.00 |
$3,500.00 |
$3,213.16 |
| 620 | 611(G)0358 |
INLET (SMD-TYPE 2A) | 1 | EA |
$3,500.00 |
$4,000.00 |
$3,891.91 |
| 630 | 612(C)3400 |
INLET ADJUST TO GRADE | 2 | EA |
$800.00 |
$5,500.00 |
$2,473.34 |
| 640 | 613(A)5208 |
18" R.C.PIPE CLASS III | 12 | LF |
$75.00 |
$150.00 |
$163.27 |
| 650 | 613(A)5220 |
30" R.C.PIPE CLASS III | 22 | LF |
$110.00 |
$175.00 |
$130.30 |
| 660 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 250 | LF |
$29.00 |
$17.00 |
$16.71 |
| 670 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 189 | LF |
$24.00 |
$21.00 |
$21.60 |
| 680 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$25.00 |
$30.00 |
$71.61 |
| 690 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 63 | LF |
$24.00 |
$21.00 |
$30.90 |
| 700 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 3 | EA |
$1,000.00 |
$575.00 |
$996.46 |
| 710 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$11,500.00 |
$6,072.89 |
| 720 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 289 | SY |
$14.00 |
$12.00 |
$16.07 |
| 730 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,886 | SY |
$9.00 |
$6.00 |
$3.88 |
| 740 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 3,788 | SY |
$12.00 |
$9.00 |
$12.70 |
| 750 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 4,096 | LF |
$4.50 |
$3.25 |
$3.77 |
| 760 | 619(C)6600 |
SAWING PAVEMENT | 5,474 | LF |
$3.50 |
$2.50 |
$2.78 |
| 770 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$2,800.00 |
$6,400.00 |
$6,279.65 |
| 780 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 280 | CY |
$30.00 |
$85.00 |
$20.93 |
| 790 | 501(G)1800 |
CLSM BACKFILL | 261 | CY |
$200.00 |
$240.00 |
$225.91 |
| 800 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$300,000.00 |
$125,000.00 |
$113,342.63 |
| 810 | 502(A)3200 |
ENGINEERED FALSEWORK | 1 | LSUM |
$400,000.00 |
$60,000.00 |
$105,737.49 |
| 820 | 504(A)5200 |
APPROACH SLAB | 310.9 | SY |
$300.00 |
$240.00 |
$277.89 |
| 830 | 504(B)5300 |
SAW-CUT GROOVING | 5,807 | SY |
$8.00 |
$4.60 |
$5.53 |
| 840 | 504(E)5520 |
42" F-SHAPED PARAPET | 2,487.5 | LF |
$120.00 |
$72.00 |
$94.87 |
| 850 | 506(A)7200 |
STRUCTURAL STEEL | 2,291,720 | LB |
$3.00 |
$3.00 |
$2.79 |
| 860 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$8,000.00 |
$9,200.00 |
$9,770.63 |
| 870 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 50 | EA |
$8,000.00 |
$9,200.00 |
$9,770.63 |
| 880 | 509 0120 |
ELASTOMERIC COATING | 4,165 | SF |
$22.00 |
$18.00 |
$25.12 |
| 890 | 509(A)0210 |
CLASS AA CONCRETE | 1,410.8 | CY |
$1,000.00 |
$700.00 |
$1,113.66 |
| 900 | 509(B)0320 |
CLASS A CONCRETE | 1,316.1 | CY |
$900.00 |
$925.00 |
$912.33 |
| 910 | 509(D)0510 |
CLASS C CONCRETE | 17.2 | CY |
$800.00 |
$675.00 |
$484.70 |
| 920 | 510(C)1450 |
SLOPE WALL (5") | 620 | SY |
$120.00 |
$130.00 |
$154.59 |
| 930 | 511(A)2210 |
REINFORCING STEEL | 35,990 | LB |
$1.50 |
$1.60 |
$1.56 |
| 940 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 552,900 | LB |
$2.00 |
$1.75 |
$1.79 |
| 950 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 249 | LF |
$50.00 |
$55.00 |
$52.71 |
| 960 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 837 | LF |
$60.00 |
$65.00 |
$65.20 |
| 970 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 249 | LF |
$26.00 |
$11.00 |
$36.69 |
| 980 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 837 | LF |
$26.00 |
$12.00 |
$43.07 |
| 990 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
| 1,000 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,996 | SY |
$6.00 |
$4.70 |
$5.65 |
| 1,010 | 516(A)8255 |
DRILLED SHAFTS 84" DIAMETER | 666 | LF |
$2,200.00 |
$1,900.00 |
$2,037.18 |
| 1,020 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$5,000.00 |
$2,000.00 |
$2,009.49 |
| 1,030 | 518(B)0300 |
SEALED EXPANSION JOINTS | 172 | LF |
$380.00 |
$350.00 |
$364.82 |
| 1,040 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$50.00 |
$36.50 |
$52.75 |
| 1,050 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 5 | GAL |
$100.00 |
$155.00 |
$163.27 |
| 1,060 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$100.00 |
$825.00 |
$1,130.34 |
| 1,070 | 523(A)3200 |
SEALER CRACK PREPARATION | 378 | LF |
$6.00 |
$4.20 |
$5.03 |
| 1,080 | 523(B)3300 |
SEALER RESIN | 3.8 | GAL |
$200.00 |
$230.00 |
$276.30 |
| 1,090 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 100 | SY |
$60.00 |
$40.00 |
$52.75 |
| 1,100 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 182 | LF |
$60.00 |
$35.00 |
$25.16 |
| 1,110 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 62 | LF |
$60.00 |
$32.00 |
$18.93 |
| 1,120 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,000.00 |
$700.00 |
$433.19 |
| 1,130 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$300,000.00 |
$109,000.00 |
$338,852.82 |
| 1,140 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 144 | LF |
$1,000.00 |
$1,125.00 |
$1,426.60 |
| 1,150 | 805(A)3236 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 2 | EA |
$11,000.00 |
$11,050.00 |
$12,969.07 |
| 1,160 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$200.00 |
$260.00 |
$324.23 |
| 1,170 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$315.00 |
$2,600.00 |
$3,242.27 |
| 1,180 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 266 | SF |
$28.00 |
$35.50 |
$44.42 |
| 1,190 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 3 | SF |
$47.00 |
$41.50 |
$51.88 |
| 1,200 | 850(B)1320 |
EXTR.ALUM.PAN.SGN.(OVRHD SIGNS) | 1,034 | SF |
$28.00 |
$41.50 |
$51.88 |
| 1,210 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 110 | LF |
$17.00 |
$21.00 |
$25.94 |
| 1,220 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 137 | LF |
$13.00 |
$21.00 |
$25.94 |
| 1,230 | 852(D)3512 |
OVHD.SN.STR., MONOTUBE TYPE B 70' | 1 | EA |
$124,300.00 |
$128,000.00 |
$162,113.37 |
| 1,240 | 852(D)3564 |
POWDER COAT TYPE B1 | 1 | EA |
$9,000.00 |
$14,600.00 |
$18,156.70 |
| 1,250 | 852(E)3600 |
OVHD.SN.STR., MONOTUBE TYPE C | 2 | EA |
$80,000.00 |
$61,000.00 |
$76,517.52 |
| 1,260 | 852(E)3610 |
POWDER COAT TYPE C | 2 | EA |
$6,000.00 |
$6,250.00 |
$7,781.44 |
| 1,270 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 8,833 | LF |
$0.7500 |
$1.85 |
$2.27 |
| 1,280 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,029 | LF |
$2.00 |
$3.10 |
$3.89 |
| 1,290 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 782 | LF |
$2.75 |
$5.75 |
$7.14 |
| 1,300 | 871(A)2210 |
(PL) IMPACT ATTENUATOR | 2 | EA |
$2,700.00 |
$31,300.00 |
$38,907.21 |
| 1,310 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 1,635 | LF |
$0.5000 |
$1.05 |
$1.30 |
| 1,320 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 37,031 | LF |
$1.00 |
$1.55 |
$1.95 |
| 1,330 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,667 | LF |
$0.6900 |
$1.05 |
$1.30 |
| 1,340 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 5,081 | EA |
$3.00 |
$3.10 |
$3.89 |
| 1,350 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 2,327 | EA |
$4.00 |
$3.10 |
$3.89 |
| 1,360 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,030 | SD |
$8.00 |
$15.50 |
$19.45 |
| 1,370 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,719 | LF |
$25.00 |
$32.00 |
$20.39 |
| 1,380 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 4,504 | LF |
$7.50 |
$4.00 |
$6.80 |
| 1,390 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 920 | SD |
$5.00 |
$10.50 |
$12.96 |
| 1,400 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,040 | SD |
$0.2500 |
$1.05 |
$1.30 |
| 1,410 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 11,612 | SD |
$1.00 |
$1.33 |
$1.62 |
| 1,420 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 15,910 | SD |
$1.75 |
$2.10 |
$2.59 |
| 1,430 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,750 | SD |
$0.7000 |
$2.10 |
$2.59 |
| 1,440 | 880(D)6500 |
VERTICAL PANELS | 2,610 | SD |
$0.2500 |
$1.05 |
$1.30 |
| 1,450 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 23,960 | SD |
$0.2500 |
$0.3300 |
$0.3900 |
| 1,460 | 880(F)6700 |
DRUMS | 87,536 | SD |
$0.2500 |
$0.2700 |
$0.3200 |
| 1,470 | 880(G)6800 |
TUBE CHANNELIZERS | 1,620 | SD |
$0.7000 |
$1.05 |
$1.30 |
| 1,480 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 2,040 | HOUR |
$77.00 |
$77.00 |
$77.00 |
| 1,490 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 368 | SD |
$15.00 |
$26.00 |
$32.43 |
| 1,500 | 802(A)0240 |
2" GALV.STEEL ELECT.COND. EXPOSED | 1,332 | LF |
$42.00 |
$57.00 |
$69.08 |
| 1,510 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,390 | LF |
$42.00 |
$41.00 |
$50.24 |
| 1,520 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,650 | LF |
$18.00 |
$27.00 |
$32.66 |
| 1,530 | 802(E)0620 |
JUNCTION BOX (12"X12"X8") | 10 | EA |
$1,400.00 |
$2,650.00 |
$3,202.62 |
| 1,540 | 803(A)1220 |
PULL BOX(SIZE II) | 18 | EA |
$1,300.00 |
$2,100.00 |
$2,574.66 |
| 1,550 | 804(A)2200 |
STRUCTURAL CONCRETE | 27.88 | CY |
$1,100.00 |
$935.00 |
$1,130.34 |
| 1,560 | 804(B)2300 |
REINFORCING STEEL | 4,828 | LB |
$2.50 |
$2.60 |
$3.14 |
| 1,570 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 16 | EA |
$480.00 |
$520.00 |
$627.97 |
| 1,580 | 805(B)3308 |
(PL)RESET OF LIGHT POLE | 4 | EA |
$1,200.00 |
$4,350.00 |
$5,362.82 |
| 1,590 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 26 | EA |
$5,500.00 |
$6,000.00 |
$7,409.99 |
| 1,600 | 806(C)4536 |
POWDER COAT LIGHTING POLE | 26 | EA |
$600.00 |
$1,300.00 |
$1,569.91 |
| 1,610 | 807 5120 |
BREAKAWAY BASE (DES. B) | 16 | EA |
$900.00 |
$1,100.00 |
$1,331.28 |
| 1,620 | 809(A)7200 |
ROADWAY LUMINAIRE | 26 | EA |
$2,400.00 |
$2,300.00 |
$2,876.08 |
| 1,630 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$7,000.00 |
$4,000.00 |
$4,584.15 |
| 1,640 | 811 9115 |
1/C NO.4 ELECT.COND. | 7,108 | LF |
$4.50 |
$3.60 |
$4.40 |
| 1,650 | 811 9125 |
1/C NO.8 ELECT.COND. | 6,384 | LF |
$4.50 |
$3.10 |
$3.77 |
| 1,660 | 811 9135 |
1/C NO.12 ELECT.COND. | 4,514 | LF |
$1.50 |
$2.10 |
$2.51 |
| 1,670 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$130,000.00 |
$132,600.00 |
$106,031.92 |
| 1,680 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,200.77 |
$3,139.83 |
| 1,690 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$894,000.00 |
$808,180.00 |
$895,517.09 |