| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$45,000.00 |
$19,500.00 |
$10,000.00 |
$20,000.00 |
$6,200.00 |
$19,500.00 |
$15,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 16,579 | CY |
$12.75 |
$11.00 |
$6.65 |
$10.81 |
$12.04 |
$13.05 |
$10.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 21,917 | CY |
$14.00 |
$13.00 |
$8.65 |
$11.00 |
$13.37 |
$13.65 |
$16.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,000.00 |
$8,400.00 |
$25,000.00 |
$10,000.00 |
$13,000.00 |
$33,250.00 |
$25,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,291 | LF |
$3.00 |
$3.25 |
$2.70 |
$2.47 |
$2.25 |
$3.85 |
$4.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 154 | LF |
$15.00 |
$14.50 |
$15.00 |
$13.75 |
$12.50 |
$19.83 |
$15.00 |
| 70 | 229 6100 |
DITCH LINER PROTECTION | 868 | LF |
$4.70 |
$4.50 |
$4.79 |
$4.40 |
$3.99 |
$3.30 |
$5.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 24,439 | SY |
$4.00 |
$2.75 |
$2.99 |
$2.75 |
$2.49 |
$2.80 |
$4.00 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 1 | AC |
$125.00 |
$120.00 |
$120.00 |
$110.00 |
$100.00 |
$1,100.00 |
$100.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$1,750.00 |
$120.00 |
$120.00 |
$110.00 |
$100.00 |
$1,100.00 |
$100.00 |
| 110 | 241 3100 |
MOWING | 1.18 | AC |
$300.00 |
$1,650.00 |
$1,794.00 |
$250.00 |
$1,495.00 |
$1,100.00 |
$1,500.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 482 | CY |
$75.00 |
$69.75 |
$52.00 |
$95.00 |
$86.00 |
$76.50 |
$70.00 |
| 121 | 325 0100 |
SEPARATOR FABRIC | 6,483 | SY |
$2.25 |
$1.86 |
$1.90 |
$3.50 |
$2.17 |
$2.37 |
$2.00 |
| 122 | 326(B)1300 |
GEOGRID REINFORCEMENT | 6,483 | SY |
$1.50 |
$1.95 |
$3.85 |
$7.25 |
$2.17 |
$2.39 |
$2.00 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 326 | TON |
$40.00 |
$36.90 |
$27.50 |
$46.00 |
$42.56 |
$43.40 |
$80.00 |
| 150 | 407(B)7300 |
TACK COAT | 786 | GAL |
$3.00 |
$4.50 |
$9.88 |
$5.00 |
$5.17 |
$3.45 |
$4.00 |
| 160 | 408 8100 |
PRIME COAT | 1,908 | GAL |
$6.00 |
$6.60 |
$4.20 |
$6.00 |
$6.88 |
$5.96 |
$6.00 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,435 | TON |
$140.00 |
$119.00 |
$120.00 |
$127.00 |
$119.33 |
$133.25 |
$130.00 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 965 | TON |
$150.00 |
$153.30 |
$127.00 |
$165.00 |
$123.47 |
$148.00 |
$165.00 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 3,167 | SY |
$3.00 |
$6.83 |
$4.90 |
$10.00 |
$6.93 |
$5.50 |
$12.00 |
| 200 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 508 | LF |
$145.00 |
$130.00 |
$172.00 |
$130.00 |
$221.00 |
$130.00 |
$150.00 |
| 210 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 29 | LF |
$45.00 |
$75.00 |
$20.00 |
$57.00 |
$34.00 |
$67.75 |
$35.00 |
| 220 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$45.00 |
$175.00 |
$18.00 |
$130.00 |
$57.00 |
$185.00 |
$60.00 |
| 230 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 1 | EA |
$615.00 |
$1,500.00 |
$450.00 |
$900.00 |
$750.00 |
$2,750.00 |
$2,000.00 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$11,900.00 |
$4,000.00 |
$15,000.00 |
$7,000.00 |
$4,867.00 |
$11,025.00 |
$15,000.00 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 4,467 | SY |
$15.50 |
$6.83 |
$15.90 |
$11.00 |
$8.00 |
$7.25 |
$10.00 |
| 260 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 904 | LF |
$4.50 |
$4.00 |
$4.00 |
$6.00 |
$5.00 |
$6.75 |
$5.00 |
| 270 | 619(C)6600 |
SAWING PAVEMENT | 763 | LF |
$5.95 |
$9.00 |
$2.00 |
$5.00 |
$8.00 |
$4.05 |
$5.00 |
| 280 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,173 | LF |
$6.50 |
$23.00 |
$15.62 |
$15.62 |
$8.00 |
$8.55 |
$25.00 |
| 290 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 746 | CY |
$25.00 |
$12.00 |
$10.50 |
$8.75 |
$20.00 |
$19.05 |
$20.00 |
| 300 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 375 | CY |
$28.00 |
$18.00 |
$25.00 |
$13.60 |
$20.00 |
$27.50 |
$20.00 |
| 310 | 509(A)0210 |
CLASS AA CONCRETE | 829 | CY |
$690.00 |
$520.00 |
$645.00 |
$535.00 |
$690.00 |
$650.00 |
$870.00 |
| 320 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 128,660 | LB |
$1.75 |
$1.62 |
$1.35 |
$1.64 |
$1.50 |
$1.38 |
$1.75 |
| 330 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$20,000.00 |
$20,000.00 |
$40,000.00 |
$40,000.00 |
$35,250.00 |
$25,000.00 |
| 340 | 854(A)6200 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,400 | LF |
$0.2500 |
$0.2700 |
$0.3000 |
$0.2800 |
$0.2500 |
$0.5500 |
$0.5000 |
| 350 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,000 | LF |
$0.3000 |
$0.2700 |
$0.3000 |
$0.2800 |
$0.2500 |
$0.5500 |
$0.5000 |
| 360 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 390 | EA |
$2.00 |
$4.20 |
$4.80 |
$4.40 |
$4.00 |
$5.51 |
$7.00 |
| 370 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 390 | EA |
$6.00 |
$4.20 |
$4.80 |
$4.40 |
$4.00 |
$5.51 |
$9.00 |
| 380 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 30 | SD |
$15.90 |
$22.00 |
$24.00 |
$22.00 |
$20.00 |
$93.62 |
$20.00 |
| 390 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,260 | SD |
$0.4000 |
$1.10 |
$1.20 |
$1.10 |
$1.00 |
$0.5500 |
$1.00 |
| 400 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,100 | SD |
$0.7000 |
$1.10 |
$1.20 |
$1.10 |
$1.00 |
$1.10 |
$1.00 |
| 410 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,150 | SD |
$1.70 |
$1.10 |
$1.20 |
$1.10 |
$1.00 |
$2.20 |
$1.00 |
| 420 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,050 | SD |
$0.8000 |
$1.10 |
$1.20 |
$1.10 |
$1.00 |
$1.10 |
$1.00 |
| 430 | 880(D)6500 |
VERTICAL PANELS | 3,150 | SD |
$0.1500 |
$0.4700 |
$0.5400 |
$0.5000 |
$0.4500 |
$0.2800 |
$0.4500 |
| 440 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,200 | SD |
$0.3000 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.3900 |
$0.0500 |
| 450 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 8,190 | SD |
$0.3000 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.3900 |
$0.0500 |
| 460 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 9,030 | SD |
$0.1000 |
$0.2100 |
$0.2300 |
$0.2100 |
$0.1900 |
$0.1100 |
$0.1900 |
| 470 | 880(F)6700 |
DRUMS | 6,090 | SD |
$0.2000 |
$0.2200 |
$0.2400 |
$0.2200 |
$0.2000 |
$0.3900 |
$0.2000 |
| 480 | 880(G)6805 |
CHANNELIZER CONES | 10,080 | SD |
$0.3000 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.2800 |
$0.0500 |
| 490 | 880(I)7000 |
FLAGGER | 30 | SD |
$167.00 |
$260.00 |
$125.00 |
$300.00 |
$250.00 |
$390.00 |
$10.00 |
| 500 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 448 | SD |
$11.50 |
$13.15 |
$15.00 |
$13.75 |
$12.50 |
$33.04 |
$12.50 |
| 510 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$98.00 |
$100.00 |
$60.00 |
$55.00 |
$50.00 |
$55.00 |
$100.00 |
| 520 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 15.38 | SF |
$23.00 |
$37.00 |
$42.00 |
$38.50 |
$35.00 |
$19.80 |
$50.00 |
| 530 | 851(C)2415 |
2" SQUARE TUBE POST | 28 | LF |
$10.00 |
$21.00 |
$24.00 |
$22.00 |
$20.00 |
$11.00 |
$25.00 |
| 540 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 3,830 | LF |
$0.6000 |
$1.30 |
$1.46 |
$1.35 |
$1.22 |
$1.65 |
$3.00 |
| 550 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$10,100.00 |
$10,000.00 |
$7,700.00 |
$10,000.00 |
$11,000.00 |
$20,000.00 |
| 560 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,500.00 |
$4,250.00 |
$4,000.00 |
$1,650.00 |
$5,000.00 |
| 570 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$92,000.00 |
$175,000.00 |
$105,000.00 |
$125,000.00 |
$105,000.00 |
$300,000.00 |